Surface Finishing Sand Sample Clauses

Surface Finishing Sand. Provide sand for abrasive sand finish conforming to the following properties: • Commercial-quality blast sand required. • Have at least 95% passing the No. 8 sieve and at least 95% retained on the No. 20 sieve when tested according to AASHTO T27. • Must be dry at the time of application. • Material components are supplied collectively through the System Provider. Aggregates to be supplied by the System Provider and delivered in packaging to the site clean and dry.
AutoNDA by SimpleDocs

Related to Surface Finishing Sand

  • Finishing Work It has been clearly understood by the Alottee, that the Occupancy Certificate/Completion Certificate, as the case may be, are issued by the concerned authorities, when the entire civil construction work of the apartment is complete and the apartment is in a habitable state, however, to prevent any loss or damage, the internal fittings, furnishings and finishing work is done after obtaining completion certificate/occupancy certificate as the case may be. Further the internal fittings, furnishings and finishing work may also depend upon the choice of the Allottee. Therefore to ensure that there is no loss or damage to the internal fittings, furnishings and finishing work and the same may be carried on as per the choice of the Allottee, internal works such as fitting of switch boards, doors, sanitary fittings, plumber fittings like water taps/showers etc., final colour coat on the internal walls, floor tiles or any other internal work of like nature, shall be completed after obtaining occupancy certificate/completion certificate and before handing over the possession of the apartment to the Allottee.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • FABRICATION Making up data or results and recording or reporting them.

  • FINISHES Buyer(s) understands that the location of telephone, electric, cable TV and other utility outlets, doors, windows, air conditioning components, lighting fixtures, equipment and fixtures are subject to change and Buyer(s) understands that materials such as brick, wood, wood grain, carpeting, paint, cabinets, cultured marble, tile, Formica, granite and the like are subject to shading and gradation and may vary from samples, models or color charts, and from piece to piece, and Contractor shall not be liable for such variations.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Building Safety There shall be a Labor/Management Committee concerning the safety of State Buildings. The Committee shall be made up of one representative from each of the following bargaining units: Representing Labor - Administrative Services; Operations, Maintenance and Support Services; Law Enforcement; Professional and Technical Services; Supervisory Services; Institutional Services; and State Police Unit and an equal number of management representatives selected by the Governor. Committee members may participate in the work of the committee during working hours without loss of pay or benefits.

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

Time is Money Join Law Insider Premium to draft better contracts faster.