Examples of Class I Bikeway in a sentence
Class I Bikeway (Bike Path), new or upgrade improvement from Class II or Class III Bikeway; b.
Class I Bikeway (Bike Path), new or upgrade improvement from Class II or Class III bikeway; b.
Class I Bikeway: A Bike Trail located in a completely separated right-of-way designated by signs and pavement markings for the exclusive use of bicycles with cross flows by the motor vehicles minimized.
Shared-use path" (Class I Bikeway) means a bikeway outside the traveled way and physically separated from motorized vehicular traffic by an open space or barrier and either within the street or highway right-of-way or within an independent alignment.
BICYCLE LANE DEFINITIONS -- CALIFORNIAThe Streets and Highway Code Section 890.410 defines a "Bikeway" as a facility that is provided primarily for bicycle travel.(1) Class I Bikeway (Bike Path).
If not pursuing turnkey public improvements, the development, at a minimum, should not infringe on the City’s future intent to develop the Los Gatos Creek Trail system as a Class I Bikeway (off-street) facility.
Utangulizi: Programu za Kuzuia watoto kupata virusi vya ukimwi (VVU) kutoka kwa mama yao ni ya muhimu sana.
No outdoor canopy located on a parcel adjacent to a public park or Class I Bikeway, can be visible from trails or public access points.
The three types of bikeways included in the code are described below(1) The Class I Bikeway (Bike Path) provides a completely separated right of way for the exclusive use of bicycles and pedestrians with crossflow by motorists minimized.Generally, bike paths should be used to serve corridors not served by streets and highways or where wide right of way exists, permitting such facilities to be constructed away from the influence of parallel streets.
Class I Bikeway Surfacing:4-inch commercial concreteBase:2-inch crushed surfacing top course Alternate: Surfacing: 2 1/2 inch Commercial Hot Mix Asphalt (HMA)Base:4-inch ballast Alternate: Surfacing: 4-inch pervious concreteBase:4-inch ballast and underdrain system per Standard Drawing 4-9C Pervious concrete materials shall only be used in locations where topography and soil conditions are appropriate.