WORKMANSHIP AND MATERIALS. 1.10.1 Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Order. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment. 1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work. 1.10.3 The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price. 1.10.4 Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building. 1.10.5 Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.
Appears in 62 contracts
Samples: Contract for Services, Contract for Services, Contract for Services
WORKMANSHIP AND MATERIALS. 1.10.1 Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Orderthis RFP. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.
Appears in 54 contracts
Samples: Contract for Services, Contract Amendment, Contract # 37780
WORKMANSHIP AND MATERIALS. 1.10.1 1.11.1. Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and scheduleStatement of Work. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Orderthis contract. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 1.11.2. All work performed under this contract shall be completed in accordance with local, state, state and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 1.11.3. The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 1.11.4. Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 1.11.5. Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the BGS Project Manager.
1.11.6. Chemicals used during this contract may only be applied by personnel that are certified by the State of Vermont Agency of Agriculture. Chemical use must also be approved by the project manager.
1.11.6.1. Contractor shall post MSDS sheets and follow BGS Administrative Policy 0004 – Pesticide Application Protocol.
Appears in 24 contracts
Samples: Contract Amendment, Contract #33962, Contract Amendment
WORKMANSHIP AND MATERIALS. 1.10.1 Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Order. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.
1.10.6 It is the contractor’s responsibility to contact Dig-Safe prior to beginning any excavation work. For private complexes, such as prisons, the contractor will need to contact a private underground utility locator prior to beginning work.
Appears in 14 contracts
Samples: Contract for Services, Contract for Services, Contract for Services
WORKMANSHIP AND MATERIALS. 1.10.1 1.11.1. Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and scheduleStatement of Work. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Orderthis contract. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 1.11.2. The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 1.11.3. Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 1.11.4. Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.
Appears in 14 contracts
Samples: Contract Amendment, Contract Amendment, Contract Amendment
WORKMANSHIP AND MATERIALS. 1.10.1 1.10.1. Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and scheduleStatement of Work. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Orderthis contract. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 1.10.2. The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 1.10.3. Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 1.10.4. Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the BGS Project Manager.
Appears in 13 contracts
Samples: Contract Amendment, Contract Amendment, Contract Amendment
WORKMANSHIP AND MATERIALS. 1.10.1 Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Orderthis Contract. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.
Appears in 11 contracts
Samples: Contract # 38171, Contract Amendment, Contract Amendment
WORKMANSHIP AND MATERIALS. 1.10.1 Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Orderthis Contract. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.
1.10.6 It is the contractor’s responsibility to contact Dig-Safe prior to beginning any excavation work. For private complexes, such as prisons, the contractor will need to contact a private underground utility locator prior to beginning work.
Appears in 7 contracts
Samples: Contract Amendment, Contract Amendment, Contract Amendment
WORKMANSHIP AND MATERIALS. 1.10.1 2.14.1. Contractor shall agrees to furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and scheduleservice. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase OrderScope of Work for each project. Contractor shall ensure that any equipment Equipment considered by the Project Manager to be improper or inadequate for this purpose is shall be removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 2.14.2. The Contractor guarantees guarantees, even though not specifically described in this Contract or otherwise, that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will shall be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational operating as contemplated by the above description Scope of Work for the project, even if those systems project and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 Contractor shall ensure that all 2.14.3. All supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all All dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each buildingwork.
1.10.5 Contractor 2.14.4. The contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and inviteesthe contractor. Contractor acknowledges that the determination Determination of the need for, and extent of, any repair work shall be made is at the sole discretion of the BGS Project Manager.
2.14.5. All materials, equipment, sizes, capacities and installation of electrical work shall conform to the latest requirements of the National Electrical Code, National Electrical Safety Code, the National Electrical Manufacturers Association, the board of Fire Underwriters, the Underwriter's Laboratories, Inc., the Institute of Electrical and Electronics Engineers, the prevailing State and Local Electrical Codes and TIA/EIA 568 Telecommunications standard.
2.14.6. Contractor shall secure and pay for all permits and inspections required by any of the foregoing authorities. The electrical inspection shall be made and approved by the State and/or Local authority having jurisdiction. Copies of any permits obtain by the Contractor shall be submitted to the BGS Maintenance District Facility Manager before starting any work and copies of the final inspection before final payment is made.
