Transmission of Power from the Landfill Project Sample Clauses

Transmission of Power from the Landfill Project. In the event -------------------------------------------------- that electrical power is generated in connection with the operation of the Landfill Project, at the sole election and direction of HNRC, the Parties shall take all reasonably practicable actions to allow the transmission of such generated power over or through the Power System. HNRC shall bear and pay all Incremental Costs that result from the transmission of such generated power through the Power System, including without limitation any Incremental Costs resulting from necessary modifications or repairs to the Power System.

Related to Transmission of Power from the Landfill Project

  • CONNECTING TRANSMISSION OWNER’S INTERCONNECTION FACILITIES As depicted on the one-line diagram in Attachment 3, the Connecting Transmission Owner’s Interconnection Facilities consist of the following constructed or installed between the POI and PCO, as well as metering and telecommunications located at the Bakerstand Solar Collector Substation.

  • Construction of the Project Highway (i) The Contractor shall construct the Project Highway as specified in Schedule- B and Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D. The Contractor shall be responsible for the correct positioning of all parts of the Works, and shall rectify any error in the positions, levels, dimensions or alignment of the Works. The [650th (six hundred and fiftieth) day] from the Appointed Date shall be the scheduled completion date (the “Scheduled Completion Date”) and the Contractor agrees and undertakes that the construction shall be completed on or before the Scheduled Completion Date, including any extension thereof. (ii) The Contractor shall construct the Project Highway in accordance with the Project Completion Schedule set forth in Schedule-J. In the event that the Contractor fails to achieve any Project Milestone or the Scheduled Completion Date within a period of 30 (thirty) days from the date set forth in Schedule-J, unless such failure has occurred due to Force Majeure or for reasons solely attributable to the Authority, it shall pay Damages to the Authority of a sum calculated at the rate of 0.05% (zero point zero five percent) of the Contract Price for delay of each day reckoned from the date specified in Schedule –J and until such Project Milestone is achieved or the Project Highway is completed; provided that if the period for any or all Project Milestones or the Scheduled Completion Date is extended in accordance with the provisions of this Agreement, the dates set forth in Schedule-J shall be deemed to be modified accordingly and the provisions of this Agreement shall apply as if Schedule-J has been amended as above; provided further that in the event the Project Highway is completed within or before the Scheduled Completion Date including any Time Extension, applicable for that work or section, the Damages paid under this Clause 10.3 (ii) shall be refunded by the Authority to the Contractor, but without any interest thereon. The Parties agree that for determining achievement or delays in completion of the Project Milestones or the Project on the due date, the works affected due to delay in providing the site for which time extension has been granted beyond the Scheduled Completion Date will be excluded. For example on the due date to achieve the Project Milestone-I (i.e., Stage Payments of 10% (ten percent) of Contract Price on 180th (one hundred and eighty) day from the Appointed Date), if 5% (five percent) of the project length corresponding to the Project Milestone-I is not handed over or lately handed over resulting in the extension of completion of this 5% (five percent) length beyond Scheduled Completion Date, Stage Payment of 10% X 0.95 = 9.5% only is to be achieved by 180th (one hundred and eighty) day. For the avoidance of doubt, it is agreed that recovery of Damages under this Clause 10.3 (ii) shall be without prejudice to the rights of the Authority under this Agreement including the right of Termination thereof. The Partiesfurther agree that Time Extension hereunder shall only be reckoned for and in respect of the affected Works as specified in Clause 10.5 (ii). (iii) The Authority shall notify the Contractor of its decision to impose Damages in pursuance with the provisions of this Clause 10.3. Provided that no deduction on account of Damages shall be effected by the Authority without notifying the Contractor of its decision to impose the Damages, and taking into consideration the representation, if any, made by the Contractor within 20 (twenty) days of such notice. The Parties expressly agree that the total amount of Damages under Clause 10.3 (ii) shall not exceed 10% (ten percent) of the Contract Price. If the damages exceed 10% (ten percent) of the Contract Price, the Contractor shall be deemed to be in default of this agreement having no cure and the Authority shall be entitled to terminate this Agreement by issuing a Termination Notice in accordance with the provisions of Clause 23.1 (ii). (iv) In the event that the Contractor fails to achieve the Project Completion within a period of 90 (ninety) days from the Schedule Completion Date set forth in Schedule-J, unless such failure has occurred due to Force Majeure or for reasons solely attributable to the Authority, the contractor shall be deemed to be ineligible for bidding any future projects of the Authority, both as the sole party or as one of the parties of Joint Venture/ Consortium during the period from Scheduled Completion Date to issuance of Completion Certificate. This restriction is applicable if the contract value of the delayed project is not less than Rs. 300 Crore.

