CC4 definition
Examples of CC4 in a sentence
CC1: Sustainable development – states that the physical and natural environment of the south east is conserved and enhanced CC4 Sustainable Design and Construction CC6: Sustainable Communities and Character of the environment – requires new development to respect the character and distinctiveness of landscapes and use innovative design to create a sense of place.
Policy CC4 of the Local Plan (Part 1) 2018 states that in order to reduce the overall and local risk of flooding, development must be located, designed and laid out to ensure that it is safe; that the risk from flooding is minimised whilst not increasing flood risk elsewhere and that residual risks are safely managed.
CC.4 PROCEDURECC.4.1 The CUSC contains certain provisions relating to the procedure for connection to the National Electricity Transmission System or, in the case of Embedded Power Stations or Embedded DC Converter Stations, becoming operational and includes provisions relating to certain conditions to be complied with by Users prior to and during the course of NGET notifying the User that it has the right to become operational.
Goal CC-4: Identify and preserve Napa County’s irreplaceable cultural and historic resources for present and future generations to appreciate and enjoy.
CC.4 TRANSMISSION STATION COMPOUND CC.4.1 The User shall provide a Transmission Station compound, as provided for in the Connection Agreement, immediately adjacent to the User's facility and otherwise acceptable to the TSO for the erection of a Transmission Station, as necessary, for the TSO and for installing other equipment required for connecting the User's System to the Transmission System.
Reason To ensure that the drainage system has been designed to fully accord with the requirements of the National SuDS Technical Standards and to avoid adverse environmental impact upon the community and to accord with Policy CC4 of the Waverley Borough Local Plan (Part 1) 2018 and retained policies D1 and D4 of the Local Plan 2002.
Also, stated in Condition No. CC-4 a Housing Inspection Report, shall be submitted to the Advisory Agency and shall indicate the condition and estimated remaining useful life of the roof, foundation, plumbing, electrical, heating, air conditioning, other mechanical and structural systems.
Reason To ensure the design meets the national Non-Statutory Technical Standards for SuDS and the final drainage design does not increase flood risk on or off site such to accord with Policy CC4 of Local Plan (Part 1) 2018.
South East Plan: CC4 which seeks the design and construction of all new development, and the redevelopment and refurbishment of existing building stock to incorporate sustainable construction standards and techniques.
PAFY = Percent Plant availability factor achieved during the Year CC1, CC2, CC3, CC4, CC5, CC6, CC7, CC8, CC9, CC10, CC11 and CC12 are the Capacity Charges of 1st, 2nd, 3rd, 4th, 5th, 6th, 7th, 8th, 9th, 10th, 11th and 12th months respectively.