Submission for Full Scheme Approval Sample Clauses

Submission for Full Scheme Approval. By a Sponsor UA’s Chief Executive (or equivalent) of a full business case to the AB (in the form of doc.2 at Annex A).
AutoNDA by SimpleDocs

Related to Submission for Full Scheme Approval

  • Resubmission If terminated, resolved or withdrawn, a grievance cannot be resubmitted.

  • ROAD WORK PHASE APPROVAL Purchaser shall obtain written approval from the Contract Administrator upon completion of each of the following phases of road work:  Drainage installation  Subgrade compaction  Rock compaction SUBSECTION RESTRICTIONS

  • Plan Approval 5.5.1.1 The A/E shall secure the required structural, plumbing, HVAC, and electrical plan approvals.

  • Approval/Non-Approval We will notify you whether your Application has been approved or denied within 14 days after the date we receive a completed Application. Notification may be in person or by mail or telephone unless you have requested that notification be by mail. You must not assume approval until you receive actual notice of approval. The 14-day time period may be changed only by separate written agreement.

  • Course Approval Approval for dual credit shall be by the LEA and POSTSECONDARY INSTITUTION representatives on a course-by-course basis each semester based on the student’s prior coursework, career pathway, and/or academic readiness. There is no state limit to the number of credits a student may earn through dual credit in an academic term; however, the student must meet eligibility requirements.

  • Submission and Approval The Contractor’s Submittals must comply with the Contract Documents. The Contractor shall review and approve all Submittals prior to submission. The Contract Documents shall specify when shop drawings or submittals require the seal of a specialty consultant. The Contractor shall submit copies of Submittals as required by the Contract Documents for the Work of the various trades. The Design Professional shall review, approve, or take other appropriate action with respect to shop drawings, samples, or other submissions of the Contractor, including, but not limited to, confirming conformance with the design concept of the Project and with the Contract Documents. The Design Professional shall respond to and return said items to the Contractor within fourteen calendar days from receipt provided that the Submittals are submitted by the Contractor in accordance with the required Submittal schedule. The Design Professional shall review and give comment or approval to Submittal schedule within fourteen calendar days from receipt. Large submittal documents may require longer review times, e.g., submittals with over fifty sheets of drawings. If, because of events beyond its reasonable control, the Design Professional is not able to meet the specified time period, then it is entitled to ask for additional time from the Owner. The Contractor shall make all corrections required by the Design Professional and furnish such corrected copies as may be needed. If the Contractor believes that any corrections required by the Design Professional constitute a change to the contract, the Contractor shall immediately notify the Design Professional and Owner and request instructions. By forwarding the approved Submittals to the Design Professional, the Contractor represents that the Contractor has determined and verified materials, field measurements, and field construction criteria related thereto, or will do so, and has checked and coordinated the information contained within such Submittals with the requirements of the Work and of the Contract Documents. The Design Professional’s approval of Submittals shall not relieve the Contractor from the responsibility for errors of any sort in Submittals or schedules. The Contractor shall perform no portion of the Work for which the Contract Documents require Submittals until the Design Professional has approved the respective Submittal. The Contractor shall maintain at the Site one copy of all approved Submittals.

  • Application Approval Our representative will notify you (or one of you, if there are co-applicants) of the Application approval, execute the Lease agreements for signature prior to occupancy, and, once complete, credit the application deposit of all applicants toward the required security deposit.

  • BOARD’S APPROVAL The Agreements were approved by the Board. Since no Director has material interest in the transactions contemplated under the Agreements, thus none of the Directors abstained from voting at the Board’s meeting to approve the Agreements.

  • State Approval of Replacement Personnel The Engineer may not replace the project manager or key personnel without prior consent of the State. The State must be satisfied that the new project manager or other key personnel is qualified to provide the authorized services. If the State determines that the new project manager or key personnel is not acceptable, the Engineer may not use that person in that capacity and shall replace him or her with one satisfactory to the State within forty-five (45) days.

  • FERC Approval Notwithstanding any other provision of this Appendix 2, no termination hereunder shall become effective until the Interconnected Entities and/or Transmission Provider have complied with all Applicable Laws and Regulations applicable to such termination, including the filing with the FERC of a notice of termination of the Interconnection Service Agreement, and acceptance of such notice for filing by the FERC.