Forecasting Requirements 19.5.1 The Parties shall exchange technical descriptions and forecasts of their Interconnection and traffic requirements in sufficient detail necessary to establish the Interconnections necessary for traffic completion to and from all Customers in their respective designated service areas.
Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.
Design Requirements The DG Facility shall be installed in compliance with Wisconsin Administrative Code Chapter PSC 119.
Abbreviated Documentation Requirements Compile and submit:
Construction Requirements (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required. (b) Electric panel schedules must be brought up to date identifying all new circuits added. (c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate. (d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present. (e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service. (f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times. (g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor: i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid. ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION. iii) The Building Engineer will inspect the construction on a periodic basis as well. (j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.
Contract Changes Changes may not be made in the terms and conditions of this contract without the agreement and written permission of the Director of Residence Life or the Director’s designee.
DISTRIBUTION OF CONTRACTOR PRICE LIST AND CONTRACT APPENDICES Contractor shall provide Authorized Users with electronic copies of the Contract, including price lists and Appendices, upon request. Contract Updates will be handled as provided in Appendix C – Contract Modification Procedures.
Installation requirements We (if we install the System) or our contractor (if we procure a contractor to install the System) must:
Trunking Requirements The Parties will provide designed Interconnection facilities that meet the same technical criteria and service standards, such as probability of blocking in peak hours and transmission standards, in accordance with current industry standards.
INVOICING REQUIREMENTS A. Upon acceptance of work by the Service Coordinator, the Contractor shall submit the invoice (and supporting documents where applicable) to the appropriate County department per the issued Delivery Order within thirty (30) calendar days of the acceptance. At minimum, all invoice shall contain the following information: • Correct Delivery Order number • Description of work performed to include the manufacturer name, original make and model number(s) of parts and equipment installed. • Start and ending date of the work • Location of the work • Total labor categorized per the Bid Response Form and rounded to the nearest (30) minutes • Itemized list of materials used according to the original manufacturer’s part name and part number. ▪ Unit price and quantity shall be provided on the invoice for each part • Applicable sales tax for materials purchased should be listed separately • Markdown/mark-ups for material shall be listed as a line item on the invoice. • Approved shipping charges shall be listed separately • Permit and special equipment rental cost for reimbursement (if applicable) • Invoice total B. Proof of purchase for all reimbursable expense must be submitted with the invoice showing the actual cost for all reimbursable expenses by the County, including but not limited to, parts, shipping, sales tax, permits, specialty equipment rentals, etc. The Contractor shall provide a separate service ticket for each work day as verification of actual labor spent on the project daily. C. The Contractor shall not combine charges for multiple Delivery Orders on the same invoice. Each Delivery Order must be invoiced separately. D. The County will review invoices for the required information. The County will have the authority to reject invoices based on improper invoice format and lack of supporting documents. E. The Contractor shall not invoice the County for any work not accepted by the County. Should the County received such invoices, they will be rejected. F. Unless otherwise authorized by the corresponding department in writing, delivery of invoices and back-up documentation via e-mail and/or fax is not allowed under this contract. All invoices shall be mailed or hand delivered to the appropriate Department as referenced as the “Invoice To:” location and on the Delivery Order. G. The Contractor shall submit monthly statements of unpaid invoices to each department ordering services under this contract. The Contractor shall not combine statements for different Departments utilizing this contract. • Statement date • Invoice numbers • Invoice dates • Invoice total or unpaid balance if different from invoice total • Delivery order number corresponding to each invoice listed • Balance carry forward • Cumulative outstanding balance Statements shall be sent to the corresponding Department’s, fiscal department, and the Contract Administrator by the 15th day of each month for service performed in the prior month and upon request by the County.