Surface Finish and Quality Control Sample Clauses

Surface Finish and Quality Control. The surface finish shall conform to requirements of clause 902 of specification for roads and bridges by Ministry of surface Transport (Copy enclosed) Quality control Test and their frequencies shall be as per table below. Xx.Xx. Test Frequency 1 Quality of binder Two samples per lot to be subjected to all or some test as directed by the Engineer.
AutoNDA by SimpleDocs
Surface Finish and Quality Control. The surface finish shall conform to requirements of clause 902 of specifications for Road and bridges by Ministry of Surface Transport (copy enclosed) Quality Control Test and their frequencies shall be as per table below: Xx.Xx Test Frequency 1 Quality of binder Two samples per lot to be subjected to all or some test as directed by the Engineer 3 Flankiness Index and Elongation Index One test per 200 cubic meter of aggregate. 4 Stripping value Initially one set of three representative specimen for each source of supply subsequently when warranted by changes in the quality of aggregate. 7 Temperature of binder at application. At regular close intervals. 8 Rate of spreading for binder One test per 500 square meter of area.

Related to Surface Finish and Quality Control

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Use; Quality Control a. Neither party may alter the other party’s trademarks from the form provided and must comply with removal requests as to specific uses of its trademarks or logos.

  • EMHS Governance, Safety and Quality Requirements 4.1 Participates in the maintenance of a safe work environment.

  • SMHS Governance, Safety and Quality Requirements 4.1 Participates in the maintenance of a safe work environment.

  • NMHS Governance, Safety and Quality Requirements 3.1 Participates in the maintenance of a safe work environment.

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • SHIPPING AND AIR TRANSPORT 1. Profits of an enterprise of a Contracting State from the operation of ships or aircraft in international traffic shall be taxable only in that State.

  • Workmanship and Quality 7.8.1 Employees appropriately qualified will sign all required documentation in accordance with the applicable statutes and regulations.

  • STANDARDS AND QUALITY The Supplier shall at all times during the Contract Period ensure that the Services are delivered in accordance with: the Digital Service Design Manual (and the Supplier shall comply with the processes and procedures set out therein); the Standards; the KPIs; the Methodology; the applicable SOW; and all other applicable provisions of this Contract.

  • Erosion Control Structure Maintenance During the period of this contract, Purchaser shall provide maintenance of soil erosion control structures constructed by Purchaser until they become stabilized, but not for more than 1 year after their construction. Contracting Of- ficer may agree to perform such structure maintenance under B4.218, if requested by Purchaser, subject to agreement on rates. Purchaser shall not be responsible for repair of such structures damaged by other National Forest users whose activities are not a part of Pur- chaser’s Operations.

Time is Money Join Law Insider Premium to draft better contracts faster.