The 157 Acre Site Sample Clauses

The 157 Acre Site. The Authority acquired, and currently owns, approximately 157 gross acres of real property in the City of Xxxxxx, as shown on the Site Map attached hereto as Exhibit A (the “157 Acre Site” or “Site”), known as the former Cal-Compact Landfill. The 157 Acre Site is divided into five Cells (as defined below) as shown on Exhibit A. The portion of the 157 Acre Site which is the subject of this Agreement is identified as Planning Area 3 or PA 3 in the Specific Plan (as defined below) and comprises Cells 3, 4, and 5. The 157 Acre Site has also been vertically subdivided into a surface lot (the “Surface Lot”) and a subsurface lot (the “Subsurface Lot”), which lots are referenced as Parcel 1 (Subsurface Lot) and Parcel 2 (Surface Lot) of Parcel Map No. 70372 (per map filed in Book 377 Pages 76-89, inclusive, of maps in the Office of the County Recorder for Los Angeles County (the “Official Records”)), as shown on Exhibit B, attached hereto.
AutoNDA by SimpleDocs

Related to The 157 Acre Site

  • Porcupine Site Highway 11

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for:

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Site Lands or areas indicated in the Contract Documents as being furnished by the Owner upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by the Owner that are designated for the use of the Contractor. Also referred to as Project Site, Job Site and Premises.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Travelling, Transport and Fares (a) An employee required and authorised to use their own motor vehicle in the course of their duties will be paid not less than the allowance set out in item 21 in Table 2.

  • Dark Fiber Transport Dark Fiber Transport is defined as Dedicated Transport that consists of unactivated optical interoffice transmission facilities without attached signal regeneration, multiplexing, aggregation or other electronics. Except as set forth in Section 6.9.1 below, BellSouth shall not be required to provide access to Dark Fiber Transport Entrance Facilities pursuant to this Agreement.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Living Plants The Project Area may have living plants; however, there is no lawn grass in the Project Area.

Time is Money Join Law Insider Premium to draft better contracts faster.