Construct and test definition

Construct and test means to construct a biomass pilot test facility and associated equipment including a qualified energy generator, and to then conduct appropriate testing in accordance with 9VAC5-520-180 in order to determine the uncontrolled emissions rate from the facility. If the facility is determined to be exempt from all new source review permit programs in accordance with 9VAC5-520-170, the biomass pilot test facility may continue to operate in accordance with the terms and conditions of 9VAC5-520-180 J 2.

Examples of Construct and test in a sentence

  • Construct and test a new test pad when changes in Material occur or different Equipment is used during the construction of the wall backfill.

  • Construct and test all other components of this system according to Section 2523.

  • Construct and test ducts, pipelines, tanks, and other facilities shown on the Contract Drawings and specified herein.

  • Construct and test foundations, structures, tanks, and other facilities shown on the Contract Drawings and specified herein.

  • Assure data security protocols.2. Construct and test required data files.3. Manage data (set data standards, define data elements, document data processes, and identify file specifications).4.

  • Construct and test Half–wave, full-wave, and bridge rectifiers with filter & without filter.

  • Construct and test demonstration scale Hydrothermal Carbonization (HTC) reactor system at Chisago Lakes Waste Treatment plant.

  • Identify defects and do rework of PCB Repairs.4. Construct and test simple electrical control circuits and various electrical protective devices5.

  • Construct and test new light poles LP1, LP2, LP4, LP5, and all associated vaults, raceways and conductors prior to de-energizing any existing light poles.

  • This shrine also houses the church of St. Mary and St. Joseph established by Belgian Capuchins on December 8, 1898.

Related to Construct and test

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • health and safety specification means a site, activity or project specific document prepared by the client pertaining to all health and safety requirements related to construction work;

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Performance and Guarantee Tests , shall mean all operational checks and tests required to determine and demonstrate capacity, efficiency, and operating characteristics as specified in the Contract Documents.

  • Subproject means a development activity proposed by a Beneficiary under Part A.2 (d) of the Project and financed or to be financed through a Subproject Grant (as hereinafter defined) made out of the proceeds of the Development Credit;

  • Construction Works means all works and things necessary to complete the Project in accordance with this Agreement;

  • Construction Work means any work in connection with⎯

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Contractor System means the information and communications technology system used by the Contractor in performing the Services including the Software, the Contractor Equipment and related cabling (but excluding the Authority System).

  • Environmental and Social Standard 8: Cultural Heritage”; (ix) “Environmental and Social Standard 9: Financial Intermediaries”; (x) “Environmental and Social Standard 10: Stakeholder Engagement and Information Disclosure”; effective on October 1, 2018, as published by the Bank.

  • Subprojects means more than one such Subproject.

  • Project Implementation means all steps which the Grantee undertakes in order to deliver the Project which is being supported by funding provided under this Grant Contract. Any reference to UK primary legislation (Acts) or secondary legislation (Statutory Instruments) in this Grant Contract includes reference to any changes to or replacement of those Acts or Statutory Instruments.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Construction waste means solid waste which is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings, and other structures. Construction wastes include, but are not limited to lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, paving materials, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids and garbage are not construction wastes.

  • Performance and Guarantee Test means all operational checks and tests required to determine and demonstrate capacity, efficiency and operating characteristics as specified in the Contract Documents.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Structural components means liners, leachate collection systems, final covers, run-on/run-off systems, and any other component used in the construction and operation of the MSWLF that is necessary for protection of human health and the environment.

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • Structural Engineer means the Engineer appointed or to be appointed from time to time by Promoter for the preparation of the structural design and drawings of the buildings .

  • Web Site Accessibility Standards/Specifications means standards contained in Title 1 Texas Administrative Code Chapter 206.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Web Site Accessibility Standards/Specifications means standards contained in Title 1 Texas Administrative Code Chapter 206.

  • Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;

  • Environmentally critical area means an area or feature which is of significant environmental value, including but not limited to: stream corridors, natural heritage priority sites, habitats of endangered or threatened species, large areas of contiguous open space or upland forest, steep slopes, and well head protection and groundwater recharge areas. Habitats of endangered or threatened species are identified using the Department’s Landscape Project as approved by the Department’s Endangered and Nongame Species Program.