Underground Cables. Underground cables shall be 3 core XLPE/SWA/PVC 600/1000 volt grade Black cable with copper conductors with Brown, Blue and Green /Yellow sheathed inner cores, outer sheath to be embossed ‘STREET LIGHTING’ to BS5467/with a minimum C.S.A of 10.0 mm Sq unless otherwise identified in this Specification. All cables are to be glanded to a double pole cut-out, with brass compression glands, brass locknuts and PVC shrouds made off into a brass cable entry plate. XLPE cable compression glands shall be manufactured to BS6121 PT 1 2005. Unused brass cable entry plate holes shall be fitted with blanked rubber grommets or plastic inserts. The use of cable joints will not be allowed unless otherwise agreed by the Network Lighting Manager. All underground cables shall be laid in Twinwall Ducts as follows:-
AutoNDA by SimpleDocs
Underground Cables. H.T. cables shall be laid 1 000mm and L.V. cables 600mm below general ground level. All cables in soil trenches shall be bedded in river sand or sifted ground (no clay) 75mm below and 75mm over the cables before backfilling of excavations. The electrical contractor shall install cable markers on cable runs, on all bends and at 50m spacing on straight runs. Positions of cable markers must be confirmed on the site. Cable markers shall consist of 150mm x 150mm x 300mm high concrete blocks with aluminium or other rust-free metal plate marked "HV cable" or "L.T. cable" or as otherwise specified and applicable. Yellow or orange PVC marking tape, 150mm wide, with the wording "Buried electric cable below - caution" and "Elektriesekabelhieronder - gevaar" shall be laid approximately 300mm below ground level above each electrical cable.
Underground Cables. Special care should also be taken to ensure that driveways and any other construction activities within the footpath area do not interfere with the existing cables in the footpath. Ausgrid cannot guarantee the depth of cables due to possible changes in ground levels from previous activities after the cables were installed. Hence it is recommended that the developer locate and record the depth of all known underground services prior to any excavation in the area. Safework Australia – Excavation Code of Practice, and Ausgrid’s Network Standard NS156 outlines the minimum requirements for working around Ausgrid’s underground cables. Should ground anchors be required in the vicinity of the underground cables, the anchors must not be installed within 300mm of any cable, and the anchors must not pass over the top of any cable.

Related to Underground Cables

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • UNDERGROUND LOCATIONS Prior to the Company commencing any work the Customer must advise the Company of the precise location of all underground services on the site and clearly xxxx the location. The underground mains and services the Customer must identify include, but are not limited to, telephone cables, fibre optic cables, electrical services, gas services, sewer services, pumping services, sewer connections, sewer sludge mains, water mains, irrigations pipes, oil pumping mains and any other services that may be on site. Whilst the Company will take all care to avoid damage to any underground services the Customer agrees to indemnify the Company in respect of all any liability claims, loss, damage, cost and fines as a result of damage to services not precisely located and notified pursuant to this clause.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Terminals Hartford Terminal. Hartford Terminal is located at or near Hartford, Illinois. The facility consists of a two-bay truck rack with 17,000 barrels of active terminaling capacity, 13 above-ground storage tanks with approximately 1.1 million barrels of total storage capacity. The Hartford barge dock consists of a single-berth barge loading facility, approximately 0.8 miles of 8-inch pipeline and approximately 0.8 miles of 14-inch pipeline from the Hartford terminal to the Hartford barge dock for delivery.

  • Irrigation The City shall provide water to the Premises for the purpose of irrigating the facility. The City specifically reserves the right to restrict water usage under this Agreement if water restrictions are placed on other water users within the City. Prior to the start of the season, City will provide charge up and run through the automatic irrigation systems to check for proper operation. City will provide Lessee with a radio for remote operation of the irrigation system, which Lessee shall use for the day to day maintenance, repair, and monitoring of the irrigation system. If the radio is lost, stolen, broken, or is rendered unusable, Lessee shall pay $1500 for the replacement radio. City is responsible for the maintenance and repair of the following irrigation elements, to the extent applicable: curb stops, backflow prevention devices, backflow enclosures, main line pipings, electric control valves, and controllers. Lessee shall notify Parks Division Water managers by email if any of these irrigation elements are malfunctioning or broken.

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

  • Structures Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers; flexible and rigid pavements; navigational aids; buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein. 10-50 SUBGRADE. The soil which forms the pavement foundation.

Time is Money Join Law Insider Premium to draft better contracts faster.