Topography and Minerals Sample Clauses

Topography and Minerals. There will be no filling, excavating, dredging, quarrying, mining, drilling or use of any surface or subsurface mining method; no removal of topsoil, sand, gravel, rock, peat, minerals, gas, oil, or other hydrocarbon products or other materials; and no change in the topography of the Protected Property in any manner except as may be reasonably necessary and incidental to carrying out any improvements and uses that are permitted on the Protected Property by this Easement. No sale of surface or subsurface minerals or mineral rights, including, but not limited to, gravel, sand, rock or topsoil from the Protected Property is permitted. No exploration or extraction of minerals, gas, oil or related hydrocarbons by any surface mining method, within the meaning of Section 170 (h) (5) (B) of the Code and the regulations is permitted.
AutoNDA by SimpleDocs

Related to Topography and Minerals

  • Topography Altering the existing topography of the Property by digging, plowing, disking, or otherwise disturbing the surface is prohibited, unless Grantee determines such requested action will be carried out consistent with the Restoration Plan and will be carried out in a manner that protects the conservation values. Grantor shall obtain Xxxxxxx’s written permission in advance of commencing such action.

  • Topographic Survey 3.1 Notify affected property owners of pending survey.

  • Samples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and that establish the standards by which such portion of the Work will be judged. The Contractor shall furnish for approval all samples required by the Contract Documents. The Work shall be in accordance with approved samples.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Inoculations The Employer agrees to pay full expenses for inoculation or immunization shots for the employee and for members of an employee’s household when such becomes necessary as a result of said employee’s exposure to contagious diseases (including AIDS, tuberculosis and hepatitis) where said officer has been exposed to said disease in the line of duty.

  • Sites Sites shall mean the locations set forth in the Contract Documentation.

  • Vegetation No trees or other vegetation may be removed from the site without prior approval from the Town, except in accordance with Section 4 above and pursuant to the Annual Plan.

  • Devices BNY Mellon will restrict the transfer of Customer Data from its network to mass storage devices. BNY Mellon will use a mobile device management system or equivalent tool when mobile computing is used to provide the services. Applications on such authenticated devices will be housed within an encrypted container and BNY Mellon will maintain the ability to remote wipe the contents of the container.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.

Time is Money Join Law Insider Premium to draft better contracts faster.