Attachments. General tender conditions (valid from April 16, 2024) Attachment No. 1 Contract template Attachment No. 2
1 Time required to withdrawn 100 % of the working gas volume with a given maximum withdrawal capacity.
2 Time required to inject 90/100 % of the working gas volume with a given maximum injection capacity.
Attachments. General tender conditions (valid from July 1, 2024) Attachment No. 1
Attachments. 1.1 Attachment no. 1 – Basic characteristics of reference engine models Category Sub-category Unit Reference engine
1.2 Attachment no. 2 – Core test cell - table of basic requirements Site Consideration Facility / Equipment Specification Requirement / Values Assumptions / Comments
Attachments. General tender conditions (valid from July 1, 2024)
1 Time required to withdrawn 100 % of the working gas volume with a given maximum withdrawal capacity.
2 Time required to inject 90/100 % of the working gas volume with a given maximum injection capacity.
Attachments. Příloha č. 1: Ubytovací řád
Attachments. Status and the Rules of Procedure of the Council of the National Center of Competence for Geotechnologies Using Artificial Intelligence
Attachments č. 1: Ubytovací řád, č. 2: Závěrečné vyúčtování