Testing Schedule. (See Next Sheet) Testing Schedule - anticipated for the Preliminary Assessment and Schematic Design, Design and Construction phases of the project. Description Approximate Number ASTM D 421, Particle Size Analysis ASTM D 2217 ASTM C 422 ASTM D 698, Moisture-Density Relations of Soil 1 ASTM D 1557 ASTM D 427, Shrinkage Factors of Soil ASTM D 2434, Permeability of Granular Soils AASHTO T 194, Determination of Organic Materials in Soils by Wet Combustion ASTM D 1883, Bearing Ratio of Laboratory Compacted Soil AASHTO T 222, Modulus of Soil Reaction ASTM D 2487, Soil Classification “Unified System” ASTM D 2113, Soil Borings ASTM C 207, Hydrated Lime ASTM C 131, Abrasion ASTM C 88, Soundness ASTM D 946, Penetration ASTM D 3381, Viscosity ASTM D 1559, Xxxxxxxx Method ASTM C 136, Gradation ASTM D 2172, Extraction and Gradation 1 ASTM D 2726, Bulk Specific Gravity 1 ASTM D 2041, Maximum Theoretical Specific Gravity 1 ASTM D 2950, Nuclear Density 1 ASTM C 117 Washed Aggregate Sample 3 ASTM D 4318, Liquid Limit, Plastic Limit, Plasticity Index 1 ASTM C 127, Absorption and Specific Gravity ASTM C 128 ASTM C 566, Moisture Content ASTM C 31, PCC Test Cylinders 48 ASTM C 141, Slump 6 ASTM C 231, Air Content 6 ASTM C 78, Flexural Strength ASTM C 138, Yield, Cement Content ASTM D 412, Rubber in Tension ASTM D 1664, Striping Test The testing form shall be adjusted to the specific project. The consultant shall not assume IDOT will provide any testing and inspections. Payment for these services shall be at the rates established in ATTACHMENT K. - TESTING RATES & COST SUMMARY. ATTACHMENT K TESTING RATES & COST SUMMARY DESCRIPTION OF TEST ESTIMATED COST PER TEST NUMBER REQUIRED TOTAL $ Compaction Testing for Soil & Aggregate HMA Test Strip HMA Inspection & Nuclear Density HMA Core Density $75.00 5 $375.00 Calibrated Nuclear Density Guage Standard xxxxxxx $250.00 1 $250.00 HMA Extraction w/ Washed $420.00 1 $420.00 Gradation & HMA Gyratory Voids Analysis $450.00 1 $450.00 Washed Gradation $160.00 3 $480.00 Cylinder Compressive Strength $27.00 48 $1296.00 Atterberg Limits $160.00 1 $160.00 ATTACHMENT L (Optional) SUMMARY OF PAYROLL BURDEN AND FIXED COSTS % of Direct Productive Payroll Federal Insurance Contributions Act State Unemployment Compensation Federal Unemployment Compensation Workmen's Compensation Insurance Paid Holidays, Vacation, Sick Leave Bonus Pension Group Insurance TOTAL PAYROLL BURDEN & FRINGE COSTS % NOTE: A letter from IDOT with approval or provisional payroll burden / fringe and general / administrative expense rates must be attached (ATTACHMENT S) for verification of rates. ATTACHMENT M (Required) SUMMARY OF OVERHEAD AND INDIRECT COSTS % of Direct ProductivePayroll Taxes except Federal Income 13.92 Business Insurance, except key-man insurance, insurance including accident, liability and valuable papers 17.59 Depreciation and amortization 2.11 Administrative, unassignable staff time, recruiting, training and education, severance, negotiating new business, and office accounting, clerical and secretarial wages and salaries 73.25 Reproduction and printing costs 0.00 Office Supplies 2.82 Computer Costs 3.82 Professional services including specialists, legal, auditing, etc. 5.15 Employees travel expenses not assigned to clients and excluding costs outside Illinois 1.46 Telephone, Telegraph and Postage .73 Recruiting and relocating expense .06 Training and educational non-salary expenses .71 Fees, licenses, dues, publications (technical and professional) 1.02 Utilities and maintenance 5.57 Business space rent 11.52 Rental of Equipment 2.52 Miscellaneous