Walls and siding Sample Clauses

Walls and siding. Repair of or in-kind replacement of wall or siding material, including brick, stone, or stucco materials and wood siding.
AutoNDA by SimpleDocs
Walls and siding. The in-kind repair of exterior masonry walls, or the in-kind replacement of deteriorated siding, stucco, or trim. Vinyl or aluminum siding or deteriorated lap wood siding may be replaced with smooth unbeaded fiber cement siding. Deteriorated novelty wood siding must be repaired or replaced in-kind.
Walls and siding. Repair or limited in-kind replacement of deteriorated wall or siding material such as wood, brick, stone, or stucco, consistent with National Park Service Preservation Brief #47:

Related to Walls and siding

  • Tools and Equipment As established by current practices, the Employer may determine and provide necessary tools, tool allowance, equipment and foul weather gear. The Employer will repair or replace employer-provided tools and equipment if damaged or worn out beyond usefulness in the normal course of business. Employees are accountable for equipment and/or tools assigned to them and will maintain them in a clean and serviceable condition.

  • Fences Except for establishment cost incurred by the United States and replacement cost not due to the Landowner’s negligence or malfeasance, all other costs involved in maintenance of fences and similar facilities to exclude livestock are the responsibility of the Landowner. The installation or use of fences which have the effect of preventing wildlife access and use of the Easement Area are prohibited on the Easement Area, easement boundary, or on the Landowner’s land that is immediately adjacent to, and functionally related to, the Easement Area.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Alpine Areas As of 1 October 2020 the Employer shall pay an Alpine disability allowance of $3.85 worked on Projects in alpine areas. These allowances will be adjusted annually in accordance with CPI (All Groups, Melbourne) movements measured in the twelve month period ending the previous December quarter effective as of 1 March 2021, rounded to the nearest 5 cents.

  • Porcupine Site Highway 11 and the City of Timmins Thunder Bay and District Toronto/York-Peel

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • Exterior and interior functional areas and spaces of the Project, with technical and equipment requirements on each;

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Materials and Equipment ‌ Material means property that may be consumed or expended during performance, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end item. Equipment means a tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for performance. Materials and Equipment shall be priced in accordance with the terms of the task order award, contract type, and applicable FAR and agency-specific regulatory supplements. Unless otherwise directed by task order terms and conditions, the Contractor may apply indirect costs to materials and equipment consistent with the Contractor’s usual accounting practices.

  • Toilet Facilities The Employer provides the Contractor access to toilet facilities. Temporary chemical toilets are provided by the Contractor where deemed necessary.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!