Topographic Survey and Asbuilt Sample Clauses

Topographic Survey and Asbuilt. Supplemental design survey within the Project limits as necessary including the following: 1.5.2.1. Within the apparent existing ROW lines of SH130 from approximately 2,400’ south of Blue Bluff Road to 2,800’ north of FM734 with the following cross flights centered on SH130: 1.5.2.2. Airborne LiDAR of the roadway and out to the project boundaries is to be collected in the limits described in section 1.5. 2.1. Calibrate and merge airborne LiDAR data with field survey data into one point cloud for mapping and extraction purposes. Imagery will be collected during the airborne LiDAR acquisition as well so orthophotos can be made for the entire project area. 1.5.2.3. In support of the LiDAR operations, the Engineer will utilize conventional or GPS survey methods to collect supplemental design survey data within the above described design survey limits that may be obscured to LiDAR data collection. The estimated length of this supplemental survey along the longitudinal edge of pavement is 16,000 linear feet. In such areas, conventional survey methods will be utilized to collect cross-sections and break lines at approximate 50-foot intervals within the above described project limits. Major grade-break lines necessary to produce a one-foot interval contour DTM will be collected, as well as any visible improvements including driveways (with type noted), driveway pipes, drop inlets and drainage structures (noting size, material and flowline elevation), edge of pavement, edge (shoulder) line, crown (physical centerline), guardrail, fences, signs (with text) and mailboxes, visible utilities and visible evidence of underground utilities. Collect 1”=50’ planimetric features of the entire project area to TxDOT specifications. 1.5.2.4. Collect design survey data and cross sections for four (4) cross-culverts. Six
AutoNDA by SimpleDocs

Related to Topographic Survey and Asbuilt

  • Topographic Survey The Professional shall obtain a topographic and utility survey as described below. 4.1.1. The Professional shall tie in all existing surface topographic features and structures within the survey limits shown in Figure 1. This survey shall include: tops of curbs, edges of pavement, pavement materials, driveways, sidewalks, retaining walls, drainage structures (top, edges and flow line), channels and drainage ways (tops, toes and flow line), manholes (rim, flow lines and diameters of pipes, type of material and photographs of the inside of manholes and drainage structures), including the same survey data for upstream and downstream manholes and structures that are outside of the survey limits for all gravity wastewater and drainage lines within the survey limits. Visible valves, meters, clean-outs, slabs, utility signs, utility poles and structures, fences, landscaping features, shrubbery, trees (including the approximate drip-line), tree canopies, buildings (edges within the survey limits) mailboxes, etc. Trees shall be tagged and tabulated by size and species specific in compliance with the City of New Braunfels Tree Preservation ordinance as defined in the City of New Braunfels Zoning Ordinance Chapter 5.3- 5i. The survey limits shall extend approximately 100 feet on intersecting streets. The Professional shall provide sufficient ground shots to create one (1) foot contours for the Project. 4.1.2. The Professional shall conduct a utility survey and locate existing utilities within the Project boundary in Figure 1. The Professional shall contact all utility service providers by calling Texas 811 and the NBU Project Manager to coordinate flagging of existing franchise utilities. The Professional shall request drawings of existing agency and municipal owned utilities and shall include locations of these utilities in the survey. The Professional shall tie in the locations of the discovered utilities on the survey. The Professional shall bear all costs for the Services associated with utility locates. 4.1.3. The Professional shall locate up to ten (10) geotechnical borings and tie them in to the Project survey. 4.1.4. The Professional shall set and install control points and/or benchmarks as required for the survey work (minimum 1-foot intervals). The Professional shall provide horizontal and vertical coordinates of the benchmarks in the required coordinate system and datum and show the benchmarks on the survey drawing. 4.1.5. The Professional shall research and review adjoining plats and deeds along the survey corridor. The Professional shall locate property corners and identify existing right of way (“ROW”), along the survey corridor, based on found monuments and record documents.

  • Surveys Each Borrower shall submit the Ship owned by it regularly to all periodical or other surveys which may be required for classification purposes and, if so required by the Security Trustee provide the Security Trustee, with copies of all survey reports.

  • Survey Buyer may obtain a survey of the Property before the Closing to assure that there are no defects, encroachments, overlaps, boundary line or acreage disputes, or other such matters, that would be disclosed by a survey ("Survey Problems"). The cost of the survey shall be paid by the Buyer. Not later than business days prior to the Closing, Buyer shall notify Seller of any Survey Problems which shall be deemed to be a defect in the title to the Property. Seller shall be required to remedy such defects within If Seller does not or cannot remedy any such defect(s), Buyer shall have the option of canceling this Agreement, in which case the Xxxxxxx Money shall be returned to Buyer.

  • Title Reports With respect to each Closing Date Mortgaged Property listed in Part B of Schedule 4.1N annexed hereto, a title report issued by the Title Company with respect thereto, dated not more than 30 days prior to the Closing Date and satisfactory in form and substance to Administrative Agent;

  • Title Report If no Additional Mortgage Policy is required with respect to such Additional Mortgaged Property, a title report issued by the Title Company with respect thereto, dated not more than 30 days prior to the date such Additional Mortgage is to be recorded and satisfactory in form and substance to Administrative Agent;

