Ventral method Sample Clauses

Ventral method. Grasp the toad so that the hind legs point away from your body and the ventral side is up. About 0.78-1.17 in (2-3 cm) craniad and laterally from the cloaca (see Figure 4), pinch a small amount of ventral skin and with fine, sharp scissors, snip a very small horizontal hole through the skin, ensuring that all layers of the skin have been penetrated. Insert the needle sub-cutaneously, but shallowly, through the opening in the skin. Be sure the PIT tag is inserted fully into the hole. Place a finger over the needle and slowly withdraw, making sure that the tag remains implanted. For both methods, the wound should be small and somewhat self-closing. However, the wound may be more securely closed using Nexaban or Vet Seal. Upon capture of a toad, the scanner should be passed over the animal multiple times, as experience has shown that the orientation of the tag in the animal’s body affects detection and the tag may not “read” on initial passes. PIT tags sometimes move, or "migrate", over time. Examine the toad for visual evidence of a tag, including the legs, before inserting a new tag. Some populations have been tagged using older tags that may be visible, but which current equipment does not read. If monitoring toads from one of these populations (such as Xxxxxx Gulch), you may need to remove an existing unreadable tag and replace it with a new tag. To remove an old tag, pinch the skin near the tag and use fine scissors to cut a small horizontal hole through all layers of the skin. Work the existing tag through the hole; insert a new tag through the same hole and close and seal the wound. Put the old tag in a small container with the number of the new tag and ensure that the records note that this is a recapture with a number reassignment.
AutoNDA by SimpleDocs

Related to Ventral method

  • ICE Method The method used to calculate One-Month LIBOR, as described in Section 3.05.

  • Billing Method 1.5.1 To receive payment for services rendered under this contract, the Contractor shall submit a fully completed invoice for work previously performed to: Minneapolis Public Housing Authority Attention: Accounts Payable, Suite 307 0000 Xxxxxxxxxx Xxx X, Xxxxxxxxxxx, XX 00000 or: xxxxxxxx@xxxxxxx.xxx

  • Procurement Method (a) Quality-Based Selection (b) Selection under a Fixed Budget

  • Test method 3.3.1. The method used shall be that described in Annex 3, paragraph 3.1.

  • Deployment Method You may only install the Products on servers and workstations under the control of your third-party service provider who hosts the Products on your behalf in a public cloud, and will deploy the Products only in the operating environment specified on the order. If the “Cloud Platform for AWS” operating environment is specified on the order, you may deploy the Products listed on the order solely in an Amazon Web Services environment, except for any Products which technically require deployment in a different operating environment. If the “Cloud Platform for Azure” operating environment is specified on the order, you may deploy the Products listed on the order solely in a Microsoft Azure environment, except for any Products which technically require deployment in a different operating environment. 4. 部署方式。您只能在代表您于公共云中托管产品的第三方服务提供商控制的服务器或工作站上安装产品,并且您将只在订单指定的操作环境中部署产品。如果订单上指定了“Cloud Platform for AWS”操作环境,您仅可以在Amazon Web Services 环境中部署订单上所列之产品,因技术要求必须被部署在其他操作环境中的产品除外。 如果订单上指定了“Cloud Platform for Azure”操作环境,则您仅可以在 Microsoft Azure 环境中部署订单上所列之产品,因技术要求必须被部署在其他操作环境中的产品除外。

  • Measurement method An isolation resistance test instrument is connected between the live parts and the electrical chassis. The isolation resistance is subsequently measured by applying a DC voltage at least half of the working voltage of the high voltage bus. If the system has several voltage ranges (e.g. because of boost converter) in conductively connected circuit and some of the components cannot withstand the working voltage of the entire circuit, the isolation resistance between those components and the electrical chassis can be measured separately by applying at least half of their own working voltage with those components disconnected.

  • Voting Method Unless otherwise provided by law, when a vote is taken upon any measure before the Board, with a quorum being present, a majority of the votes cast shall determine its outcome. A vote of "abstain" or "present," or a vote other than "yea" or "nay," or a failure to vote, is counted for the purposes of determining whether a quorum is present. A vote of "abstain" or "present," or a vote other than "yea" or "nay," or a failure to vote, however, is not counted in determining whether a measure has been passed by the Board, unless otherwise stated in law. The sequence for casting votes is rotated. On all questions involving the expenditure of money and on all questions involving the closing of a meeting to the public, a roll call vote shall be taken and entered in the Board's minutes. An individual Board member may request that a roll call vote be taken on any other matter; the President or other presiding officer may approve or deny the request but a denial is subject to being overturned by a majority vote of the members present. Any Board member may request that his or her vote be changed before the President announces the result. Any Board member may include a written explanation of his or her vote in the District file containing individual Board member statements; the explanation will not be part of the minutes. Minutes The Board Secretary shall keep written minutes of all Board meetings (whether open or closed), which shall be signed by the President and the Secretary. The minutes include:

  • Accounting Methods Implement or adopt any material change in its accounting principles, practices or methods, other than as may be required by GAAP or any Governmental Entity.

  • NETWORK INTERCONNECTION METHODS 64.1 This Section sets forth the terms and conditions for Network Interconnection Methods (NIMs) provided between CenturyLink and CLEC for the Interconnection Facilities established between the Parties’ networks. Additionally, this Section describes the physical architecture for the Interconnection of the Parties’ facilities and equipment required for the transmission and routing of Local Traffic, ISP-Bound Traffic, IntraLATA LEC Toll Traffic, VoIP-PSTN Traffic, Transit Traffic and Jointly Provided Switched Access Service Traffic.

  • Payment Methodology The Contractor shall be compensated based on the Service Rates in Attachment for units of service authorized by the Institution in a total amount not to exceed the Contract Maximum Liability established in Section C.1. The Contractor’s compensation shall be contingent upon the satisfactory completion of units of service or project milestones identified in Attachment B. The Contractor shall submit invoices, in form and substance acceptable to the Institution with all of the necessary supporting documentation, prior to any payment. Such invoices shall be submitted for completed units of service or project milestones for the amount stipulated.

Time is Money Join Law Insider Premium to draft better contracts faster.