Telemetered Deseret Area Load. For the purposes of this Agreement only, Telemetered Deseret Area Load shall consist of loads which are outside the electrical boundary formed by the Tie-Line meters of the PACE Balancing Authority Area, but which are effectively transferred into the PACE Balancing Authority Area through a telemetry signal which represents the moment-to-moment load of those transferred Loads. These telemetered loads are comprised of the Bridger Valley Flaming Gorge Transmission System, the Moon Lake load served from Western’s Vernal substation at 69 kV (but metered at 138 kV) and the Deserado coal mine served from the “CA” tap on the Rangely-Xxxxxx 138 kV line in Western’s Balancing Authority Area. These loads are served, in part, from the Deseret Transmission System.
Appears in 2 contracts
Samples: pscdocs.utah.gov, Transmission Service and Operating Agreement
Telemetered Deseret Area Load. For the purposes of this Agreement only, Telemetered Deseret Area Load shall consist of loads which are outside the electrical boundary formed by the Tie-Line meters of the PACE Balancing Authority Area, but which are effectively transferred into the PACE Balancing Authority Area through a telemetry signal which represents the moment-to-to- moment load of those transferred Loads. These telemetered loads are comprised of the Bridger Valley Flaming Gorge Transmission System, the Moon Lake load served from Western’s Vernal substation at 69 kV (but metered at 138 kV) and the Deserado coal mine served from the “CA” tap on the Rangely-Xxxxxx Meeker 138 kV line in Western’s Balancing Authority Area. These loads are served, in part, from the Deseret Transmission System.
Appears in 1 contract
Telemetered Deseret Area Load. For the purposes of this Agreement only, Telemetered Deseret Area Load shall consist of loads which are outside the electrical boundary formed by the Tie-Line meters of the PACE Balancing Authority Area, but which are effectively transferred into the PACE Balancing Authority Area through a telemetry signal which represents the moment-to-to- moment load of those transferred Loads. These telemetered loads are comprised of the Bridger Valley Flaming Gorge Transmission System, the Moon Lake load served from Western’s Vernal substation at 69 kV (but metered at 138 kV) and the Deserado coal mine served from the “CA” tap on the Rangely-Xxxxxx 138 kV line in Western’s Balancing Authority Area. These loads are served, in part, from the Deseret Transmission System.
Appears in 1 contract
Samples: pscdocs.utah.gov