  • Preliminary Title Report (a) Not later than four (4) business days after the date of this Agreement, Seller, with Buyer's assistance and cooperation as necessary, shall arrange for the Title Company to prepare and deliver to Buyer a preliminary title report (the "Title Report") covering the Real Property dated not earlier than the date of this Agreement, such report showing all matters of record and all items which would be shown as exceptions on a ALTA owner's policy of title insurance, together with a recent ALTA survey of the Real Property certified by a licensed land surveyor and a legible copy of each recorded document underlying any exceptions shown in the Title Report. Subject only to the following permitted exceptions (the "Permitted Exceptions"), Seller shall cause all exceptions to title to the Real Property set forth in such Title Report to be removed prior to the Closing: (1) the standard printed exceptions contained in the Title Company's form of Owner's Policy; (2) building restrictions and zoning regulations heretofore or hereafter adopted by any municipal or other public authority relating to the Property; (3) current property taxes not yet delinquent; (4) the exceptions approved by Buyer in accordance with Section 5.13(b); and (5) any exception to which Buyer, in Buyer's sole discretion, specifically and expressly consents in writing prior to the Closing. Buyer shall pay all fees and costs associated with obtaining the Title Report. (b) Buyer shall have until 5:00 p.m. (Los Angeles time) on the fifth (5th) calendar day following Buyer's receipt of the Title Report to disapprove, in Buyer's sole discretion, any matters set forth in the Title Report; provided, however, that Buyer may not disapprove of the exceptions described in items (1), (2) and (3) of Section 5.13(a). If Buyer timely disapproves of any matters set forth in the Title Report, other than with respect to the exceptions described in items (1), (2) and (3) of Section 5.13(a), Seller shall have three (3) business days to indicate in writing whether Seller will cause such disapproved matters to be removed as exceptions to title prior to or concurrently with the Closing. Seller's failure to timely respond shall be deemed to constitute Seller's irrevocable agreement to remove all such disapproved matters as exceptions to title. If Seller timely indicates that it is unwilling to remove any such disapproved matters as exceptions to title, Buyer may elect to (i) proceed with the transaction contemplated hereby and take title subject to such disapproved matters, or (ii) terminate this Agreement. Buyer's failure to make such election within three (3) business days after being informed of Seller's decision shall be deemed an election of option (i). If Buyer terminates this Agreement pursuant to this Section 5.13(b), the Deposit (and all interest accrued thereon) shall be returned to Buyer, and the parties shall have no further obligations to one another except for any obligations that, by their terms, survive the termination of this Agreement.

  • Adverse Weather Shall be only weather that satisfies all of the following conditions: (1) unusually severe precipitation, sleet, snow, hail, or extreme temperature or air conditions in excess of the norm for the location and time of year it occurred based on the closest weather station data averaged over the past five years, (2) that is unanticipated and would cause unsafe work conditions and/or is unsuitable for scheduled work that should not be performed during inclement weather (i.e., exterior finishes), and (3) at the Project.

  • Title Information (a) On or before the delivery to the Administrative Agent and the Lenders of each Reserve Report required by Section 8.12, the Borrower will deliver title information in form and substance acceptable to the Administrative Agent covering enough of the Oil and Gas Properties evaluated by such Reserve Report that were not included in the immediately preceding Reserve Report, so that the Administrative Agent shall have received together with title information previously delivered to the Administrative Agent, satisfactory title information on at least 80% of the total value of the Oil and Gas Properties evaluated by such Reserve Report. (b) If the Borrower has provided title information for additional Properties under Section 8.13(a), the Borrower shall, within 60 days of notice from the Administrative Agent that title defects or exceptions exist with respect to such additional Properties, either (i) cure any such title defects or exceptions (including defects or exceptions as to priority) which are not permitted by Section 9.03 raised by such information, (ii) substitute acceptable Mortgaged Properties with no title defects or exceptions except for Excepted Liens (other than Excepted Liens described in clauses (e), (g) and (h) of such definition) having an equivalent value or (iii) deliver title information in form and substance acceptable to the Administrative Agent so that the Administrative Agent shall have received, together with title information previously delivered to the Administrative Agent, satisfactory title information on at least 80% of the value of the Oil and Gas Properties evaluated by such Reserve Report. (c) If the Borrower is unable to cure any title defect requested by the Administrative Agent or the Lenders to be cured within the 60-day period or the Borrower does not comply with the requirements to provide acceptable title information covering 80% of the value of the Oil and Gas Properties evaluated in the most recent Reserve Report, such default shall not be a Default, but instead the Administrative Agent and/or the Majority Lenders shall have the right to exercise the following remedy in their sole discretion from time to time, and any failure to so exercise this remedy at any time shall not be a waiver as to future exercise of the remedy by the Administrative Agent or the Lenders. To the extent that the Administrative Agent or the Majority Lenders are not satisfied with title to any Mortgaged Property after the 60-day period has elapsed, such unacceptable Mortgaged Property shall not count towards the 80% requirement, and the Administrative Agent may send a notice to the Borrower and the Lenders that the then outstanding Borrowing Base shall be reduced by an amount as determined by the Majority Lenders to cause the Borrower to be in compliance with the requirement to provide acceptable title information on 80% of the value of the Oil and Gas Properties. This new Borrowing Base shall become effective immediately after receipt of such notice.

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. (a) A7 to show Purchaser’s performance responsibility. (b) The Schedule of Items to include costs of survey and design, as provided under B5.24, and adjust Timber Sale Account, as provided in B5.

  • Firmware 7.1 The Supplier must deliver the equipment, Goods or hardware equipped with all the firmware required to use all the Goods or hardware’s functions. Any software embedded in the equipment, Goods or hardware, including the firmware, is provided to the Local Government with a license to use this software, with all license costs and royalties being included in the Fee Schedule (Schedule C). All firmware will be the most recent version available at the time of shipping.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!