Expense 2.81 TOTAL OVERHEAD 145.06% NOTE: A letter from IDOT with approval or provisional payroll burden / fringe and general / administrative expense rates must be attached (ATTACHMENT S) for verification of rates. ATTACHMENT N PROJECT CERTIFICATION Airport: Letting Date: IL Project No.: Federal Project No.: Contract No: Project Description: Pursuant to Federal Aviation Regulations, Part 152, as amended, and as a condition to receiving any Federal and/or State financial assistance through a Grant Offer from the FAA and/or the State of Illinois - Department of Transportation for the proposed airport development project, it is hereby represented, to the best of our knowledge, information, and belief that:
Appears in 1 contract
Testing Schedule. (See Next Sheet) Testing Schedule - anticipated for the Preliminary Assessment and Schematic Design, Design and Construction phases of the project. Description Approximate Number ASTM D 421, Particle Size Analysis ASTM D 2217 ASTM C 422 ASTM D 698, Moisture-Density Relations of Soil 1 ASTM D 1557 ASTM D 427, Shrinkage Factors of Soil ASTM D 2434, Permeability of Granular Soils AASHTO T 194, Determination of Organic Materials in Soils by Wet Combustion ASTM D 1883, Bearing Ratio of Laboratory Compacted Soil AASHTO T 222, Modulus of Soil Reaction ASTM D 2487, Soil Classification “Unified System” ASTM D 2113, Soil Borings ASTM C 207, Hydrated Lime ASTM C 131, Abrasion ASTM C 88, Soundness ASTM D 946, Penetration ASTM D 3381, Viscosity ASTM D 1559, Xxxxxxxx Method ASTM C 136, Gradation ASTM D 2172, Extraction and Gradation 1 ASTM D 2726, Bulk Specific Gravity 1 ASTM D 2041, Maximum Theoretical Specific Gravity 1 ASTM D 2950, Nuclear Density 1 ASTM C 117 Washed Aggregate Sample 3 ASTM D 4318, Liquid Limit, Plastic Limit, Plasticity Index 1 ASTM C 127, Absorption and Specific Gravity ASTM C 128 ASTM C 566, Moisture Content ASTM C 31, PCC Test Cylinders 48 ASTM C 141, Slump 6 ASTM C 231, Air Content 6 ASTM C 78, Flexural Strength ASTM C 138, Yield, Cement Content ASTM D 412, Rubber in Tension ASTM D 1664, Striping Test The testing form shall be adjusted to the specific project. The consultant shall not assume IDOT will provide any testing and inspections. Payment for these services shall be at the rates established in ATTACHMENT K. - TESTING RATES & COST SUMMARY. ATTACHMENT K TESTING RATES & COST SUMMARY DESCRIPTION OF TEST ESTIMATED COST PER TEST NUMBER REQUIRED TOTAL $ Compaction Testing for Soil & Aggregate HMA Test Strip HMA Inspection & Nuclear Density HMA Core Density $75.00 5 $375.00 Calibrated Nuclear Density Guage Standard xxxxxxx $250.00 1 $250.00 HMA Extraction w/ Washed $420.00 1 $420.00 Gradation & HMA Gyratory Voids Analysis $450.00 1 $450.00 Washed Gradation $160.00 3 $480.00 Cylinder Compressive Strength $27.00 48 $1296.00 Atterberg Limits $160.00 1 $160.00 ATTACHMENT L (Optional) SUMMARY OF PAYROLL BURDEN AND FIXED COSTS % of Direct Productive Payroll Federal Insurance Contributions Act State Unemployment Compensation Federal Unemployment Compensation Workmen's Compensation Insurance Paid Holidays, Vacation, Sick Leave Bonus Pension Group Insurance TOTAL PAYROLL BURDEN & FRINGE COSTS % NOTEGEOTECHNICAL SERVICES UNIT PRICES 2020 Name: A letter from IDOT with approval or provisional payroll burden / fringe and general / administrative expense rates must be attached (ATTACHMENT S) for verification of rates. ATTACHMENT M (Required) SUMMARY OF OVERHEAD AND INDIRECT COSTS % of Direct ProductivePayroll Taxes except Federal Income 13.92 Business Insurance, except key-man insurance, insurance including accident, liability