拒绝专利索赔或补偿的权利 Sample Clauses

拒绝专利索赔或补偿的权利. 12.2 Rights to reject the claims for patent compensation 无论投标人是否中标,均不得以专利权、商标权或工业设计权等知识产权为由向招标人提出任何索赔或补偿的要求。 Regardless of winning or losing, the competitors shall not make any claim to the client for intellectual property such as patent right, trademark right or industrial design right.
AutoNDA by SimpleDocs

Related to 拒绝专利索赔或补偿的权利

  • Water Supply The system may or may not meet state and local requirements. It is the right and responsibility of Buyer to determine the compliance of the system with state and local requirements. [For additional information on this subject, request the “Water Supply and Waste Disposal Notification” form.]

  • Renewable Energy Credits 5.01. Customer shall offer PMPA and/or Utility a first right of refusal before selling or granting to any third party the right to the Green Attributes associated with its customer-owned renewable generation that is interconnected to Utility’s electric distribution system. The term Green Attributes shall include any and all credits, certificates, benefits, environmental attributes, emissions reductions, offsets, and allowances, however entitled, attributable to the generation of electricity from the customer owned-renewable generation and its displacement of conventional energy generation.

  • Power Supply The source of power for the VAS shall either be the vehicle battery or a rechargeable battery. Where provided, an additional rechargeable or non-rechargeable battery may be used. These batteries shall by no means supply energy to other parts of the vehicle electrical system.

  • Energy 1. Cooperation shall take place within the principles of the market economy and the European Energy Charter, against a background of the progressive integration of the energy markets in Europe.

  • Air and Water Subrecipient agrees to comply with the following regulations in so far as they apply to the performance of this Contract: Clean Air Act, 42 U.S.C., 1857, et seq. Federal Water Pollution Control Act, as amended, 33 U.S.C. 1251, et seq. Environmental Protection Agency (EPA) regulations pursuant to 00 XXX 00 xxx 00 XXX 00.

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Electrical Power CUSTOMER acknowledges that the Services will not function in the absence of electrical power.

  • POWER SURGE PROTECTION This Agreement provides power surge protection from the product date of purchase of the Covered Product in the absence of insurance coverage. If the Covered Product is damaged as a result of a power surge, We will replace the Covered Product in accordance with the terms herein. You may be required to submit proof of claim denial from Your insurer, if applicable.

  • Mentor the role of the mentor is to provide support, encouragement and information to the trainee on the life and experience relative to the enterprise (culture of the enterprise, informal codes and conducts, etc.). Normally, the mentor should be a different person than the supervisor.

Time is Money Join Law Insider Premium to draft better contracts faster.