Underloaded Railcars Sample Clauses

Underloaded Railcars. It is the sole obligation and responsibility of Seller to load trains to the minimum train weight as directed by and in compliance with the applicable transportation contract. It shall be Seller's responsibility to verify minimum weight from Purchaser's transportation coordinator before loading train. Railcars that are loaded for movement on Norfolk Southern Railway under the Agreement shall be loaded to not less than 94% of UMLER capacity from non-batch-weigh Origins and 97% of UMLER capacity from batch-weigh flood-load Origins.
AutoNDA by SimpleDocs

Related to Underloaded Railcars

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • Removal of Equipment Lessee shall have and is hereby given and granted twelve (12) months after a valid forfeiture, cancellation or other termination of this lease to remove from said property all buildings, structures, warehouse stocks, merchandise, materials, tools, hoists, compressors, engines, motors, pumps, transformers, electrical accessories, metal or wooden tanks, pipes and connections, rails, mine cars and any and all machinery, trade fixtures, and equipment erected or placed in or upon said property by it, provided that such right of removal shall not extend to foundations and mine timbers in place unless Lessor shall have given his previous written consent thereto. If Lessee is hampered by snowdrifts, washouts, inclement weather, or other climatic conditions, from completing the removal of said property and equipment within the time specified, then Lessor agrees to extend the time by a reasonable period if requested by Lessee.

  • Airframe The Airbus A300F4-605R aircraft (excluding the Engines or engines from time to time installed thereon) to be leased by the Lessor to the Lessee pursuant to the Lease and the initial Lease Supplement and having the United States FAA Registration Number initially and manufacturer's serial number specified in the initial Lease Supplement, including (i) all Parts in respect thereof and (ii) any Replacement Airframe which may be substituted pursuant to Section 11.03

  • Leased Equipment Schedule 3.16(e) hereto contains a list of all leases or other agreements, whether written or oral, under which the Corporation is lessee of or holds or operates any items of machinery, equipment, tools, motor vehicles, furniture and fixtures or other property (other than real property) owned by any third party (collectively, the "Leased Equipment").

  • Delivery Point Once Manufacture of the Products has been completed, Contractor shall be responsible for delivering the Finished Goods FCA, (as defined in Incoterms (2000) published by the International Chamber of Commerce) and to a freight forwarder specified by Company in its Order, or otherwise approved by Company. “Delivery Point” as used in this Agreement shall mean the specific time and location that the Product is delivered to the shipper specified on the Order.

  • LEASE OF EQUIPMENT Lessor leases to Lessee, and Lessee leases from Lessor, all the property described in the Lease Schedules which are signed from time to time by Lessor and Lessee.

  • Aircraft The Airframe to be sold by AVSA to the Owner Trustee as provided in the Participation Agreement and to be leased under the Lease (or any permitted substitute airframe thereunder) together with two Engines (whether either is an initial Engine or a Replacement Engine) whether or not any of such initial or Replacement Engines may from time to time be installed on such Airframe or may be installed on any other airframe or on any other aircraft, including any aircraft substituted pursuant to Section 11.03

  • Emergency Generator Tenant shall have the right to tie into and use the emergency generator to be installed by Landlord as part of the Base Building Work for use by tenants of the Unit (the “Unit Generator”). Tenant shall be responsible, at its sole cost and expense, for installing, maintaining, repairing and replacing its connection between the Premises and the Unit Generator, and all associated cabling. Tenant shall be permitted to use up to an average of three (3) xxxxx per square foot of usable area in the Premises from the Unit Generator, and at no time shall Tenant exceed that use limitation with respect to the Unit Generator. Except to the extent that Tenant ties into the Unit Generator as part of the Initial Tenant Work in accordance with the provisions of the Work Letter, installation of such tie-in and any related cabling, conduit and appurtenances will be governed by the applicable provisions of this Lease relating to Tenant Work. Tenant will submit to Landlord at least thirty (30) days prior to the proposed installation date Tenant’s proposed plans and specifications relating to the tie-in to the Unit Generator and all associated lines. Tenant may not commence any work to tie into the Unit Generator until it has received Landlord’s prior written approval (not to be unreasonably withheld, delayed or conditioned) of such plans and specifications. Tenant, at its sole cost and expense, shall comply with all applicable Legal Requirements and Title Matters and Landlord’s reasonable directives relating to the installation, operation, maintenance and repair of such tie-in, including (i) obtaining and maintaining (or causing to be obtained and maintained) and complying with the provisions of all applicable permits relating to the tie into and use of the Unit Generator. Tenant may not use the Unit Generator for any purpose other than solely in connection with Tenant’s occupancy of the Premises for the Permitted Use and in accordance with any applicable permit(s) pertaining to the Unit Generator. Except for permitted subtenants and assignees. Tenant may not use the Unit Generator to serve other occupant(s) of the Development.

  • Floor Load Tenant shall not place a load upon any floor of the Premises that exceeds 50 pounds per square foot “live load”. Landlord reserves the right to reasonably designate the position of all Equipment which Tenant wishes to place within the Premises, and to place limitations on the weight thereof.

Time is Money Join Law Insider Premium to draft better contracts faster.