  • Completion of Concrete Pours and Emergency Work (a) Except as provided in this sub-clause an Employee shall nor work or be required to work in the rain. (b) Employees shall not be required to start a concrete pour in Inclement Weather. (c) Where a concrete pour has been commenced prior to the commencement of a period of Inclement Weather Employees may be required to complete such concrete pour to a practical stage and for such work shall be paid at the rate of double time calculated to the next hour, and in the case of wet weather shall be provided with adequate wet weather gear. (d) If an Employee’s clothes become wet as a result of working in the rain during a concrete pour the Employee shall, unless the Employee has a change of dry working clothes available, be allowed to go home without loss of pay. (e) The provisions of clauses 32.7(c) and 32.7(d) hereof shall also apply in the case of emergency work where the Employees concerned and their delegates agree that the work is of an emergency nature and can start and/or proceed.

  • Connecting Transmission Owner’s Attachment Facilities Connecting Transmission Owner shall design, procure, construct, install, own and/or control the Connecting Transmission Owner’s Attachment Facilities described in Appendix A hereto, at the sole expense of the Developer.

  • Transmission Facilities The NTO owns certain transmission facilities over which the ISO will have day-to-day operational control to maintain these facilities in a reliable state, as defined by the Reliability Rules and all other applicable reliability rules, standards and criteria, and in accordance with the ISO Tariffs, ISO Related Agreements and ISO Procedures (“ISO Operational Control”). These NTO facilities shall be classified as “NTO Transmission Facilities Under ISO Operational Control,” and are listed in Appendix A-1 of this Agreement. The NTO also will be responsible for providing notification to the ISO with respect to actions related to certain other transmission facilities. These facilities shall be classified as “NTO Transmission Facilities Requiring ISO Notification,” and are listed in Appendix A-2 of this Agreement. Transmission facilities may be added to, or deleted from, the lists of facilities provided in Appendices A-1 and A-2 herein by mutual written agreement of the ISO and the NTO owning and controlling such facilities. Currently listed facilities will be posted on the ISO’s OASIS.

