Xxxxx Emissions Sample Clauses

Xxxxx Emissions. 1. P03, Stack S03 - 2 Lithographic Presses with One Natural Gas/Propane Drying Oven Rated at 1.25 mmBtu/hr - Installed 1991 (PLO-05-H and PLO-07-H) Pollutant Maximum Theoretical Potential to Emit Maximum Allowables lbs/hr TPY lbs/hr TPY lbs/hr TPY Particulate matter emissions 0.0095 0.042 0.0095 0.042 0.19 0.82 Sulfur Dioxide 0.00075 0.0033 0.00075 0.0033 0.00075 0.0033 Nitrogen oxides 0.26 1.13 0.26 1.13 0.26 1.13 Carbon Monoxide 0.11 0.46 0.11 0.46 0.11 0.46 VOCs 1.84 8.06 0.94 # 1.84 8.06
AutoNDA by SimpleDocs

Related to Xxxxx Emissions

  • Product Safety Seller must maintain the state of the product so that it is able to perform to its designed or intended purpose without causing unacceptable risk of harm to a person or damage to property.

  • Xxxxxx and Recall An employee in receipt of notice of layoff pursuant to 9.08(A)(a)(ii) may:

  • REGULATORY FILINGS AND CAISO TARIFF COMPLIANCE 3.1 Filing

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.

  • Grievance on Layoffs and Recalls Grievances concerning layoffs and recalls shall be initiated at Step 2 of the grievance procedure.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Specific Order Processes and Requirements 1. Distributor will order Software from SAP using and filling out completely such forms and minimum order requirements as SAP may prescribe from time to time and must comply with any then-current order process for the specific Software product. Where applicable, Distributor agrees to use the electronic means provided by SAP for placing orders.

  • Access to Network Interface Device (NID 2.4.3.1. Due to the wide variety of NIDs utilized by BellSouth (based on subscriber size and environmental considerations), Mpower may access the on-premises wiring by any of the following means: BellSouth shall allow Mpower to connect its loops directly to BellSouth’s multi-line residential NID enclosures that have additional space and are not used by BellSouth or any other telecommunications carriers to provide service to the premise. Mpower agrees to install compatible protectors and test jacks and to maintain the protection system and equipment and to indemnify BellSouth pursuant to Section 8 of the General Terms and Conditions of this Agreement.

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

Time is Money Join Law Insider Premium to draft better contracts faster.