WORKMANSHIP AND MATERIALS. 1.10.1 Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Order. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment. 1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work. 1.10.3 The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price. 1.10.4 Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building. 1.10.5 Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.
Appears in 75 contracts
Samples: Contract for Services, Contract for Services, Contract for Services
WORKMANSHIP AND MATERIALS. 1.10.1 Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Orderthis RFP. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.
Appears in 59 contracts
Samples: Contract for Services, Contract # 37789, Contract # 37789
WORKMANSHIP AND MATERIALS. 1.10.1 1.11.1. Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and scheduleStatement of Work. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Orderthis contract. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 1.11.2. All work performed under this contract shall be completed in accordance with local, state, state and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 1.11.3. The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 1.11.4. Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 1.11.5. Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the BGS Project Manager.
1.11.6. Chemicals used during this contract may only be applied by personnel that are certified by the State of Vermont Agency of Agriculture. Chemical use must also be approved by the project manager.
1.11.6.1. Contractor shall post MSDS sheets and follow BGS Administrative Policy 0004 – Pesticide Application Protocol.
Appears in 25 contracts
Samples: Contract Amendment, Contract Amendment, Contract #33962
WORKMANSHIP AND MATERIALS. 1.10.1 Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Order. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.
1.10.6 It is the contractor’s responsibility to contact Dig-Safe prior to beginning any excavation work. For private complexes, such as prisons, the contractor will need to contact a private underground utility locator prior to beginning work.
Appears in 17 contracts
Samples: Contract for Services, Contract for Services, Contract for Services
WORKMANSHIP AND MATERIALS. 1.10.1 1.10.1. Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and scheduleStatement of Work. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Orderthis contract. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 1.10.2. The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 1.10.3. Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 1.10.4. Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the BGS Project Manager.
Appears in 14 contracts
Samples: Contract Amendment, Contract Amendment, Contract Amendment
WORKMANSHIP AND MATERIALS. 1.10.1 1.11.1. Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and scheduleStatement of Work. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Orderthis contract. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 1.11.2. The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 1.11.3. Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 1.11.4. Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.
Appears in 14 contracts
Samples: Contract Amendment, Contract Amendment, Contract Amendment
WORKMANSHIP AND MATERIALS. 1.10.1 Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Orderthis Contract. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.
Appears in 11 contracts
Samples: Contract # 38131, Contract # 38155, Contract # 38171
WORKMANSHIP AND MATERIALS. 1.10.1 Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Orderthis Contract. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.
1.10.6 It is the contractor’s responsibility to contact Dig-Safe prior to beginning any excavation work. For private complexes, such as prisons, the contractor will need to contact a private underground utility locator prior to beginning work.
Appears in 8 contracts
Samples: Contract Amendment, Contract, Contract Amendment
WORKMANSHIP AND MATERIALS. 1.10.1 1.11.1. Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and scheduleStatement of Work. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Orderthis contract. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 1.11.2. All work performed under this contract shall be completed in accordance with local, state, state and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 1.11.3. The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 1.11.4. Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 1.11.5. Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the BGS Project Manager.
Appears in 6 contracts
Samples: Contract #33985, Contract Amendment, Contract for Services
WORKMANSHIP AND MATERIALS. 1.10.1 1.10.1. Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and scheduleStatement of Work. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Orderthis RFP. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 1.10.2. The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 1.10.3. Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 1.10.4. Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the BGS Project Manager.
Appears in 4 contracts
Samples: Contract Amendment, Contract Amendment, Contract Amendment
WORKMANSHIP AND MATERIALS. 1.10.1 2.18.1. Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project ManagerPurchaser’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Order. Contractor shall ensure that any equipment considered by the Project Manager State to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 2.18.2. All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 2.18.3. The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 2.18.4. Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 2.18.5. Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project ManagerState.
2.18.6. It is the contractor’s responsibility to contact Dig-Safe prior to beginning any excavation work. For private complexes, such as prisons, the contractor will need to contact a private underground utility locator prior to beginning work.
Appears in 2 contracts
Samples: Contract Amendment, Contract Amendment
WORKMANSHIP AND MATERIALS. 1.10.1 Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or and any associating associated Purchase Order. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.
Appears in 1 contract
Samples: Contract Amendment
WORKMANSHIP AND MATERIALS. 1.10.1 Contractor shall furnish all supervision, labor, transportation, materials, tools tools, and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Order. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.
Appears in 1 contract
Samples: Contract for Services
WORKMANSHIP AND MATERIALS. 1.10.1 Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating issued Purchase Order. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.