  • NYISO and Connecting Transmission Owner Obligations Connecting Transmission Owner and NYISO shall cause the New York State Transmission System and the Connecting Transmission Owner’s Attachment Facilities to be operated, maintained and controlled in a safe and reliable manner in accordance with this Agreement and the NYISO Tariffs. Connecting Transmission Owner and NYISO may provide operating instructions to Developer consistent with this Agreement, NYISO procedures and Connecting Transmission Owner’s operating protocols and procedures as they may change from time to time. Connecting Transmission Owner and NYISO will consider changes to their respective operating protocols and procedures proposed by Developer.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and Ymax, Ymax, at its own expense, shall: 2.4.1.1 provide its own facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA; and/or 2.4.1.2 obtain transport to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA (a) from a third party, or, (b) if Verizon offers such transport pursuant to this Agreement or an applicable Verizon Tariff, from Verizon. 2.4.2 Where the Parties use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and Ymax, Verizon, at its own expense, shall provide its own facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA. 2.4.3 Prior to establishing any Two-Way Interconnection Trunks, Ymax shall meet with Verizon to conduct a joint planning meeting (“Joint Planning Meeting”). At that Joint Planning Meeting, each Party shall provide to the other Party originating Centium Call Seconds (Hundred Call Seconds) information, and the Parties shall mutually agree on the appropriate initial number of End Office and Tandem Two-Way Interconnection Trunks and the interface specifications at the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA at which the Parties interconnect for the exchange of traffic. Where the Parties have agreed to convert existing One-Way Interconnection Trunks to Two-Way Interconnection Trunks, at the Joint Planning Meeting, the Parties shall also mutually agree on the conversion process and project intervals for conversion of such One- Way Interconnection Trunks to Two-Way Interconnection Trunks. 2.4.4 On a semi-annual basis, Ymax shall submit a good faith forecast to Verizon of the number of End Office and Tandem Two-Way Interconnection Trunks that Ymax anticipates Verizon will need to provide during the ensuing two (2) year period for the exchange of traffic between Ymax and Verizon. Ymax’s trunk forecasts shall conform to the Verizon CLEC trunk forecasting guidelines as in effect at that time. 2.4.5 The Parties shall meet (telephonically or in person) from time to time, as needed, to review data on End Office and Tandem Two-Way Interconnection Trunks to determine the need for new trunk groups and to plan any necessary changes in the number of Two-Way Interconnection Trunks. 2.4.6 Two-Way Interconnection Trunks shall have SS7 Common Channel Signaling. The Parties agree to utilize B8ZS and Extended Super Frame (ESF) DS1 facilities, where available. 2.4.7 With respect to End Office Two-Way Interconnection Trunks, both Parties shall use an economic Centium Call Seconds (Hundred Call Seconds) equal to five (5). Either Party may disconnect End Office Two-Way Interconnection Trunks that, based on reasonable engineering criteria and capacity constraints, are not warranted by the actual traffic volume experienced. 2.4.8 Two-Way Interconnection Trunk groups that connect to a Verizon access Tandem shall be engineered using a design blocking objective of Xxxx-Xxxxxxxxx B.005 during the average time consistent busy hour. Two-Way Interconnection Trunk groups that connect to a Verizon local Tandem shall be engineered using a design blocking objective of Xxxx- Xxxxxxxxx B.01 during the average time consistent busy hour. Verizon and Xxxx shall engineer Two-Way Interconnection Trunks using BOC Notes on the LEC Networks SR-TSV-002275. 2.4.9 The performance standard for final Two-Way Interconnection Trunk groups shall be that no such Interconnection Trunk group will exceed its design blocking objective (B.005 or B.01, as applicable) for three (3) consecutive calendar traffic study months. 2.4.10 Ymax shall determine and order the number of Two-Way Interconnection Trunks that are required to meet the applicable design blocking objective for all traffic carried on each Two-Way Interconnection Trunk group. Ymax shall order Two-Way Interconnection Trunks by submitting ASRs to Verizon setting forth the number of Two-Way Interconnection Trunks to be installed and the requested installation dates within Verizon’s effective standard intervals or negotiated intervals, as appropriate. Ymax shall complete ASRs in accordance with OBF Guidelines as in effect from time to time. 2.4.11 Verizon may (but shall not be obligated to) monitor Two-Way Interconnection Trunk groups using service results for the applicable design blocking objective. If Verizon observes blocking in excess of the applicable design objective on any Tandem Two-Way Interconnection Trunk group and Ymax has not notified Verizon that it has corrected such blocking, Verizon may submit to Ymax a Trunk Group Service Request directing Ymax to remedy the blocking. Upon receipt of a Trunk Group Service Request, Ymax will complete an ASR to establish or augment the End Office Two-Way Interconnection Trunk group(s), or, if mutually agreed, to augment the Tandem Two-Way Interconnection Trunk group with excessive blocking and submit the ASR to Verizon within five (5) Business Days. 2.4.12 The Parties will review all Tandem Two-Way Interconnection Trunk groups that reach a utilization level of seventy percent (70%), or greater, to determine whether those groups should be augmented. Ymax will promptly augment all Tandem Two-Way Interconnection Trunk groups that reach a utilization level of eighty percent (80%) by submitting ASRs for additional trunks sufficient to attain a utilization level of approximately seventy percent (70%), unless the Parties agree that additional trunking is not required. For each Tandem Two-Way Interconnection Trunk group with a utilization level of less than sixty percent (60%), unless the Parties agree otherwise, Ymax will promptly submit ASRs to disconnect a sufficient number of Interconnection Trunks to attain a utilization level of approximately sixty percent (60%) for each respective group, unless the Parties agree that the Two-Way Interconnection Trunks should not be disconnected. In the event Ymax fails to submit an ASR for Two-Way Interconnection Trunks in conformance with this Section, Verizon may disconnect the excess Interconnection Trunks or bill (and Ymax shall pay) for the excess Interconnection Trunks at the applicable Verizon rates. 2.4.13 Because Verizon will not be in control of when and how many Two- Way Interconnection Trunks are established between its network and Ymax’s network, Verizon’s performance in connection with these Two- Way Interconnection Trunk groups shall not be subject to any performance measurements and remedies under this Agreement, and, except as otherwise required by Applicable Law, under any FCC or Commission approved carrier-to-carrier performance assurance guidelines or plan. 2.4.14 Ymax will route its traffic to Verizon over the End Office and Tandem Two-Way Interconnection Trunks in accordance with SR-TAP-000191, including but not limited to those standards requiring that a call from Ymax to a Verizon End Office will first be routed to the End Office Interconnection Trunk group between Ymax and the Verizon End Office.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Onvoy to Frontier, Onvoy, at Onvoy’s own expense, shall: 2.3.1.1 provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA; and/or 2.3.1.2 obtain transport for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA (a) from a third party, or, (b) if Frontier offers such transport pursuant to a Frontier access Tariff, from Frontier. 2.3.2 For each Tandem or End Office One-Way Interconnection Trunk group for delivery of traffic from Onvoy to Frontier with a utilization level of less than sixty percent (60%) for final trunk groups and eighty-five percent (85%) for high usage trunk groups, unless the Parties agree otherwise, Onvoy will promptly submit ASRs to disconnect a sufficient number of Interconnection Trunks to attain a utilization level of approximately sixty percent (60%) for all final trunk groups and eighty-five percent (85%) for all high usage trunk groups. In the event Onvoy fails to submit an ASR to disconnect One-Way Interconnection Trunks as required by this Section, Frontier may disconnect the excess Interconnection Trunks or bill (and Onvoy shall pay) for the excess Interconnection Trunks at the rates set forth in the Pricing Attachment. 2.3.3 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Frontier to Onvoy, Frontier, at Frontier’s own expense, shall provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA.