Subsequent Calibrations Sample Clauses

Subsequent Calibrations. (A) If the Generator undertakes a subsequent calibration of a Main Meter or a Check Meter (each such calibration being a “Subsequent Metering Calibration Test”), the Generator must give the CfD Counterparty a minimum of ten (10) Business Days’ notice prior to undertaking that Subsequent Metering Calibration Test.
AutoNDA by SimpleDocs

Related to Subsequent Calibrations

  • Calibration The comparison of a measurement system or device of unverified accuracy with a measurement system of known and greater accuracy to detect deviation of the unverified measurement system from required performance specifications (of the unverified measurement system or device) and to quantify all measured values to applicable units of the international system of units.

  • Technical Objections No grievance shall be defeated merely because of a technical error, other than time limitations in the processing of the grievance through the grievance procedure. To this end, an arbitrator shall have the power to waive formal procedural irregularities in the processing of the grievance in order to determine the real matter in dispute.

  • Initial Trunk Forecast Requirements At least ninety (90) days before initiating interconnection in a LATA, Emergency shall provide Verizon a two (2)-year traffic forecast that complies with the Verizon Interconnection Trunking Forecast Guide, as revised from time to time. This initial traffic forecast will provide the amount of traffic to be delivered to and from Verizon over each of the Interconnection Trunk groups in the LATA over the next eight (8) quarters.

  • Initial Forecasts/Trunking Requirements Because Verizon’s trunking requirements will, at least during an initial period, be dependent on the Customer segments and service segments within Customer segments to whom CSTC decides to market its services, Verizon will be largely dependent on CSTC to provide accurate trunk forecasts for both inbound (from Verizon) and outbound (to Verizon) traffic. Verizon will, as an initial matter, provide the same number of trunks to terminate Reciprocal Compensation Traffic to CSTC as CSTC provides to terminate Reciprocal Compensation Traffic to Verizon. At Verizon’s discretion, when CSTC expressly identifies particular situations that are expected to produce traffic that is substantially skewed in either the inbound or outbound direction, Verizon will provide the number of trunks CSTC suggests; provided, however, that in all cases Verizon’s provision of the forecasted number of trunks to CSTC is conditioned on the following: that such forecast is based on reasonable engineering criteria, there are no capacity constraints, and CSTC’s previous forecasts have proven to be reliable and accurate.

  • Ongoing Trunk Forecast Requirements Where the Parties have already established interconnection in a LATA, Onvoy shall provide a new or revised traffic forecast that complies with the Frontier Interconnection Trunking Forecast Guide when Xxxxx develops plans or becomes aware of information that will materially affect the Parties’ interconnection in that LATA. Instances that require a new or revised forecast include, but are not limited to: (a) Onvoy plans to deploy a new switch; (b) Onvoy plans to implement a new POI or network architecture; (c) Onvoy plans to rearrange its network; (d) Onvoy plans to convert a One-Way Interconnection Trunk group to a Two-Way Interconnection Trunk group; (e) Onvoy plans to convert a Two-Way Interconnection Trunk group to a One-Way Interconnection Trunk group; or (f) Onvoy expects a significant change in interconnection traffic volume. In addition, upon request by either Party, the Parties shall meet to: (i) review traffic and usage data on End Office and Tandem Interconnection Trunk groups and (ii) determine whether the Parties should establish new Interconnection Trunk groups, augment existing Interconnection Trunk groups, or disconnect existing Interconnection Trunks.

  • Leave for Writing Examinations Leave of absence with pay shall be granted to allow employees time to write examinations for courses approved by the Employer. Employees shall advise the Employer of the time and place of the examination when they are made aware of the time and place.

  • TIME OF COMPLETION The Owner shall issue a Notice to Proceed identifying the date for commencement of the Work. The commencement date shall be 10 or more days after the date the notice is issued. The Contractor shall achieve substantial completion of the Work within _____________________ (____) calendar days after the commencement date, as such completion date may be extended by approved Change Orders. The time set forth for completion of the Work is an essential element of the Contract.

  • DAF Specifications Developer shall submit initial specifications for the DAF, including System Protection Facilities, to Connecting Transmission Owner and NYISO at least one hundred eighty (180) Calendar Days prior to the Initial Synchronization Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Initial Synchronization Date. Connecting Transmission Owner and NYISO shall review such specifications to ensure that the DAF are compatible with the technical specifications, operational control, and safety requirements of the Connecting Transmission Owner and NYISO and comment on such specifications within thirty (30) Calendar Days of Developer’s submission. All specifications provided hereunder shall be deemed to be Confidential Information.

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.

  • Equipment Specifications All equipment must meet the contract specifications and all federal and State safety codes and regulations in effect at the date of manufacture. All equipment must be Original Equipment Manufacturer (OEM) equipment unless otherwise stated in the contract. Items Offered as New. All products, materials, supplies, replacement parts, and equipment offered and furnished must be new, of current manufacturer production, and must have been formally announced by the manufacturer as being commercially available, unless otherwise stated in this Contract.