Updated Record Drawings Sample Clauses

Updated Record Drawings. Promptly after the Owner records the Notice of Substantial Completion with the SFD, the Engineer shall furnish the Owner, at no expense to the Owner, reproducible Record Drawings in a form approved by the Owner, and shall include all revisions made in the course of construction. The Engineer shall also provide the Owner an electronic file of the Record Drawings in a computer program acceptable to the Owner. Revisions or changes shall be properly annotated on the reproducible plans and cross‐referenced. Each sheet of the plans shall be prominently noted, “Record Drawings.” The Engineer may require the Contractor to maintain and update throughout the construction period a set of construction plans and specifications noting as‐built conditions. The Engineer shall rely on the accuracy of these documents in the preparation of as‐built documents for submittal to the Owner.
AutoNDA by SimpleDocs
Updated Record Drawings. Two, half (18” x 24”) size sets and two flash drives, containing updated record drawings. The following sections should be provided as applicable:
Updated Record Drawings. Owner’s Representative shall facilitate and monitor the review by the Architect of preparation of as-built documents by the Contractor during construction; and promptly after the issuance of the Notice of Substantial Completion monitor preparation of the reproducible Record Drawings by the Architect.

Related to Updated Record Drawings

  • Record Drawings A final set of drawings prepared by the Architect that incorporates all changes from all As- Builts, sketches, details, and clarifications.

  • The Drawings The Drawings are the graphic and pictorial portions of the Contract Documents showing the design, location and dimensions of the Work, generally including plans, elevations, sections, details, schedules and diagrams.

  • Approved Working Drawings The Final Working Drawings shall be approved by Landlord (the “Approved Working Drawings”) prior to the commencement of construction of the Premises by Tenant. After approval by Landlord of the Final Working Drawings, Tenant may submit the same to the appropriate municipal authorities for all applicable building permits. Tenant hereby agrees that neither Landlord nor Landlord’s consultants shall be responsible for obtaining any building permit or certificate of occupancy for the Premises and that obtaining the same shall be Tenant’s responsibility; provided, however, that Landlord shall cooperate with Tenant in executing permit applications and performing other ministerial acts reasonably necessary to enable Tenant to obtain any such permit or certificate of occupancy. No changes, modifications or alterations in the Approved Working Drawings may be made without the prior written consent of Landlord, which consent may not be unreasonably withheld.

  • Working Drawings Not later than 15 business days following the approval of the TI Design Drawings by Landlord, Tenant shall cause the TI Architect to prepare and deliver to Landlord for review and comment construction plans, specifications and drawings for the Tenant Improvements (“TI Construction Drawings”), which TI Construction Drawings shall be prepared substantially in accordance with the TI Design Drawings. Tenant shall be solely responsible for ensuring that the TI Construction Drawings reflect Tenant’s requirements for the Tenant Improvements. Landlord shall deliver its written comments on the TI Construction Drawings to Tenant not later than 10 business days after Landlord’s receipt of the same; provided, however, that Landlord may not disapprove any matter that is consistent with the TI Design Drawings. Tenant and the TI Architect shall consider all such comments in good faith and shall, within 10 business days after receipt, notify Landlord how Tenant proposes to respond to such comments. Any disputes in connection with such comments shall be resolved in accordance with Section 2(d) hereof. Provided that the design reflected in the TI Construction Drawings is consistent with the TI Design Drawings, Landlord shall approve the TI Construction Drawings submitted by Tenant. Once approved by Landlord, subject to the provisions of Section 4 below, Tenant shall not materially modify the TI Construction Drawings except as may be reasonably required in connection with the issuance of the TI Permit (as defined in Section 3(a) below).