and valuable papers 17.59 Depreciation and amortization 2.11 Administrative, unassignable staff time, recruiting, training and education, severance, negotiating new business, and office accounting, clerical and secretarial wages and salaries 73.25 Reproduction and printing costs 0.00 Office Supplies 2.82 Computer Costs 3.82 Professional services including specialists, legal, auditing, etc. 5.15 Employees travel expenses not assigned to clients and excluding costs outside Illinois 1.46 Telephone, Telegraph and Postage .73 Recruiting and relocating expense .06 Training and educational non-salary expenses .71 Fees, licenses, dues, publications (technical and professional) 1.02 Utilities and maintenance 5.57 Business space rent 11.52 Rental of Equipment 2.52 Miscellaneous Expense 2.81 TOTAL OVERHEAD 145.06% NOTE: A letter from IDOT with approval or provisional payroll burden / fringe and general / administrative expense rates must be attached (ATTACHMENT S) for verification of rates. ATTACHMENT N PROJECT CERTIFICATION Airport: Letting Xxxxxxxx Airport Apron Borings Date: IL Project 09/17/2020 Client: Xxxxx Engineering, Inc. Xxxx No.: Federal Project No.P200919 Scope: Contract No: Project Description: Pursuant 6 Borings to Federal Aviation Regulations10 feet bgs Task Description Units Unit Price Extended Cost DRILLING, Part 152SAMPLING & INSITU TE STING Drilling Coordination, as amendedUtilities Clearance, and as a condition to receiving any Federal and/or State financial assistance through a Grant Offer from the FAA and/or the State of Illinois - Department of Transportation for the proposed airport development projectSite Access, it is hereby represented, to the best of our knowledge, information, and belief that:Permitting 2.0 Hours $112.00 /Hour $224.00 Mobilization (ATV mounted) 0 $1,440.00 /Each $0.00
Appears in 1 contract
Testing Schedule. (See Next Sheet) Testing Schedule - anticipated for the Preliminary Assessment and Schematic Design, Design and Construction phases of the project. Description Approximate Number ASTM D 421, Particle Size Analysis ASTM D 2217 ASTM C 422 ASTM D 698, Moisture-Density Relations of Soil 1 ASTM D 1557 ASTM D 427, Shrinkage Factors of Soil ASTM D 2434, Permeability of Granular Soils AASHTO T 194, Determination of Organic Materials in Soils by Wet Combustion ASTM D 1883, Bearing Ratio of Laboratory Compacted Soil AASHTO T 222, Modulus of Soil Reaction ASTM D 2487, Soil Classification “Unified System” ASTM D 2113, Soil Borings ASTM C 207, Hydrated Lime ASTM C 131, Abrasion ASTM C 88, Soundness ASTM D 946, Penetration ASTM D 3381, Viscosity ASTM D 1559, Xxxxxxxx Method ASTM C 136, Gradation ASTM D 2172, Extraction and Gradation 1 ASTM D 2726, Bulk Specific Gravity 1 2 ASTM D 2041, Maximum Theoretical Specific Gravity 1 ASTM D 2950, Nuclear Density 1 ASTM C 117 Washed Aggregate Sample 3 ASTM D 4318, Liquid Limit, Plastic Limit, Plasticity Index 1 ASTM C 127, Absorption and Specific Gravity ASTM C 128 ASTM C 566, Moisture Content ASTM C 31, PCC Test Cylinders 48 4 ASTM C 141, Slump 6 ASTM C 231, Air Content 6 ASTM C 78, Flexural Strength ASTM C 138, Yield, Cement Content ASTM D 412, Rubber in Tension ASTM D 1664, Striping Test The testing form shall be adjusted to the specific project. The consultant shall not assume IDOT will provide any testing and inspections. Payment for these services shall be at the rates established in ATTACHMENT K. - TESTING RATES & COST SUMMARY. ATTACHMENT K TESTING RATES & COST SUMMARY DESCRIPTION OF TEST ESTIMATED COST PER TEST NUMBER REQUIRED TOTAL $ Compaction Testing for Soil & Aggregate HMA Test Strip