Supplemental Topographical Field Surveying Sample Clauses

Supplemental Topographical Field Surveying. The following items represent the various tasks included in the scope of work regarding the topographical surveying to be performed as a supplement to the existing survey data as provided by the client. The topographical survey shall be limited to field verification of critical control locations such as project termini and Interstate 55. Otherwise, design shall be accomplished using data provided by the CLIENT. The Consultant is not responsible for the accuracy of the data as provided by others”
AutoNDA by SimpleDocs

Related to Supplemental Topographical Field Surveying

  • Topographic Survey 3.1 Notify affected property owners of pending survey.

  • Adverse Weather Shall be only weather that satisfies all of the following conditions: (1) unusually severe precipitation, sleet, snow, hail, or extreme temperature or air conditions in excess of the norm for the location and time of year it occurred based on the closest weather station data averaged over the past five years, (2) that is unanticipated and would cause unsafe work conditions and/or is unsuitable for scheduled work that should not be performed during inclement weather (i.e., exterior finishes), and (3) at the Project.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Geotechnical Investigation Perform in accordance with the City Design Manual and other City requirements as designated in writing by the Director.

  • Geotechnical Engineer « »« » « » « » « » « »

  • Geological and Archeological Specimens If, during the execution of the Work, the Contractor, any Subcontractor, or any servant, employee, or agent of either should uncover any valuable material or materials, such as, but not limited to, treasure trove, geological specimens, archival material, archeological specimens, or ore, the Contractor acknowledges that title to the foregoing is vested in the Owner. The Contractor shall notify the Owner upon the discovery of any of the foregoing, shall take reasonable steps to safeguard it, and seek further instruction from the Design Professional. Any additional cost incurred by the Contractor shall be addressed under the provision for changed conditions. The Contractor agrees that the Geological and Water Resources Division and the Historic Preservation Division of the Georgia Department of Natural Resources may inspect the Work at reasonable times.

  • Background Screening VENDOR shall comply with all requirements of Sections 1012.32 and 1012.465, Florida Statutes, and all of its personnel who (1) are to be permitted access to school grounds when students are present, (2) will have direct contact with students, or (3) have access or control of school funds, will successfully complete the background screening required by the referenced statutes and meet the standards established by the statutes. This background screening will be conducted by SBBC in advance of VENDOR or its personnel providing any services under the conditions described in the previous sentence. VENDOR shall bear the cost of acquiring the background screening required by Section 1012.32, Florida Statutes, and any fee imposed by the Florida Department of Law Enforcement to maintain the fingerprints provided with respect to VENDOR and its personnel. The parties agree that the failure of VENDOR to perform any of the duties described in this section shall constitute a material breach of this Agreement entitling SBBC to terminate immediately with no further responsibilities or duties to perform under this Agreement. VENDOR agrees to indemnify and hold harmless SBBC, its officers and employees from any liability in the form of physical or mental injury, death or property damage resulting from VENDOR’s failure to comply with the requirements of this section or with Sections 1012.32 and 1012.465, Florida Statutes.

  • Geotechnical 19 The A/E as required shall review past pavement, soil 20 and geology investigations, discuss past findings as 21 impacting the subject roadway project, and independently 22 perform design-needed geotechnical services including 23 development and implementation of a field investigation plan 24 involving any field data collection as deemed necessary, 25 development of a laboratory testing program to conduct soils 26 surface and subsurface characterization tests as applicable 1 to the needs of the project, development of seismic analysis 2 and design criteria in accordance with code requirements, 3 development of pavement condition studies to provide 4 recommendations concerning life cycle costs and 5 rehabilitation/reconstruction methods, and recommendations 6 for the design of foundations, embankment and excavation 7 procedures, settlement analysis, lateral, active, and passive 8 earth pressures, de-watering, landslide mapping, slope 9 stabilization, soil corrosion, erosion, sedimentation control 10 and other applicable design criteria as deemed necessary.

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. Forest Service engineering shall be completed according to the schedule in A8. Should Forest Service be unable to perform the designated survey and design by the completion date or other agreed to time, upon written agreement, Purchaser shall assume responsibility for such work. In such event, Contracting Officer shall revise:

  • Cutting, Patching, and Fitting The Contractor shall do all cutting, patching, and fitting of the Work that may be required to make its several parts come together properly and fit.