Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.
Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.64 – DEBARMENT AND SUSPENSION CERTIFICATION (3/18). Pursuant to 2 CFR 180 and 2 CFR 417, Purchaser shall certify and obtain certifications from its Subcontractors regarding debarment, suspension, ineligibility, and voluntary exclusion, including additional Subcontractors obtained after award of this contract. “Subcontractors” are participants in lower tier covered transactions. Purchaser may rely upon a certification of a prospective Subcontractor that it is not proposed for debarment under 48 CFR 9.4, debarred, suspended, ineligible, or voluntarily excluded from participating in covered transactions or timber sales, unless Purchaser knows that the certification is erroneous. Purchaser shall keep the certifications of its Subcontractors on file until timber sale Termination Date and any extensions thereof, and will provide a copy at the written request of Contracting Officer. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this Subsection. The knowledge and information of Purchaser is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. If Purchaser knowingly enters into a timber sale transaction with a person who is proposed for debarment under 48 CFR 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in covered transactions or timber sales, in addition to other remedies available to the Government, Forest Service may pursue available remedies, including suspension and/or debarment. Contracting Officer shall provide a copy of Forms AD-1047 Certification Regarding Debarment, Suspension and Other Responsibility Matters – Primary Covered Transactions and AD-1048 Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Lower Tier Covered Transactions to the Purchaser. Purchaser shall complete form AD-1047 and provide to the Contracting Officer upon request. Purchaser shall require each subcontractor to complete form AD-1048 and provide to the Contracting Officer upon request.
Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.
Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.
Fencing The SPD shall Fence the demarcated boundary of the Demised Premises at the SPD’s own expense in every respect.
Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)
Fittings 2.2.1 Support structure and attachment fittings for the flap structure 2.2.2 Support structure and attachment fitting for the engine pylons 2.2.3 Support structure and attachment fitting for the main landing gear 2.2.4 Support structure and attachment fitting for the center wing box
Scratches appliance malfunctions and any resultant leak there from; (R) any stain, soiling or damage resulting from everyday use or which has built up over time, e.g. hair, body or suntan oils and/or lotions; (S) signs of soiling include darkened areas where the body comes into contact with the furniture (these darkened areas are signs of soil build-up, which is not covered); (T) general maintenance and overall cleaning of the furniture is the consumer’s responsibility; (U) damage due to harsh or corrosive chemicals; (V) acids, including without limitation, dyes and inks (except ballpoint), plant food and fertilizer and bleach, gum; (W) any non-operating part or decorative parts such as hinges, knobs, handles, or shelves; (X) coverage under another insurance program; (Y) delivery and/or redelivery and/or loss or damage to the Covered Product while in the course of transit; (Z) design deficiency; (AA) fabrics with “X” cleaning codes and non-colorfast fabrics and leathers; (AB) odors; (AC) variation of the color, or graining of wood or wood products, marble or leather; (AD) split leathers used in seat cushions, back cushions or top or inside arm areas; (AE) natural markings on leather, such as, healed scars, insect bites, brand marks or wrinkles, or suede, and leathers with embossed patterns other than those stimulating natural cowhide; (AF) non- bovine leathers, and other buffed leathers; (AG) stains, color loss or damage resulting from cleaning methods or products (detergents, abrasives or other harsh cleaning agents) other than those recommended by the furniture manufacturer; (AH) stone or sand abrasion; (AI) loss or damage resulting from: pre-existing conditions known to You; (AJ) wear related issues, such as but not limited to, fading, wear, seam separation, stress tears, loss of foam resiliency, pilling or fraying of any fabric on all types of furniture; (AK) color loss or cracking and peeling on any leather or vinyl; (AL) splits or bi-cast leather; (AM) furniture that is used for commercial, institutional, outdoor or rental purposes; (AN) Customer’s Own Material furniture; (AO) wicker, rattan, and teakwood furniture; (AP) massage chairs; (AQ) stains or damage to suede, split-grain leather hide or exotic leathers; (AR) manufacturer quality issues such as stress tears, fabric flaws, fading, color loss or change, loss of foam or resiliency, cracking and peeling of leather or vinyl, natural leather markings, and defects in design and workmanship; (AS) Stains or damage that occur during assembly, delivery, installation, before furniture is delivered to your residence, while the furniture is located outside of your residence, while the furniture is in storage or being moved to or from storage or between residences; (AT) Wear & Tear caused by repeated use such as scuffing, soiling, hair/body oil, perspiration, surface abrasions, pilling or fraying of fabric, loose joints; (AU) Stains or damage covered under any manufacturer warranty, recall, homeowner, renter or other insurance policy; (AV) Stains or damage caused by structural problems, appliance malfunctions, Acts of God or natural disasters, theft, vandalism or illegal activity (AW) Stains or damage caused by independent contractors
Towing Contractor shall meet all requirements set forth in Title 46 CFR, Part 15 for Towing Assistance. Unless otherwise specified in the work request, Purchasers require a dead-ship tow plan to be approved by the Coast Guard in accordance with the Puget Sound Harbor Safety Committee for vessels over 50-feet, unless the Coast Guard deems the plan unnecessary. Contractor is responsible to obtain a tow plan and provide Purchaser with an approved copy at least one (1) business day prior to the tow. The plan is located on the Puget Sound Harbor Safety Committee’s website under the Safety Plan link on the left side of the page (xxxx://xxxxx.xxx/about). This site will have the most update version of the plan.
CUTTING AND PATCHING The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.