Surface and Subsurface Water Sample Clauses

Surface and Subsurface Water. 53.3.1 Surface or subsurface water or other fluid shall not be permitted to accumulate in excavations or under or in the structures. Should such conditions develop or be encountered, the water or other fluid shall be controlled and suitably disposed of by means of temporary pumps, piping, drainage lines and ditches, dams or other methods approved by the Owner in writing. The proposed location and coordination of temporary channels and conduits conducting accumulated water from the job site shall be permitted by the proper regulatory agency and submitted to the Owner for its prior written approval. All such Work shall be done at the sole expense of the Contractor.
AutoNDA by SimpleDocs
Surface and Subsurface Water. Surface or subsurface water or other fluid shall not be permitted to accumulate in excavations or under or in any structures on the Project Site. Should such conditions develop or be encountered, the water or other fluid shall be controlled and suitably disposed of by means of temporary pumps, piping, drainage lines and ditches, dams or other methods approved by the County in writing. The proposed location and coordination of any temporary channels and conduits conducting accumulated water from the Project Site shall be permitted by all necessary and appropriate Governmental Authorities. All such work shall be done at the sole expense of Developer.

Related to Surface and Subsurface Water

  • Subsurface Conditions Unless the Contract Documents stipulate specific quantities and units of rock or unsuitable soils, the Contractor shall assume material below the surface of the Earth to be earth and other material that can be removed by power shovel or similar equipment. Should conditions encountered below the surface of the ground be at variance to the number of unit requirements as indicated by drawings or specifications, and absent an agreed-upon unit price established prior to the bid by Addendum, or after contract execution by Change Order, the Contract Sum and/or time shall be adjusted as provided in the Contract Documents for changes in the work.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Geotechnical 19 The A/E as required shall review past pavement, soil 20 and geology investigations, discuss past findings as 21 impacting the subject roadway project, and independently 22 perform design-needed geotechnical services including 23 development and implementation of a field investigation plan 24 involving any field data collection as deemed necessary, 25 development of a laboratory testing program to conduct soils 26 surface and subsurface characterization tests as applicable 1 to the needs of the project, development of seismic analysis 2 and design criteria in accordance with code requirements, 3 development of pavement condition studies to provide 4 recommendations concerning life cycle costs and 5 rehabilitation/reconstruction methods, and recommendations 6 for the design of foundations, embankment and excavation 7 procedures, settlement analysis, lateral, active, and passive 8 earth pressures, de-watering, landslide mapping, slope 9 stabilization, soil corrosion, erosion, sedimentation control 10 and other applicable design criteria as deemed necessary.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

  • Structures Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers; flexible and rigid pavements; navigational aids; buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein. 10-50 SUBGRADE. The soil which forms the pavement foundation.

  • Project Site The “Project Site” is the place where the Work is being carried on.