Submission and Approval. The Contractor’s Submittals must comply with the Contract Documents. The Contractor shall review and approve all Submittals prior to submission. The Contract Documents shall specify when shop drawings or submittals require the seal of a specialty consultant. The Contractor shall submit copies of Submittals as required by the Contract Documents for the Work of the various trades. The Design Professional shall review, approve, or take other appropriate action with respect to shop drawings, samples, or other submissions of the Contractor, including, but not limited to, confirming conformance with the design concept of the Project and with the Contract Documents. The Design Professional shall respond to and return said items to the Contractor within fourteen calendar days from receipt provided that the Submittals are submitted by the Contractor in accordance with the required Submittal schedule. The Design Professional shall review and give comment or approval to Submittal schedule within fourteen calendar days from receipt. Large submittal documents may require longer review times, e.g., submittals with over fifty sheets of drawings. If, because of events beyond its reasonable control, the Design Professional is not able to meet the specified time period, then it is entitled to ask for additional time from the Owner. The Contractor shall make all corrections required by the Design Professional and furnish such corrected copies as may be needed. If the Contractor believes that any corrections required by the Design Professional constitute a change to the contract, the Contractor shall immediately notify the Design Professional and Owner and request instructions. By forwarding the approved Submittals to the Design Professional, the Contractor represents that the Contractor has determined and verified materials, field measurements, and field construction criteria related thereto, or will do so, and has checked and coordinated the information contained within such Submittals with the requirements of the Work and of the Contract Documents. The Design Professional’s approval of Submittals shall not relieve the Contractor from the responsibility for errors of any sort in Submittals or schedules. The Contractor shall perform no portion of the Work for which the Contract Documents require Submittals until the Design Professional has approved the respective Submittal. The Contractor shall maintain at the Site one copy of all approved Submittals.
Submission and Approval. The Design-Builder’s Submittals must comply with the Contract Documents. The Design-Builder shall review and approve all Submittals prior to submission. The Contract Documents shall specify when shop drawings or submittals require the seal of a specialty consultant. The Design-Builder shall submit copies of Submittals as required by the Contract Documents for the Work of the various trades. The Design-Builder shall perform no portion of the Work for which the Contract Documents require Submittals until the Design Professioanl has approved the respective Submittal. The Design-Builder shall maintain at the Site one copy of all approved Submittals.
Submission and Approval. Maintenance Contractor, within 240 Days after issuance by TxDOT of Maintenance NTP1, shall submit to TxDOT, for TxDOT’s review and approval, a Maintenance Transition Plan as described in Section 0208 of Exhibit 2.
Submission and Approval. Seller may, from time to time, submit a Credit File or Loan File to Arc for approval in accordance with the Arc Correspondent Seller's Guide. All submissions must be consistent for the loan types, programs and limitations as further defined in the applicable Arc Guide and/or this Agreement.
Submission and Approval. 4.1 Upon WEPCo’s confirmation of the New Project Request, WEPCo will (pursuant to Paragraph 4.1) produce outline proposals for New Projects, which develop and are consistent with the SDP where so requested. This is known as the Stage 1 Submission.
4.2 All Stage 1 Submissions will be produced within three (3) months (or such longer period up to a maximum of six (6) months where necessary) from the New Project Request. A Stage 1 Submission shall (as set out in Paragraph 4.2) be produced in accordance with the relevant Partnering Services Method Statement (to be incorporated into the SPA) and contain as a minimum (more expressly set out in Paragraphs 4.2.1 to 4.2.13):
4.2.1 a value for money assessment in respect of the New Project Request;
4.2.2 a concept design (to RIBA Stage 2) of the New Project;
4.2.3 a desktop study meeting the requirements of the Partnering Services Method Statements, site investigation studies and environmental impacts (as appropriate and as set out in Clause 4.2.3 more explicitly);
4.2.4 confirmation as to whether the New Project requires the transfer of properties by the Participant to WEPCo, to a Project Service Provider, or to a wholly owned Subsidiary of WEPCo;
4.2.5 the identity of the contractual structure and proposed corporate structure;
4.2.6 a schedule of all material amendments required to the New Project Specific Project Agreement and template Project Agreement for MIM Projects taking into account the Approval Criteria;
4.2.7 the identity of the Participant and/or other parties who will become Project Agreement Counterparties;
4.2.8 an explanation as to how the New Project fits into the service delivery strategy as set out in the latest SDP;
4.2.9 the effect (if any) on any employees of the Participant or relevant third party service providers;
4.2.10 a planning brief;
4.2.11 a maximum time period for submission of a Stage 2 Submission on the assumption that the New Tender Project achieves Stage 1 Approval;
4.2.12 the proposed Project Development Fee Estimate; and
4.2.13 a BIM Execution Plan.
4.3 The Stage 1 Submission must also be accompanied by a copy of the most recent WEPCo Performance Report and confirmation as to whether or not the Track Record Test has been passed at the date of submission of the Stage 1 Submission.
4.4 In developing a Stage 1 Submission, WEPCo shall (pursuant to Paragraph 4.3) liaise with the Participant and relevant end users as necessary to ensure the best available value for money is achieved t...
Submission and Approval. 3.1.27.3 Schedule.
Submission and Approval. A State shall submit to the Secretary annually for approval a program of projects. The program shall contain an assurance that the program provides for maximum feasible coordination of transportation services assisted under this section with transportation services assisted by other Government sources.
Submission and Approval. A. No Work shall be undertaken until its design has been submitted to and approved by the RDA. Following approval, the Participant shall contract for the Work within one hundred eighty (180) days from the date of approval by the RDA Grant Review Committee.
B. All Work shall be completed within nine (9) months of the date of approval by the RDA Grant Review Committee.
Submission and Approval. A. No Work shall be undertaken until the proposed design has been submitted to and approved by the RDA.
B. This Agreement must be executed by the Participant within thirty (30) days of the date of RDA approval.
C. All Work shall be completed within twelve (12) months of the Effective Date (defined above) or the date a building permit (if required) is issued by the City of Elko (whichever is later). If a building permit is required for the Work, the Participant must submit all necessary documentation to the City of Elko Building Department within one hundred twenty (120) days of the date of RDA approval.
Submission and Approval. A. No Work shall be undertaken until the proposed design has been submitted to and the grant has been approved by the Agency.
B. This Agreement must be executed by the Participant within thirty (30) days of the date of Agency approval.
C. All Work shall be completed within twelve (12) months of the Effective Date (defined above) or the date a building permit (if required) is issued by the City of Elko (whichever is later). If a building permit is required for the Work, the Participant must submit all necessary documentation to the City of Elko Building Department within one hundred twenty (120) days of the date of Agency approval.