The stack core Sample Clauses

The stack core. The components of the IRATI prototype located in kernel space are divided into two main categories: the core and the IPC processes. The core is the set of components that provide the fundamental functionalities to the system, as well as the ‘glue’ that holds together the different instances of IPC Processes. The components in the core orchestrate the interactions with user-space components, the life-cycle of the IPC processes and the data transfer operations (in which the IPC processes are involved). The core components have been updated since D2.1 [3] resulting in a final composition for the first prototype currently shaped by the KIPCM, the KFA, the RNL and the IPC process factories as depicted in Figure 2. With respect to [3], two main problems were addressed and solved, in addition to minor improvements: Concurrency and memory allocation problems. IPC process abstraction independent from its type (i.e. normal or shim). During the testing and integration activities, a few concurrency (i.e. bad locking semantics) and memory (leaks and corruptions) related problems have been detected. Although most of the problems were due to bugs, the coupling between the KIPCM and the IPC Processes has been found too tight. This coupling and the concurrency constraints imposed by the kernel environment - such as the absence of recursive locking semantics - caused dead-locks under particular read/write conditions. In order to properly solve them, some of the KIPCM functionalities have been moved into a new software component: the Kernel Flow Allocation Manager (KFA).
AutoNDA by SimpleDocs

Related to The stack core

  • The Supplier must a. keep and maintain Records in accordance with prudent business practice and all applicable laws

  • SS7 Network Interconnection 9.7.1 SS7 Network Interconnection is the interconnection of Global Connection local signaling transfer point switches or Global Connection local or tandem switching systems with BellSouth signaling transfer point switches. This interconnection provides connectivity that enables the exchange of SS7 messages among BellSouth switching systems and databases, Global Connection local or tandem switching systems, and other third-party switching systems directly connected to the XxxxXxxxx XX0 network.

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Originating Goods Except as otherwise provided in this Chapter, each Party shall provide that a good is originating if it is:

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Local Control Center, Metering and Telemetry The NTO shall operate, pursuant to ISO Tariffs, ISO Procedures, Reliability Rules and all other applicable reliability rules, standards and criteria on a twenty-four (24) hour basis, a suitable local control center(s) with all equipment and facilities reasonably required for the ISO to exercise ISO Operational Control over NTO Transmission Facilities Under ISO Operational Control, and for the NTO to fulfill its responsibilities under this Agreement. Operation of the NYS Power System is a cooperative effort coordinated by the ISO control center in conjunction with local control centers and will require the exchange of all reasonably necessary information. The NTO shall provide the ISO with Supervisory Control and Data Acquisition (“SCADA”) information on facilities listed in Appendices A-1 and A-2 herein as well as on generation and merchant transmission resources interconnected to the NTO’s transmission facilities pursuant to the ISO OATT. The NTO shall provide metering data for its transmission facilities to the ISO, unless other parties are authorized by the appropriate regulatory authority to provide metering data. The NTO shall collect and submit to the ISO billing quality metering data and any other information for its transmission facilities required by the ISO for billing purposes. The NTO shall provide to the ISO the telemetry and other operating data from generation and merchant transmission resources interconnected to its transmission facilities that the ISO requires for the operation of the NYS Power System. The NTO will establish and maintain a strict code of conduct to prevent such information from reaching any unauthorized person or entity.

  • Industry Troubleshooter Where a difference arises between the parties relating to the dismissal, discipline, or suspension of an employee, or to the interpretation, application, operation, or alleged violation of this Agreement, including any question as to whether a matter is arbitrable, during the term of the Collective Agreement, Xxxxx XxXxxxxxxx, Xxxx Xxxxxx, Xxxxx Xxxxxxxx, or a substitute agreed to by the parties, shall at the request of either party:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!