Supplementary Section Sample Clauses

Supplementary Section. The supplementary section shall include teacher certificates, academic records, pre-employment references, and application forms (copies of the above shall be accepted when legally permissible).
AutoNDA by SimpleDocs

Related to Supplementary Section

  • SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" GLAZING TO STEEL WITH PUTTY 4mm Obscure safety glass: 1 Panes not exceeding 0,1 m2 m2 3 Carried Forward to Summary of Section No. 3 R Section No. 3 SMD1 Bill No. 11 GLAZING BVI CONSULTING ENGINEERS Amount Item No SECTION 3 Quantity Rate Amount BILL NO. 12 PAINTWORK SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" ON FIBRE-CEMENT Prepare and brush to remove all loose contaminations, apply one coat primer and two coats PVA emulsion paint: 1 On fascias and barge boards m2 6 ON WOOD Undercoat and minimum 2 coat gloss enamel: 2 On doors (Internal) m2 3 3 On doors (External) m2 7 ON METAL Undercoat and minimum 2 coat gloss enamel: 4 On door frames m2 1 5 On gates (Measured over the full flat area of both sides) m2 8 6 On gutters and down pipes m 10 Spot prining defects in prime surface with zinc chromate primer and apply one universal undercoat and two coats EPWP, golden brown gloss enamel paint on steel: 7 On windows with burglar bars m2 3 Carried Forward to Summary of Section No. 3 Section No. 3 SMD1 Bill No. 12 PAINTWORK BVI CONSULTING ENGINEERS R SECTION SUMMARY - SMD1 Bill No Page No 1 EARTHWORKS 61 2 CONCRETE,FORMWORK AND REINFORCEMENT 63 3 MASONRY 66 4 WATERPROOFING 67 5 ROOF COVERINGS 69 6 CARPENTRY AND JOINERY 71 7 IRONMONGERY 73 8 METALWORK 74 9 PLASTERING 75 10 PLUMBING AND DRAINAGE 78 11 GLAZING 79 12 PAINTWORK 80 Carried to Final Summary Section No. 3 SMD1 BVI CONSULTING ENGINEERS Amount R Item No SECTION 4 Quantity Rate Amount BILL NO.1 EARTHWORKS (PROVISIONAL) SUPPLEMENTARY PREAMBLES For preambles see "Specifications of materials and methods to be used - PW 371" SITE CLEARANCE 1 Digging up and removing rubbish, debris, vegetation, xxxxxx, shrubs,xxxx and trees not exceeding 200mm girth, etc. m2 73 2 Stripping average 100mm thick layer of top soil and stockpiling on site m2 73 EXCAVATION,FILLING, ETC Excavation in earth not exceeding 2m deep: 3 Trenches m3 18 4 Pit m3 27 5 For aprons thickenning m3 4 Extra over trench and hole excavations in earth for excavation: 6 Soft rock m3 49 7 Hard rock m3 49 Extra over all excavations for carting away: 8 Surplus material from excavations and/or stock piles on site to a dumping site to be alocated by the Contractor m3 35 Carried Forward Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS R Brought Forward R Risk of collapse of excavations: 9 Sides of trench and hole excavation not exceeding 1,5m deep. m2 82 Keeping excavations free of water: 10 Keeping excavations free of water other than subterranean water Item Earth filling obtained from the excavations and/or prescribed stock piles on site compacted to 93% ModAASHTO density: 11 Under floors, steps, pavings, etc. m3 7 12 Backfilling to trenches, holes, etc. m3 9 Compaction of surfaces: 13 Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 25 14 Compaction of ground surface to pits etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 20 15 Compaction of ground surface to aprons etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density m2 44 Prescribed density tests on filling: 16 Modified AASHTO Density tests No 5 SOIL POISONING Carried Forward R Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS Brought Forward R Soil insecticide: 17 Under floors etc including forming and poisoning shallow furrows against foundation walls etc, filling in furrows and ramming. m2 25 18 To bottom of concrate aprons m2 44 19 To bottoms and sides of trenches, etc. m2 69 Carried Forward to Summary of Section No. 4 R Section No. 4 MD3 Bill No. 1 EARTHWORKS BVI CONSULTING ENGINEERS R Amount

  • Supplementary Terms Other Contributions

  • Supplementary Provisions 15.1 This Agreement is executed in two original copies and each Party shall keep one.

  • SUPPLEMENTARY PAYMENTS These Supplementary Payments are subject to the terms of the Principal Coverages and they do not increase the limit of liability stated for the principal coverages except: Claims and Defense Expense Coverage.

  • Supplementary Labour (a) If the Employer wishes to engage supplementary labour to perform work performed by its Employees under this Agreement, the Employer must first consult in good faith with the affected Employees.

  • Pursuant to Section 2.1 of this Agreement, the Seller conveyed to the Trust all of the Seller’s right, title and interest in its rights and benefits, but none of its obligations or burdens, under the Purchase Agreement including the Seller’s rights under the Purchase Agreement and the delivery requirements, representations and warranties and the cure or repurchase obligations of AmeriCredit thereunder. The Seller hereby represents and warrants to the Trust that such assignment is valid, enforceable and effective to permit the Trust to enforce such obligations of AmeriCredit under the Purchase Agreement. Any purchase by AmeriCredit pursuant to the Purchase Agreement shall be deemed a purchase by the Seller pursuant to this Section 3.2 and the definition of Purchased Receivable.

  • Annexes, Appendices and Footnotes The annexes, appendices and footnotes to this Agreement constitute an integral part of this Agreement.

  • Modification to Article V, Section 4 of the DPA Article V, Section 4 of the DPA (Data Breach.) is amended with the following additions: (6) For purposes of defining an unauthorized disclosure or security breach, this definition specifically includes meanings assigned by Texas law, including applicable provisions in the Texas Education Code and Texas Business and Commerce Code.

  • Pursuant to Section 2271 002 of the Texas Government Code, Respondent certifies that either (i) it meets an exemption criteria under Section 2271.002; or (ii) it does not boycott Israel and will not boycott Israel during the term of the contract resulting from this Solicitation. If Respondent refuses to make that certification, Respondent shall state here any facts that make it exempt from the boycott certification: .

  • Effect of Headings and Table of Contents The Article and Section headings herein and the Table of Contents are for convenience only and shall not affect the construction hereof.

Time is Money Join Law Insider Premium to draft better contracts faster.