Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.
System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.
Statement of Work The Statement of Work to which Grantee is bound is incorporated into and made a part of this Grant Agreement for all purposes and included as Attachment A.
Innovative Scheduling Schedules which are inconsistent with the Collective Agreement provisions may be developed in order to improve quality of working life, support continuity of resident care, ensure adequate staffing resources, and support cost-efficiency. The parties agree that such innovative schedules may be determined locally by the Home and the Union subject to the following principles: (a) Such schedules shall be established by mutual agreement of the Home and the Union; (b) These schedules may pertain to full-time and/or part-time employees; (c) The introduction of such schedules and trial periods, if any, shall be determined by the local parties. Such schedules may be discontinued by either party with notice as determined through local negotiations; (d) Upon written agreement of the Home and the Union, the parties may agree to amend collective agreement provisions to accommodate any innovative unit schedules; (e) It is understood and agreed that these arrangements are based on individual circumstances and each agreement is made on a without prejudice or precedent basis. (f) It is understood and agreed that these arrangements can be utilized for temporary job postings for seasonal coverage (e.g. weekend workers, etc.).
Maintenance Scheduling The NTO shall schedule maintenance of its facilities designated as NTO Transmission Facilities Under ISO Operational Control and schedule any outages (other than forced transmission outages) of said transmission system facilities in accordance with outage schedules approved by the ISO. The NTO shall comply with maintenance schedules coordinated by the ISO, pursuant to this Agreement, for NTO Transmission Facilities Under ISO Operational Control. The NTO shall be responsible for providing notification of maintenance schedules to the ISO for NTO Transmission Facilities Requiring ISO Notification. The NTO shall provide notification of maintenance schedules to affected Transmission Owners for NTO Transmission Facilities Requiring ISO Notification and Local Area Transmission Facilities pursuant to Section 3.5.3 of the ISO Services Tariff.
System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades. 5.2.1 As described in Section 32.3.5.3 of the SGIP in Attachment Z of the ISO OATT, the responsibility of the Interconnection Customer for the cost of the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement shall be determined in accordance with Attachment S of the ISO OATT, as required by Section 32.3.5.3.2
Service Specification The Parties have agreed upon the scope and specification of the Services provided under this Service Agreement in the Service Specification.
Service Level Agreement 6.1 NCR Voyix will use commercially reasonable efforts to make the Service available to you at or above the Availability Rate set forth at xxxxx://xxx.xxx.xxx/support/aloha-sla. If NCR Voyix does not meet the Availability Rate, you are entitled to request a service-level credit subject to the terms of this Agreement. This credit is calculated as a percentage of the monthly recurring bill (or monthly pro rata share of billing, if billing does not occur monthly) for the Service for the month in which the Availability Rate was not met. The Availability Rate is determined by: (a) dividing the total number of valid outage minutes in a calendar month by the total number of minutes in that month; (b) subtracting that quotient from 1.00; (c) multiplying that difference by 100; and (d) rounding that result to two decimal places in accordance with standard rounding conventions. The number of outage minutes per day for a given service is determined by the lesser of the number of outage minutes. 6.2 Unavailability due to other conditions or caused by factors outside of NCR Voyix’s reasonable control will not be included in the calculation of the Availability Rate. Further, the following are expressly excluded from the calculation of the Availability Rate: (a) service unavailability affecting services or application program interfaces that are not used by you; (b) cases where fail-over to another data center is available but not utilized; (c) transient time-outs, required re-tries, or slower-than-normal response caused by factors outside of NCR Voyix’s reasonable control; (d) Scheduled Downtime, including maintenance and upgrades; (e) force majeure; (f) transmission or communications outages outside the NCR Voyix- controlled environment; (g) store-level down-time caused by factors outside of NCR Voyix’s reasonable control; (h) outages attributable to services, hardware, or software not provided by NCR Voyix, including, but not limited to, issues resulting from inadequate bandwidth or related to third-party software or services; (i) use of the Service in a manner inconsistent with the documentation for the application program interface or the NCR Voyix Product; (j) your Point of Sale (“POS”) failure or the failure to properly maintain the POS environment, including updating the POS firmware or version of the software running on the POS as recommended by either NCR Voyix, a third-party POS reseller or servicer; and (k) issues related to third party domain name system (“DNS”) errors or failures. 6.3 To obtain a service-level credit, you must submit a claim by contacting NCR Voyix through the website at xxxxx://xxx.xxx.xxx/support/aloha-sla Your failure to provide the claim and other information will disqualify you from receiving a credit. NCR Voyix must receive claims within 60 days from the last day of the impacted month. After that date, claims are considered waived and will be refused. You must be in compliance with the Agreement in order to be eligible for a service-level credit. You may not unilaterally offset for any performance or availability issues any amount owed to NCR Voyix. If multiple Services experience an outage in a given month, the total credit for that month will be the highest credit allowed for any single Service which failed; there is no stacking of credits. 6.4 The remedies set forth in the Section are your sole and exclusive remedies for performance or availability issues affecting the Services, including any failure by NCR Voyix to achieve the Availability Rate.
Operation and Maintenance Manuals Receipts for transmittal of Operation and Maintenance Manuals, Brochures and Data to the Design Professional (or Commissioning Agent) as required by Section 6.1.1.5.
Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.