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents. 9.2 Materials or Work described in words that so applied have a well-known technical or trade meaning shall be deemed to refer to recognized standards, unless noted otherwise. 9.3 Trade Name or Trade Term It is not the intention of the Contract Documents to go into detailed descriptions of any materials and/or methods commonly known to the trade under “trade name” or “trade term.” The mere mention or notation of “trade name” or “trade term” shall be considered a sufficient notice to Developer that it will be required to complete the work so named, complete, finished, and operable, with all its appurtenances, according to the best practices of the trade. 9.4 The naming of any material and/or equipment shall mean furnishing and installing of same, including all incidental and accessory items thereto and/or labor therefor, as per best practices of the trade(s) involved, unless specifically noted otherwise. 9.5 Contract Documents are complementary, and what is called for by one shall be binding as if called for by all. As such, Drawings and Specifications are intended to be fully cooperative and to agree. However, if Developer observes that Drawings and Specifications are in conflict with the Contract Documents, Developer shall promptly notify District and Architect in writing, and any necessary changes shall be made as provided in the Contract Documents. 9.6 Figured dimensions shall be followed in preference to scaled dimensions, and Developer shall make all additional measurements necessary for the work and shall be responsible for their accuracy. Before ordering any material or doing any work, each Developer shall verify all measurements at the building and shall be responsible for the correctness of same. 9.7 Should any question arise concerning the intent or meaning of the Contract Documents, including the Plans and Specifications, the question shall be submitted to the District for interpretation. If a conflict exists in the Contract Documents, these Construction Provisions shall control over the Facilities Lease, which shall control over the Site Lease, which shall control over Division 1 Documents, which shall control over Division 2 through Division 49 documents, which shall control over figured dimensions, which shall control over large-scale drawings, which shall control over small-scale drawings. In no case shall a document calling for lower quality and/or quantity of material or workmanship control. However, in the case of discrepancy or ambiguity solely between and among the Drawings and Specifications, the discrepancy or ambiguity shall be resolved in favor of the interpretation that will provide District with the functionally complete and operable Project described in the Drawings and Specifications. 9.8 Drawings and Specifications are intended to comply with all laws, ordinances, rules, and regulations of constituted authorities having jurisdiction, and where referred to in the Contract Documents, the laws, ordinances, rules, and regulations shall be considered as a part of the Contract Documents within the limits specified. 9.9 As required by Section 4-317(c), Part 1, Title 24, CCR: “Should any existing conditions such as deterioration or non-complying construction be discovered which is not covered by the DSA-approved documents wherein the finished work will not comply with Title 24, California Code of Regulations, a construction change document, or a separate set of plans and specifications, detailing and specifying the required repair work shall be submitted to and approved by DSA before proceeding with the repair work.”

  • Shop Drawings All drawings, prints, diagrams, illustrations, brochures, schedules, and other data that are prepared by Developer, a subcontractor, manufacturer, supplier, or distributor, that illustrate how specific portions of the Work shall be fabricated or installed.

  • Borrowing Base Reports Within thirty (30) days after the last day of each month, aged listings of accounts receivable and accounts payable (by invoice date) (the “Borrowing Base Reports”);