HMA Inspection & Nuclear Density HMA Core Density PCC test cylinders $75.00 5 20.00 4 $375.00 Calibrated Nuclear Density Guage Standard xxxxxxx 80.00 Bit. Spilt Samples $250.00 1 600.00 2 $250.00 HMA Extraction w/ Washed $420.00 1 $420.00 Gradation & HMA Gyratory Voids Analysis $450.00 1 $450.00 Washed Gradation $160.00 3 $480.00 Cylinder Compressive Strength $27.00 48 $1296.00 Atterberg Limits $160.00 1 $160.00 1,200.00 ATTACHMENT L (Optional) SUMMARY OF PAYROLL BURDEN AND FIXED COSTS % of Direct Productive Payroll Federal Insurance Contributions Act (FICA) 12.91 State Unemployment Compensation and Federal Unemployment Compensation Workmen1.47 Worker's Compensation Insurance 0.68 Paid Holidays, Vacation, Sick Leave Bonus Leave, and Jury Duty 20.80 Severance Pay 0.58 Incentive Compensation 7.80 Stock Purchase Discount 0.46 Pension and Retirement Benefits 11.65 Employee Group Insurance TOTAL PAYROLL BURDEN & FRINGE COSTS % NOTE: A letter from IDOT with approval or provisional payroll burden / fringe 18.74 Total Payroll Burden and general / administrative expense rates must be attached (ATTACHMENT S) for verification of rates. ATTACHMENT M (Required) SUMMARY OF OVERHEAD AND INDIRECT COSTS % of Direct ProductivePayroll Taxes except Federal Income 13.92 Business Insurance, except key-man insurance, insurance including accident, liability and valuable papers 17.59 Depreciation and amortization 2.11 Administrative, unassignable staff time, recruiting, training and education, severance, negotiating new business, and office accounting, clerical and secretarial wages and salaries 73.25 Reproduction and printing costs 0.00 Office Supplies 2.82 Computer Fringe Benefit Costs 3.82 Professional services including specialists, legal, auditing, etc. 5.15 Employees travel expenses not assigned to clients and excluding costs outside Illinois 1.46 Telephone, Telegraph and Postage .73 Recruiting and relocating expense .06 Training and educational non-salary expenses .71 Fees, licenses, dues, publications (technical and professional) 1.02 Utilities and maintenance 5.57 Business space rent 11.52 Rental of Equipment 2.52 Miscellaneous Expense 2.81 TOTAL OVERHEAD 145.06% NOTE: A letter from IDOT with approval or provisional payroll burden / fringe and general / administrative expense rates must be attached (ATTACHMENT S) for verification of rates. ATTACHMENT N PROJECT CERTIFICATION Airport: Letting Date: IL Project No.: Federal Project No.: Contract No: Project Description: Pursuant to Federal Aviation Regulations, Part 152, as amended, and as a condition to receiving any Federal and/or State financial assistance through a Grant Offer from the FAA and/or the State of Illinois - Department of Transportation for the proposed airport development project, it is hereby represented, to the best of our knowledge, information, and belief that:75.09
Appears in 1 contract
Testing Schedule. (See Next Sheet) Testing Schedule - anticipated for the Preliminary Assessment and Schematic Design, Design and Construction phases of the project. Description Approximate Number ASTM D 421, Particle Size Analysis ASTM D 2217 ASTM C 422 ASTM D 698, Moisture-Density Relations of Soil 1 ASTM D 1557 ASTM D 427, Shrinkage Factors of Soil ASTM D 2434, Permeability of Granular Soils AASHTO T 194, Determination of Organic Materials in Soils by Wet Combustion ASTM D 1883, Bearing Ratio of Laboratory Compacted Soil AASHTO T 222, Modulus of Soil Reaction ASTM D 2487, Soil Classification “Unified System” ASTM D 2113, Soil Borings ASTM C 207, Hydrated Lime ASTM C 131, Abrasion ASTM C 88, Soundness ASTM D 946, Penetration