Systems Startup and Equipment Commissioning. The QESP shall conduct thorough and systematic performance tests of each element and total system of the installed Equipment in accordance with the procedures specified in Schedule T (Systems Start-Up and Commissioning; Operating Parameters of Installed Equipment) prior to delivering to the Department the installation notification indicating that the Equipment is ready for inspection by the Department. Testing shall be designed to determine if the Equipment is functioning in accordance with both its published specifications and the Schedules to this SOW, and to determine if modified building systems, subsystems or components are functioning properly within the new integrated environment. The QESP shall provide sufficient notice to the Department and any third-party technical support entity, as requested by DEEP or the Department, of the scheduled test(s). The Department shall have the right to be present, and to invite any third party to be present, at any or all such tests conducted by QESP and/or manufacturers of the Equipment. The QESP shall correct and/or adjust all deficiencies in systems and Equipment operations that may be observed during system commissioning procedures as specified in Schedule T (Systems Start-Up and Commissioning; Operating Parameters of Installed Equipment). Prior to Department executing the Exhibit A1, Certificate of Acceptance of All Installed Equipment, QESP shall provide Department with documentary evidence that the Equipment installed is the Equipment specified in Schedule R (Equipment to be Installed by QESP).
Appears in 10 contracts
Samples: Energy Savings Performance Contracting Services, Energy Savings Performance Contracting Services, Energy Savings Performance Contracting Services