Flow rate means the rate at which water flows through pipes, valves and emission devices, measured in gallons per minute, gallons per hour, or cubic feet per second.
Peak flow rate means the maximum instantaneous flow from a given storm condition at a particular location.
Actual/360 means that interest is calculated on the basis of the actual number of days elapsed in a year of 360 days.
Actual/360 Basis The accrual of interest on the basis of the actual number of days elapsed during any relevant accrual period in a year assumed to consist of 360 days.
Average Monthly Limit means the maximum allowable "Average Monthly Concentration" as defined in Section 22a-430-3(a) of the RCSA when expressed as a concentration (e.g. mg/l); otherwise, it means "Average Monthly Discharge Limitation" as defined in Section 22a-430-3(a) of the RCSA.
Actual/365 (Fixed) means that interest or any other relevant accrual factor shall be calculated on the basis of the actual number of days elapsed in a year of 365 days, regardless of whether accrual or payment occurs during a calendar leap year.
Load Factor means the percentage of aircraft seats actually occupied on a flight (RPMs divided by ASMs). “NMB” means the National Mediation Board.
Three-Month LIBOR Rate means the rate determined in accordance with the following provisions:
Three-Month LIBOR means the rate (expressed as a percentage per annum) for deposits in United States dollars for a three-month period commencing on the first day of a Dividend Period that appears on the Reuters Screen LIBOR01 Page as of 11:00 a.m. (London time) on the LIBOR Determination Date for that Dividend Period. If such rate does not appear on Reuters Screen LIBOR01 Page, Three-month LIBOR will be determined on the basis of the rates at which deposits in United States dollars for a three-month period commencing on the first day of that Dividend Period and in a principal amount of not less than $1 million are offered to prime banks in the London interbank market by four major banks in the London interbank market selected by the Calculation Agent (after consultation with the Company), at approximately 11:00 a.m., London time, on the LIBOR Determination Date for that Dividend Period. The Calculation Agent will request the principal London office of each of such banks to provide a quotation of its rate. If at least two such quotations are provided, Three-month LIBOR with respect to that Dividend Period will be the arithmetic mean (rounded upward if necessary to the nearest whole multiple of 0.00001%) of such quotations. If fewer than two quotations are provided, Three-month LIBOR with respect to that Dividend Period will be the arithmetic mean (rounded upward if necessary to the nearest whole multiple of 0.00001%) of the rates quoted by three major banks in New York City selected by the Calculation Agent (after consultation with the Company), at approximately 11:00 a.m., New York City time, on the LIBOR Determination Date for that Dividend Period for loans in United States dollars to leading European banks for a three-month period commencing on the first day of that Dividend Period and in a principal amount of not less than $1 million. However, if fewer than three banks selected by the Calculation Agent to provide quotations are quoting as described above, Three-month LIBOR for that Dividend Period will be the same Three-month LIBOR as determined for the previous Dividend Period or, in the case of the Dividend Period beginning on April 30, 2018, 2.920%. The determination of Three-month LIBOR for each relevant Dividend Period by the Calculation Agent will (in the absence of manifest error) be final and binding.
Capacity Utilization Factor or “CUF” shall have the same meaning as provided in CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009 as amended from time to time; However, for avoidance of any doubt, it is clarified that the CUF shall be calculated on the Contracted Capacity; In any Contract Year, if ‘X’ MWh of energy has been metered out at the Delivery Point for ‘Y’ MW Project capacity, CUF= (X MWh/(Y MW*8766)) X100%; Declared CUF for this Project shall be % (to be revised as applicable).
Actual Uptime means, of the Total Operation Hours, the aggregate number of hours in any month during which each equipment is actually available for use.
Actual Value means the greenhouse gas emissions savings for some or all of the steps of a specific biofuel, bioliquid or biomass fuel production process, calculated in accordance with the methodology laid down in Part C of Annex V or Part B of Annex VI;