Street Lighting and Electrical Distribution Sample Clauses

Street Lighting and Electrical Distribution. The Owner shall be responsible for the supply and installation of all street lighting poles, luminaries, brackets, wiring and controls, etc. Equipment and installation shall meet the standards of the City, as revised from time to time. Wiring shall be done to the standards required by Hydro One Networks Inc. and all expenses incurred by Hydro One Networks Inc. and the City for inspection of the street lighting works and the connection of the street lighting works into Hydro One Networks Inc. electrical system shall be borne by the Owner. Prior to energization of the street light and electrical distribution system the Owner shall contact the Electrical Safety Authority (hereinafter referred to as “ESA”) at 0-000-000-0000 and schedule the inspection of the street light and electrical distribution system works, arrange for a copy of the ESA’s “Connection Authorization” to be forwarded to the Director and arrange for Hydro One Networks Inc. to provide the Director with 48 hours notification of their intent to energize the street light and electrical distribution system. The Owner shall ensure that no shrubs or trees are planted closer than one (1) metre from the three sides of any hydro transformer and not within two
AutoNDA by SimpleDocs

Related to Street Lighting and Electrical Distribution

  • Street Lighting 4.4.1 The Developer shall provide streetlights for the entire Subdivision at his sole expense. The type of lighting standard, pole spacing, and installation shall be per Memphis Light, Gas and Water standards. Memphis Light Gas and Water shall bill the City for installation of street lighting per its standards.

  • Unbundled Subloop Distribution (USLD) 2.8.2.1 The USLD facility is a dedicated transmission facility that BellSouth provides from an End User’s point of demarcation to a BellSouth cross-connect device. The BellSouth cross-connect device may be located within a remote terminal (RT) or a stand-alone cross-box in the field or in the equipment room of a building. The USLD media is a copper twisted pair that can be provisioned as a 2-wire or 4-wire facility. BellSouth will make available the following subloop distribution offerings where facilities exist: USLD – Voice Grade (USLD-VG) Unbundled Copper Subloop (UCSL) USLD – Intrabuilding Network Cable (USLD-INC (aka riser cable))

  • Electrical Power CUSTOMER acknowledges that the Services will not function in the absence of electrical power.

  • Unbundled Sub-Loop Distribution Intrabuilding Network Cable (USLD-INC) is the distribution facility owned or controlled by BellSouth inside a building or between buildings on the same property that is not separated by a public street or road. USLD-INC includes the facility from the cross connect device in the building equipment room up to and including the point of demarcation at the End User’s premises.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • COSTS DISTRIBUTED THROUGH COUNTYWIDE COST ALLOCATIONS The indirect overhead and support service costs listed in the Summary Schedule (attached) are formally approved as actual costs for fiscal year 2020-21, and as estimated costs for fiscal year 2022-23 on a “fixed with carry-forward” basis. These costs may be included as part of the county departments’ costs indicated effective July 1, 2022, for further allocation to federal grants and contracts performed by the respective county departments.

  • Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

  • Outpatient emergency and urgicenter services within the service area The emergency room copay applies to all outpatient emergency visits that do not result in hospital admission within twenty-four (24) hours. The urgicenter copay is the same as the primary care clinic office visit copay.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.