ASTM D 3381, Viscosity ASTM D 1559, Xxxxxxxx Method ASTM C 136, Gradation ASTM D 2172, Extraction and Gradation 1 ASTM D 2726, Bulk Specific Gravity 1 ASTM D 2041, Maximum Theoretical Specific Gravity 1 ASTM D 2950, Nuclear Density 1 ASTM C 117 Washed Aggregate Sample 3 ASTM D 4318, Liquid Limit, Plastic Limit, Plasticity Index 1 ASTM C 127, Absorption and Specific Gravity ASTM C 128 ASTM C 566, Moisture Content ASTM C 31, PCC Test Cylinders 48 ASTM C 141, Slump 6 ASTM C 231, Air Content 6 ASTM C 78, Flexural Strength ASTM C 138, Yield, Cement Content ASTM D 412, Rubber in Tension ASTM D 1664, Striping Test The testing form shall be adjusted to the specific project. The consultant shall not assume IDOT will provide any testing and inspections. Payment for these services shall be at the rates established in ATTACHMENT K. - TESTING RATES & COST SUMMARY. ATTACHMENT K TESTING RATES & COST SUMMARY DESCRIPTION OF TEST ESTIMATED COST PER TEST NUMBER REQUIRED TOTAL $ Compaction Testing for Soil & Aggregate HMA Test Strip HMA Inspection & Nuclear Density HMA Core Density $75.00 5 $375.00 Calibrated Nuclear Density Guage Standard xxxxxxx $250.00 1 $250.00 HMA Extraction w/ Washed $420.00 1 $420.00 Gradation & HMA Gyratory Voids Analysis $450.00 1 $450.00 Washed Gradation $160.00 3 $480.00 Cylinder Compressive Strength $27.00 48 $1296.00 Atterberg Limits $160.00 1 $160.00 ATTACHMENT L (Optional) SUMMARY OF PAYROLL BURDEN AND FIXED COSTS % of Direct Productive Payroll Federal Insurance Contributions Act State Unemployment Compensation Federal Unemployment Compensation Workmen's Compensation Insurance Paid Holidays, Vacation, Sick Leave Bonus Pension Group Insurance TOTAL PAYROLL BURDEN & FRINGE COSTS % NOTE: A letter from IDOT with approval or provisional payroll burden / fringe and general / administrative expense rates must be attached (ATTACHMENT S) for verification of rates. ATTACHMENT M (Required) SUMMARY OF OVERHEAD AND INDIRECT COSTS % of Direct ProductivePayroll Taxes except Federal Income 13.92 Business Insurance, except key-man insurance, insurance including accident, liability and valuable papers 17.59 Depreciation and amortization 2.11 Administrative, unassignable staff time, recruiting, training and education, severance, negotiating new business, and office accounting, clerical and secretarial wages and salaries 73.25 Reproduction and printing costs 0.00 Office Supplies 2.82 Computer Costs 3.82 Professional services including specialists, legal, auditing, etc. 5.15 Employees travel expenses not assigned to clients and excluding costs outside Illinois 1.46 Telephone, Telegraph and Postage .73 Recruiting and relocating expense .06 Training and educational non-salary expenses .71 Fees, licenses, dues, publications (technical and professional) 1.02 Utilities and maintenance 5.57 Business space rent 11.52 Rental of Equipment 2.52 Miscellaneous Expense 2.81 TOTAL OVERHEAD 145.06% NOTE: A letter from IDOT with approval or provisional payroll burden / fringe and general / administrative expense rates must be attached (ATTACHMENT S) for verification of rates. ATTACHMENT N PROJECT CERTIFICATION Airport: Letting Date: IL Project No.: Federal Project No.: Contract No: Project Description: Pursuant to Federal Aviation Regulations, Part 152, as amended, and as a condition to receiving any Federal and/or State financial assistance through a Grant Offer from the FAA and/or the State of Illinois - Department of Transportation for the proposed airport development project, it is hereby represented, to the best of our knowledge, information, and belief that:)
Appears in 1 contract