Topography and Soils Sample Clauses

Topography and Soils. Topographically, the region is characterised by flat terrain interspersed with isolated hills. The whole project area lies in the flat and undulating terrain with soil types such as Reddish Brown Earths, Non Calcic Brown soils, Low Humic Gley soil, Red Yellow Latosols and Regosols. Water Resources: Surface water is scarce in the coastal region in the Puttalam district. The situation is, however, better in the inland parts of the Puttalam district and the northern part of Kurunegala district along the proposed line corridor, where there are many small to medium irrigation tanks. Ground water could be extracted in substantial quantities in the deep-seated limestone aquifers found in the coastal region in Puttalam district. A seasonal variation could be expected in the ground water table following the rainfall regime. Infrastructure Facilities: Puttalam–Kurunegala region has a network of roads that leads to most interior parts of the two districts though most of them are village roads. A large number of village irrigation tanks and a few medium-scale tanks serve the small-scale paddy cultivation in the region. Household electrification rate in the North Western province that encompasses the two districts is 66%. Monthly electricity consumption per household is 60kWh. However, it is likely that the local level household electrification rates and household consumption at the level of DS divisions are below the provincial level rates. Industrial Activities: Industry employs a relatively small part of the population in both districts. Number of industrial establishments in the Puttalam and Kurunegala districts is 807 and 892, respectively. Persons employed in the sector are 11,381 and 18,294 in Puttalam and Kurunegala districts, respectively. Majority of them are small-scale industries that employ less than 25 persons per establishment. Some information on the industrial sector is presented in Table 4.10.
AutoNDA by SimpleDocs
Topography and Soils 

Related to Topography and Soils

  • Topography Altering the existing topography of the Property by digging, plowing, disking, or otherwise disturbing the surface is prohibited, unless Grantee determines such requested action will be carried out consistent with the Restoration Plan and will be carried out in a manner that protects the conservation values. Grantor shall obtain Xxxxxxx’s written permission in advance of commencing such action.

  • Topographic Survey 3.1 Notify affected property owners of pending survey.

  • Barriers Barriers shall be used to prevent the migration of airborne pollutants from areas under construction and to mitigate any construction noise that may disrupt occupant activities. If effective controls for pollution emissions cannot be practically implemented, activities involving significant airborne pollutants shall be scheduled during off-hours at Contractor’s expense. The Site shall be ventilated with fresh outside air during and immediately after the noxious activity.

  • Vegetation No trees or other vegetation may be removed from the site without prior approval from the Town, except in accordance with Section 4 above and pursuant to the Annual Plan.

  • Geological and Archeological Specimens If, during the execution of the Work, the Contractor, any Subcontractor, or any servant, employee, or agent of either should uncover any valuable material or materials, such as, but not limited to, treasure trove, geological specimens, archival material, archeological specimens, or ore, the Contractor acknowledges that title to the foregoing is vested in the Owner. The Contractor shall notify the Owner upon the discovery of any of the foregoing, shall take reasonable steps to safeguard it, and seek further instruction from the Design Professional. Any additional cost incurred by the Contractor shall be addressed under the provision for changed conditions. The Contractor agrees that the Geological and Water Resources Division and the Historic Preservation Division of the Georgia Department of Natural Resources may inspect the Work at reasonable times.

  • Geotechnical 19 The A/E as required shall review past pavement, soil 20 and geology investigations, discuss past findings as 21 impacting the subject roadway project, and independently 22 perform design-needed geotechnical services including 23 development and implementation of a field investigation plan 24 involving any field data collection as deemed necessary, 25 development of a laboratory testing program to conduct soils 26 surface and subsurface characterization tests as applicable 1 to the needs of the project, development of seismic analysis 2 and design criteria in accordance with code requirements, 3 development of pavement condition studies to provide 4 recommendations concerning life cycle costs and 5 rehabilitation/reconstruction methods, and recommendations 6 for the design of foundations, embankment and excavation 7 procedures, settlement analysis, lateral, active, and passive 8 earth pressures, de-watering, landslide mapping, slope 9 stabilization, soil corrosion, erosion, sedimentation control 10 and other applicable design criteria as deemed necessary.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Cryptography Supplier will maintain policies and standards on the use of cryptographic controls that are implemented to protect Accenture Data.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

Time is Money Join Law Insider Premium to draft better contracts faster.