Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.
Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.
Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.
Surface Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner. Blading shall not undercut the backslope or cut into geotextile fabric on the road. If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock. Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator. Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator. For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.
Project Site The “Project Site” is the place where the Work is being carried on.
Alpine Areas The employer shall pay an Alpine disability allowance of $2.50 per hour worked on projects in alpine areas.
PROPANE GAS SYSTEM SERVICE AREA If the Property is located in a propane gas system service area owned by a distribution system retailer, Seller must give Buyer written notice as required by §141.010, Texas Utilities Code. An addendum containing the notice approved by TREC or required by the parties should be used.
The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for:
Service Areas The MCP agrees to provide services to Aged, Blind or Disabled (ABD) members, Modified Adjusted Gross Income (MAGI) members, and Adult Extension members residing in the following service area(s): Central/Southeast Region ☐ Northeast Region ☐ West Region ☐ The ABD and MAGI categories of assistance are described in OAC rule 5160-26-02. The Adult Extension category is defined in Ohio’s Medicaid State Plan as authorized by the Centers for Medicare and Medicaid Services (CMS). The MCP shall serve all counties in any region they agree to serve.
Project Area The Project Area is the incorporated area of the City of San Xxxx.