2.14.7. All electrical work shall be performed by duly licensed electricians who are qualified to do such work, and who are normally engaged in this type of work and of sufficient number to perform the required services efficiently and in a manner satisfactory to the Contract Coordinate or. Because of the complexity of the electrical work, unskilled labor is not permitted.
2.14.8. Contractor shall provide labeling, As-Built drawings and updated panel schedules to the ADS Telecommunications Section, BGS Security Division and BGS Maintenance District Facility Manager before final payment is made.
2.14.9. Contractor shall obtain prior written approval from the contract coordinator for Subcontractors before Subcontractors can perform duties as part of the contract.
Appears in 6 contracts
Samples: Service Agreement, Service Agreement, Service Agreement
WORKMANSHIP AND MATERIALS. 1.10.1 1.11.1. Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and scheduleStatement of Work. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Orderthis contract. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 1.11.2. All work performed under this contract shall be completed in accordance with local, state, state and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 1.11.3. The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 1.11.4. Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 1.11.5. Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the BGS Project Manager.
Appears in 6 contracts
Samples: Contract Amendment, Contract #33985, Contract for Services
WORKMANSHIP AND MATERIALS. 1.10.1 1.10.1. Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and scheduleStatement of Work. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Orderthis RFP. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 1.10.2. The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 1.10.3. Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 1.10.4. Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the BGS Project Manager.
Appears in 4 contracts
Samples: Contract Amendment, Contract Amendment, Contract Amendment
WORKMANSHIP AND MATERIALS. 1.10.1 2.18.1. Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project ManagerPurchaser’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Order. Contractor shall ensure that any equipment considered by the Project Manager State to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 2.18.2. All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 2.18.3. The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 2.18.4. Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 2.18.5. Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project ManagerState.
2.18.6. It is the contractor’s responsibility to contact Dig-Safe prior to beginning any excavation work. For private complexes, such as prisons, the contractor will need to contact a private underground utility locator prior to beginning work.
Appears in 2 contracts
Samples: Contract Amendment, Contract Amendment
WORKMANSHIP AND MATERIALS. 1.10.1 Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or and any associating associated Purchase Order. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.
Appears in 1 contract
Samples: Contract Amendment
WORKMANSHIP AND MATERIALS. 1.10.1 Contractor shall furnish all supervision, labor, transportation, materials, tools tools, and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating Purchase Order. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.
Appears in 1 contract
Samples: Contract for Services
WORKMANSHIP AND MATERIALS. 1.10.1 Contractor shall furnish all supervision, labor, transportation, materials, tools and equipment necessary to satisfactorily complete the service in a manner consistent with the Project Manager’s plan and schedule. Contractor’s equipment shall be of the size and type appropriate for completing the various types of work described in the contract or any associating issued Purchase Order. Contractor shall ensure that any equipment considered by the Project Manager to be improper or inadequate for this purpose is removed from the site and replaced with satisfactory equipment.
1.10.2 All work performed under this contract shall be completed in accordance with local, state, and national codes and standards, and other recognized industry standards associated with the work.
1.10.3 The Contractor guarantees that all materials shall be of the best quality, that all work shall be done in a professional manner, and that all aspects of the project will be delivered in good working order, complete and perfect in every respect, and that all systems and materials necessary to make the project completely operational as contemplated by the above description of the project, even if those systems and materials are not specifically described in this Contract, shall be included in the contract price.
1.10.4 Contractor shall ensure that all supplies, equipment and machines shall be kept free of traffic lanes or other areas that may be hazardous. Contractor shall further ensure that all dirt and debris resulting from the work under this contract shall be disposed of at the end of each day or at the completion of work in each building.
1.10.5 Contractor shall, at no additional cost to the State, repair furnishings, equipment, facilities or other property of the State damaged by Contractor, its officers, employees, agents, contractors, subcontractors and invitees. Contractor acknowledges that the determination of the need for, and extent of, any repair work shall be made at the sole discretion of the Project Manager.
Appears in 1 contract
Samples: Contract # 37820