Two-Lane Two-Way Roadways Sample Clauses

Two-Lane Two-Way Roadways a. Lead Vehicles The lead vehicle may be a separate vehicle or the work vehicle applying the pavement markings may be used as the lead vehicle. The lead vehicle shall have an arrow panel mounted so that the panel is easily visible to oncoming (approaching) traffic. The arrow panel should typically operate in the caution mode.
AutoNDA by SimpleDocs

Related to Two-Lane Two-Way Roadways

  • Roadways Roadways shall be designed in accordance with design data and criteria of the Ministry of Transportation as revised from time to time. Roadways shall be constructed in the locations and to the widths and grades indicated within Schedules "A-1" and "E" and set out in Schedule "D" attached hereto.

  • Porcupine Site Highway 11

  • Access Roads The Company is to construct a public access road from Xxxxx Avenue to the Town Centre together with all other roads shown on the Land Tenure Plan. All roads are to be paved and drained to the satisfaction of the City.

  • Orlando, FL; Ft Lauderdale, FL; Charlotte-Gastonia-Rock Hill, NC; Greensboro-Winston Salem-High Point, NC; Nashville, TN; and New Orleans, LA, and BellSouth has provided non- discriminatory cost based access to the Enhanced Extended Link (EEL) throughout Density Zone 1 as determined by NECA Tariff No. 4 as in effect on January 1, 1999.

  • Roads 16. (1) The Joint Venturers shall —

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Loop A transmission path that extends from a Main Distribution Frame or functionally comparable piece of equipment in a Customer's serving End Office, to the Rate Demarcation Point (or NID if installed at the Rate Demarcation Point) in or at the Customer's premises. The actual transmission facilities used to provide a Loop may utilize any of several technologies.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Bridges a. Installation of a temporary (Xxxxxx-type) bridge over an existing structure or at a previously disturbed location, such as a former bridge location, to allow passage of emergency vehicles.

  • Seat Belt Use The Recipient agrees to implement Executive Order No. 13043, “Increasing Seat Belt Use in the United States,” April 16, 1997, 23 U.S.C. § 402 note, (62 Fed. Reg. 19217), by:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!