Testing of Meter Sample Clauses

Testing of Meter. The licensee shall inspect and check the correctness of the meter within 7 working days of receiving the complaint. 7 days in Urban Areas 7 days in Rural Area
AutoNDA by SimpleDocs
Testing of Meter. 19.4.1 The Distribution Licensee shall be responsible for periodic testing of the meter.
Testing of Meter. 1.1 The contractor shall establish a workshop for repairing and testing of meters and keep adequate stock of spares parts. If, at any time after the installation of the meter, the consumer desires that the meter fixed to his connection should be tested, he shall submit an application in writing to the Contractor and pay the prescribed testing fees in advance and submit the receipt therefore with the application, After testing the meter at the workshop of the Contractor. If it is found to run fast by more than 5 percent, the deposit or testing fees shall be refunded to the Consumer and the water bills shall be revised on the basis of the consumption recorded by the repaired meter with retrospective, effect from the date on which a written complaint was filed by the Consumer in respect of excess water bill or the credit will be recorded in the name of the consumer for adjustment from the next bill. If the meter is found to be fast or slow within five percent, limit, the testing fees shall be forfeited.

Related to Testing of Meter

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

  • TESTING OF THE BCDR PLAN The Service Provider shall test the BCDR Plan on a regular basis (and in any event not less than once in every Contract Year). Subject to paragraph 6.2, the Purchaser may require the Service Provider to conduct additional tests of some or all aspects of the BCDR Plan at any time where the Purchaser considers it necessary, including where there has been any change to the Services or any underlying business processes, or on the occurrence of any event which may increase the likelihood of the need to implement the BCDR Plan. If the Purchaser requires an additional test of the BCDR Plan, it shall give the Service Provider written notice and the Service Provider shall conduct the test in accordance with the Purchaser's requirements and the relevant provisions of the BCDR Plan. The Service Provider's costs of the additional test shall be borne by the Purchaser unless the BCDR Plan fails the additional test in which case the Service Provider's costs of that failed test shall be borne by the Service Provider. The Service Provider shall undertake and manage testing of the BCDR Plan in full consultation with the Purchaser and shall liaise with the Purchaser in respect of the planning, performance, and review, of each test, and shall comply with the reasonable requirements of the Purchaser in this regard. Each test shall be carried out under the supervision of the Purchaser or its nominee. The Service Provider shall ensure that any use by it or any Sub-contractor of “live” data in such testing is first approved with the Purchaser. Copies of live test data used in any such testing shall be (if so required by the Purchaser) destroyed or returned to the Purchaser on completion of the test. The Service Provider shall, within twenty (20) Working Days of the conclusion of each test, provide to the Purchaser a report setting out: the outcome of the test; any failures in the BCDR Plan (including the BCDR Plan's procedures) revealed by the test; and the Service Provider's proposals for remedying any such failures. Following each test, the Service Provider shall take all measures requested by the Purchaser, (including requests for the re-testing of the BCDR Plan) to remedy any failures in the BCDR Plan and such remedial activity and re-testing shall be completed by the Service Provider, at no additional cost to the Purchaser, by the date reasonably required by the Purchaser and set out in such notice. For the avoidance of doubt, the carrying out of a test of the BCDR Plan (including a test of the BCDR Plan’s procedures) shall not relieve the Service Provider of any of its obligations under this Contract. The Service Provider shall also perform a test of the BCDR Plan in the event of any major reconfiguration of the Services or as otherwise reasonably requested by the Purchaser.

  • Heating of Room Throughout the Term the Manager will provide a heating system sufficient to provide a comfortable temperature in the Room and will operate, maintain and repair that heating system. During any period in which the heating system is not functioning to the standards set out above, the Manager will use commercially reasonable efforts, after receiving notice of the deficiency, to have the system repaired and functioning as soon as may be possible in the circumstances. In no event however, is the Manager liable to the Resident for any consequential illness or discomfort and the Manager shall not be deemed to be in default of its obligations under this Agreement, so long as it is using commercially reasonable efforts to have the system repaired.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Office of Inspector General Investigative Findings Expert Review In accordance with Senate Bill 799, Acts 2021, 87th Leg., R.S., if Texas Government Code, Section 531.102(m-1)(2) is applicable to this Contract, Contractor affirms that it possesses the necessary occupational licenses and experience.

  • Posting of Schedules The Employer shall post the weekly work schedule for all employees not later than Monday 6:00 p.m. and twenty-two (22) days in advance. An employee's schedule may be changed without notice in the event of absence of other staff due to sickness or accident or in the event of emergencies. In all other cases, at least twenty-four (24) hours' notice of any change must be given or four (4) additional hours' pay given in lieu of notice. All requests for time off for special personal events to be made to Management for their approval prior to the posting of the schedule, and will be granted wherever possible. It is understood that this clause does not apply to casual employees. There shall be a daily starting time for each employee. Daily hours of work for full time employees shall be consecutive, with the exception of meal periods.

  • Posting of Shift Schedules (a) Shift and standby schedules shall be posted at least four (4) weeks in advance of the schedule to be worked and the schedule shall be for a minimum of two (2) weeks. The Employer shall make every reasonable effort not to change shifts. If the Employer changes the shift schedule within forty-eight (48) hours of the shift, the Employee(s) affected shall be entitled to overtime compensation for that shift. The Employer must inform Employees of the shift changes made to the posted schedules.

  • Access to Network Interface Device (NID 2.4.3.1. Due to the wide variety of NIDs utilized by BellSouth (based on subscriber size and environmental considerations), Mpower may access the on-premises wiring by any of the following means: BellSouth shall allow Mpower to connect its loops directly to BellSouth’s multi-line residential NID enclosures that have additional space and are not used by BellSouth or any other telecommunications carriers to provide service to the premise. Mpower agrees to install compatible protectors and test jacks and to maintain the protection system and equipment and to indemnify BellSouth pursuant to Section 8 of the General Terms and Conditions of this Agreement.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.