  • Borrowing Base Certificates The Borrowers shall deliver to the Administrative Agent (and the Administrative Agent shall promptly deliver same to the Lenders) quarterly Borrowing Base Certificates within 20 days of the fiscal quarter then ended prepared as of the close of business on the last Business Day of the previous fiscal quarter (provided that (1) during a Monthly Reporting Period, the Borrowers shall deliver to the Administrative Agent monthly Borrowing Base Certificates by the 20th day of each month prepared as of the close of business on the last Business Day of the previous month or (2) a Liquidity Event shall have occurred and be continuing, the Borrowers shall deliver to the Administrative Agent weekly Borrowing Base Certificates by Wednesday of every week prepared as of the close of business on Friday of the previous week, which weekly Borrowing Base Certificates shall be in standard form unless otherwise reasonably agreed to by the Administrative Agent; it being understood that (i) Inventory amounts shown in the Borrowing Base Certificates delivered on a weekly basis will be based on the Inventory amount (a) set forth in the most recent weekly report, where possible, and (b) for the most recently ended month for which such information is available with regard to locations where it is impracticable to report Inventory more frequently, and (ii) the amount of Eligible Accounts shown in such Borrowing Base Certificate will be based on the amount of the gross Accounts set forth in the most recent weekly report, less the amount of ineligible Accounts reported for the most recently ended month). All calculations of Availability in any Borrowing Base Certificate shall be made by the Borrowers and certified by a Responsible Officer, provided that the Administrative Agent may from time to time review and adjust any such calculation in consultation with the Lead Borrower (a) to reflect its reasonable estimate of declines in value of any Collateral, due to collections received in the Dominion Account or otherwise; (b) to adjust advance rates to reflect changes in dilution, quality, mix and other factors affecting Collateral; and (c) to the extent the calculation is not made in accordance with this Agreement or does not accurately reflect the Availability Reserve. By the 20th day after the end of each fiscal quarter (commencing with the fiscal quarter ending June 30, 2012), the Borrowers shall deliver (i) to the Administrative Agent an Applicable Margin Certificate setting forth a calculation of the Average Availability for the fiscal quarter most recently ended and the corresponding Applicable Margins, and (ii) updates, if any, to Schedule O to the Collateral Questionnaire to reflect all locations of Inventory at the end of the fiscal quarter then ended.

  • Final Working Drawings Tenant shall supply the Engineers with a complete listing of standard and non-standard equipment and specifications, including, without limitation, B.T.U. calculations, electrical requirements and special electrical receptacle requirements for the Premises, to enable the Engineers and the Architect to complete the “Final Working Drawings” (as that term is defined below) in the manner as set forth below. Tenant shall cause the approved Final Space Plan to be converted by the Architect and the Engineers to complete architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is complete to allow subcontractors to bid on the work and to obtain all applicable permits (collectively, the “Final Working Drawings”) and shall submit the same to Landlord for Landlord’s approval. Tenant shall supply Landlord with four (4) copies signed by Tenant of such Final Working Drawings. Landlord shall advise Tenant within five (5) business days after Landlord’s receipt of the Final Working Drawings for the Premises if the same is unsatisfactory or incomplete in any respect. If Tenant is so advised, Tenant shall immediately revise the Final Working Drawings in accordance with such review and any disapproval of Landlord in connection therewith. Landlord and Tenant acknowledge that the Final Space Plans may not depict certain structural elements of the Building and/or various elements of the Building systems which may result in material modifications to the Final Working Drawings (“Space Plan Modifications”) Furthermore, the Final Space Plans for the construction of the Tenant Improvements may require modification to account for the requirements of building codes and other legal requirements of applicable governmental entities, including, but not limited to, Title 24 and the Americans with Disabilities Act (collectively the “Building Codes”). The Final Working Drawings shall materially conform to the Final Space Plans, taking into account (i) Space Plan Modifications, (ii) the requirements of the Building Codes, (iii) other modifications resulting from physical constraints of the Premises and (iv) modifications requested by Tenant and consented to by Landlord, which consent shall not be unreasonably withheld. Tenant agrees that, in addition to other factors and considerations Landlord may take into account, it shall not be unreasonable for Landlord to withhold its consent to any matters set forth in the Final Working Drawings and not contained in the Final Space Plans, (i) if such requested modifications would not comply with the Building Codes or any laws, (ii) subject to Section 7 if such requested modifications would cause the anticipated cost of the Tenant Improvements to exceed the Tenant Improvement Allowance (unless Tenant agrees to be responsible for all such costs, and provide evidence satisfactory to Landlord of Tenant’s ability to pay such amounts, including escrow the funds if required by Landlord), (iii) if such requested modifications would not increase the value of the Tenant Improvements, (iv) if such requested modifications would increase the burden on the Building systems, either during construction or after completion of same.

  • Borrowing Base Report The Agent shall have received from the Borrower the initial Borrowing Base Report dated as of the Closing Date.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!