Acceptance Test Capacity Guarantee definition

Acceptance Test Capacity Guarantee shall have the meaning assigned to it in Section 11.3.
Acceptance Test Capacity Guarantee shall have the meaning assigned to it in Section 11.3. “Acceptance Testing Period” shall have the meaning set forth in Section 11.2.3.
Acceptance Test Capacity Guarantee. Contractor and the Testing Engineer shall be entitled to conduct and verify satisfaction of the Acceptance Tests in stages and in such order as may be appropriate given the available testing conditions. In the event that the Facility fails to meet the Acceptance Test Capacity Guarantee, the following shall apply:

Examples of Acceptance Test Capacity Guarantee in a sentence

  • The Acceptance Tests for the Work and the consequences for the Work falling short of the Acceptance Test Capacity Guarantee standards are set forth in Article 11 and Schedule III.

  • The Acceptance Tests for the Work and the consequences for the Work falling short of the Acceptance Test Capacity Guarantee standards are set forth in Article 10 and Schedule III.

  • The information in question should always be given to the media in such a way as to promote publication by them as promptly as possible, i.e. by telephone, or in writing by hand delivery, facsimile or email, in both cases on an "immediate release" basis.

Related to Acceptance Test Capacity Guarantee

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Acceptance Test Document means a document, which defines procedures for testing the functioning of installed system. The document will be finalized with the contractor within 7 days of issuance of the Letter of Award.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Guaranteed Substantial Completion Date or “Guaranteed Substantial Completion Dates” has the meaning set forth in Section 5.3B.

  • TENDER SPECIFICATION means “Specific conditions, technical specifications, appendices, site information and drawing pertaining to the work in which the tenderers are required to submit their offer. Individual specification number will be assigned to each tender specification.

  • Completion of Services means..................................................

  • Guarantee Test(s means the test(s) specified in the Procuring Entity's Requirements to be carried out to ascertain whether the Facilities or a specified part thereof is able to attain the Functional Guarantees specified in the Appendix to the Contract Agreement titled Functional Guarantees, in accordance with the provisions of GCC Sub-Clause25.2 (Guarantee Test) hereof.

  • technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;

  • Performance Guarantee means the security to be provided by the Contractor in accordance with Sub Clause 10.1 for the due performance of the Contract.

  • Test Plan means a plan for the Testing of the or Deliverables and other agreed criteria related to the achievement of Milestones as described further in paragraph 4 of Call Off Schedule 4;

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • TENDER SPECIFICATIONS means the Scope of Work, Special Instructions / Conditions, Technical specifications/requirement , Appendices, Site Information and drawings pertaining to the work and any other relevant reference in the Tender Document for which the Bidder are required to submit their offer.

  • Performance and Guarantee Tests , shall mean all operational checks and tests required to determine and demonstrate capacity, efficiency, and operating characteristics as specified in the Contract Documents.

  • Root Cause Analysis means a method of problem solving designed to identify the underlying causes of a problem. The focus of a root cause analysis is on systems, processes, and outcomes that require change to reduce the risk of harm.

  • Final Acceptance means final written acceptance of all the Work by the Commissioner, a copy of which shall be sent to the Contractor.

  • Performance and Guarantee Test means all operational checks and tests required to determine and demonstrate capacity, efficiency and operating characteristics as specified in the Contract Documents.

  • Technical Specifications A specification in a document defining the characteristics of a product or a service, such as the quality levels, the environmental and climate performance levels, the design for all needs, including accessibility for people with disabilities, and the evaluation of conformity, of product performance, of the use of the product, safety or dimensions, as well as requirements applicable to the product as regards the name by which it is sold, terminology, symbols, testing and test methods, packaging, marking or labelling, instructions for use, the production processes and methods at every stage in the life cycle of the supply or service, as well as the evaluation and conformity procedures;

  • Scope of Work means the description of Services and Deliverables specified in the Contract and as may be amended.

  • Guaranteed Commercial Operation Date has the meaning set forth in Section 3.9(c)(i).

  • health and safety specification means a site, activity or project specific document prepared by the client pertaining to all health and safety requirements related to construction work;

  • Contract Specifications means the principal trading terms in CFD (for example Spread, Swaps, Lot Size, Initial Margin, Necessary Margin, Hedged Margin, the minimum level for placing Stop Loss, Take Profit and Limit Orders, financing charges, charges etc) for each type of CFD as determined by the Company from time to time. The Contract Specifications appear on the Website.