Wind Generation Meteorological Station Requirements Sample Clauses

Wind Generation Meteorological Station Requirements. Each wind Eligible Intermittent Resource shall locate its meteorological station(s) on the windward side of the wind farm. Each wind Eligible Intermittent Resource must install one meteorological station at the average hub height of the wind turbines. The second meteorological station, if any, may be co-located on the primary meteorological station and installed approximately 30 meters below the average hub height. Hub height is the distance from the ground to the center of the turbine axis. If a second meteorological station is required, then it may be so co-located with the primary The ISO is proposing to modify the reference to having the second meteorological station 30 meters below the second station because not every wind turbine is 30 meters tall and this would be inapplicable to some wind turbines. Section Proposed Revisions Reason for Change station, then the second station shall be installed below the primary station. The approximate distance separating the primary station and secondary station shall be an average of one rotator blade length. Where placement of the meteorological station(s) in accordance with this Eligible Intermittent Resource Protocol would reduce production or violate a local, state, or federal statute, regulation or ordinance, the CAISO, in coordination with any applicable forecast service provider, will coordinate with the Eligible Intermittent Resource to identify an acceptable placement of the meteorological station.
AutoNDA by SimpleDocs

Related to Wind Generation Meteorological Station Requirements

  • Meteorological Data Reporting Requirement (Applicable to wind generation facilities only)

  • Food Service Waste Reduction Requirements Contractor shall comply with the Food Service Waste Reduction Ordinance, as set forth in San Francisco Environment Code Chapter 16, including but not limited to the remedies for noncompliance provided therein.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Xxxx has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Xxxx. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Xxxx (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Xxxx, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Xxxx will then have the option of paying the one-time SC rates to place the Loop.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • Contracting Information Requirements Contractor represents and warrants that it will comply with the requirements of Section 552.372(a) of the Texas Government Code. Except as provided by Section 552.374(c) of the Texas Government Code, the requirements of Subchapter J (Additional Provisions Related to Contracting Information), Chapter 552 of the Government Code, may apply to the Contract and the Contractor agrees that the Contract can be terminated if the Contractor knowingly or intentionally fails to comply with a requirement of that subchapter.

  • Installation requirements We (if we install the System) or our contractor (if we procure a contractor to install the System) must:

  • Training Requirements Grantee shall: A. Authorize and require staff (including volunteers) to attend training, conferences, and meetings as directed by DSHS; B. Appropriately budget funds in order to meet training requirements in a timely manner, and ensure that staff and volunteers are trained as specified in the training requirements listed at xxxxx://xxx.xxxx.xxxxx.xxx/hivstd/training/ and as otherwise specified by DSHS. Grantee shall document that these training requirements are met; and C. Ensure that staff hired for HIV and syphilis testing are trained to perform blood draws within three (3) months of employment.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • Trunking Requirements The Parties will provide designed Interconnection facilities that meet the same technical criteria and service standards, such as probability of blocking in peak hours and transmission standards, in accordance with current industry standards.