Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.
Training program means an NCA-approved Iowa college, the Iowa law enforcement academy or an Iowa hospital approved by the department to conduct emergency medical care training.
Sedimentation means a process for removal of solids before filtration by gravity or separation.
Implementation Services has the meaning set forth in Section 2.1.
service delivery and budget implementation plan means a detailed plan approved by the mayor of a municipality in terms of section 53(1) (c) (ii) for implementing the municipality’s delivery of municipal services and its annual budget.
Management Plan means a plan to manage the activities and protect the special value or values in an Antarctic Specially Protected Area or an Antarctic Specially Managed Area.
Prescription monitoring program “PMP,” or “program” means the program established pursuant to 657—Chapter 37 for the collection and maintenance of PMP information and for the provision of PMP information to authorized individuals.
Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.
Radiation therapy simulation system means a radiographic or fluoroscopic x-ray system intended for localizing the volume to be exposed during radiation therapy and confirming the position and size of the therapeutic irradiation field.
New jobs training program or “program” means the project or projects established by a community college for the creation of jobs by providing education and training of workers for new jobs for new or expanding industry in the merged area served by the community college. The proceeds of the certificates, as authorized by the Act, shall be used only to fund program services related to training programs made necessary by the creation of new jobs.
Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;
Project Implementation Unit or “PIU” means the unit referred to in Section I.A.1 of Schedule 2 to this Agreement.
Project Implementation Plan means the detail plan submitted by the Developer with regard to development of Project Facilities and its operation and management thereof in accordance with this Agreement and to be appended as Schedule 9 to this Agreement.
Production System means a live SAP system used for running Licensee’s internal business operations and where Licensee’s data is recorded.
Irrigation efficiency (IE) means the measurement of the amount of water beneficially used divided by the amount of water applied. Irrigation efficiency is derived from measurements and estimates of irrigation system characteristics and management practices. The irrigation efficiency for purposes of this ordinance are 0.75 for overhead spray devices and 0.81 for drip systems.
Quality Assurance Program means the overall quality program and associated activities including the Department’s Quality Assurance, Design-Builder Quality Control, the Contract’s quality requirements for design and construction to assure compliance with Department Specifications and procedures.
Stormwater management system means any equipment, plants,
Base Load Generation Resource means a Generation Capacity Resource that operates at least 90 percent of the hours that it is available to operate, as determined by the Office of the Interconnection in accordance with the PJM Manuals.
Centralized Message Distribution System (CMDS) means the industry-wide data collection system, which handles the daily exchange of message details between CMDS participating telephone companies (also known as CMDS Direct Participants). AT&T-21STATE is a CMDS Direct Participant.
Hot water means water at a temperature of 110°F. or higher.
Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.
Fresh water means water, such as tap water, that has not been previously used in a process operation or, if the water has been recycled from a process operation, it has been treated and meets the effluent guidelines for chromium wastewater.
Connectivity means the provision of a Permanent Separated Bicycle Lane system that reflects desired routes between all major origins and destinations in the city.
Auxiliary Water Supply means any water supply on or available to the premises other than the water purveyor's approved public water supply such as, but not limited to, a private well, pond or river.
Infrastructure means infrastructure serving the County and improved or unimproved real estate and personal property, including machinery and equipment, used in the operation of the Project, within the meaning of Section 4-29-68 of the Code.
Implementation Plan means the schedule included in the Statement of Work setting forth the sequence of events for the performance of Services under the Statement of Work, including the Milestones and Milestone Dates.