Surrounding Use Effects; Surrounding Operations Sample Clauses

Surrounding Use Effects; Surrounding Operations. In taking title to the Unit, the Grantee does so with the express understanding and acknowledgment that the Project and the Unit may be affected by various nuisances and by noise, dust, smoke, soot, odors, mold, or mold spores, the transmission of pollutants, surface water runoff, or other adverse conditions (collectively, the "Surrounding Use Effects") created or exacerbated by or attributable to various factors and to the construction, development, sale, and/or use of the Project and the properties adjacent to or in the vicinity of the Project. The Grantee specifically approves all of the foregoing uses, circumstances and activities (collectively the "Surrounding Operations"). The Grantee hereby understands, acknowledges and agrees, on behalf of the Grantee and those using the Unit or the Project through the Grantee, that the Grantee: (a) will assume and does hereby assume any and all risks and nuisances associated with the Surrounding Operations, including, specifically, the annoyances, inconveniences, impacts on property value, the Surrounding Use Effects and other nuisances created thereby, including property damage and personal injury;
AutoNDA by SimpleDocs

Related to Surrounding Use Effects; Surrounding Operations

  • Geological and Archeological Specimens If, during the execution of the Work, the Contractor, any Subcontractor, or any servant, employee, or agent of either should uncover any valuable material or materials, such as, but not limited to, treasure trove, geological specimens, archival material, archeological specimens, or ore, the Contractor acknowledges that title to the foregoing is vested in the Owner. The Contractor shall notify the Owner upon the discovery of any of the foregoing, shall take reasonable steps to safeguard it, and seek further instruction from the Design Professional. Any additional cost incurred by the Contractor shall be addressed under the provision for changed conditions. The Contractor agrees that the Geological and Water Resources Division and the Historic Preservation Division of the Georgia Department of Natural Resources may inspect the Work at reasonable times.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Geological and archaeological finds It is expressly agreed that mining, geological or archaeological rights do not form part of this Agreement with the Contractor for the Works, and the Contractor hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor hereunder shall be reimbursed by the Authority. It is also agreed that the Authority shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Individual Special Circumstance Arrangements Notwithstanding Article 2.02, the Home and the Union may agree in certain circumstances, to adjust the schedule of an individual full-time employee who normally works seventy five (75) hours bi-weekly, to enable an average bi-weekly work assignment of sixty (60) to seventy five (75) hours.

  • Areas of Cooperation The Parties will cooperate, in particular, in the following areas of common interest:

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Environmental Hazards (a) Except for matters described in Section 18(b), Borrower shall not cause or permit any of the following:

  • Meteorological Data Reporting Requirement (Applicable to wind generation facilities only) The wind generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) • Forced outage data (wind turbine and MW unavailability)

Time is Money Join Law Insider Premium to draft better contracts faster.