Examples of Dam Height in a sentence
All Dams currently under the Planning or Detailed Design Stages and/or (New & Existing) constructed, owned and under operational control (operated) by NIA shall be classified according to SIZE (Dam Height and/or Reservoir/ Storage Capacity) as basis for proper identification, description and prescription of design and safety evaluation loading criteria and conditions.
Maximum value among Hydraulic Height, Dam Height, and Structural Height.
To explore how many river miles may be gained, click on “Start Prioritizing”, then “Prioritize dams.” Once the map opens, select “State” then begin typing, “Georgia.” Zoom to the area of interest and click, “Select dams in this area.” Once a dam is selected, the tool will provide information on Feasibility & Conservation Benefit, Miles Gained, Dam Height, Threatened & Endangered Species, and more.
Enter the official Dam Height: ft.b. Enter the official Dam Length: ft.c. Enter the official Impoundment Storage volume: acre feet.d. This dam is an (check one): Earth Embankment Dam Concrete Gravity DamNote: earthen dams including concrete or masonry walls are considered Earth Embankment Dams.
Dam Type :Dam Height above Foundation :Combined Dam20.0 m Crest Elevation :EL.
Project Name: Phase PIN: Case #: Design Contact Person: Legal Name of Owner:_ Phone #: ( ) - Owner Contact: Phone #: ( ) - Owner Address: Deed Book Page # or Plat Book Page# for BMP PropertyFor projects with multiple basins, specify which pond this worksheet applies to: Detention provided for: 1-year 2-year 10-year other Dam Height: (feet) Dam Classification: ElevationsBasin bottom elevation ft.
Some major hydro projects running successfully in the Himalayas for the past several decades without any incidence of RIS are Bhakra project (Dam Height: 226m, Reservoir Capacity: 7.55 BCM), Chamera HEP-I (Dam Height: 140m, Reservoir Capacity: 391MCM) Salal HEP-I&II (Dam Height: 118m, Reservoir Capacity: 284MCM) and Teesta V (Dam Height 88.6m, Reservoir Capacity 13.25MCM) and Tehri project (Dam Height: 260.5m, Reservoir Capacity: 3.54 BCM).
Gravity Dam – Max Dam Height = 26.50m, Gravity Dam Length (Including Guide Walls) = 140m Contract Price: USD 567.7 MillionProject Financing: 15% GoU (Upfront) and 85% Loan – China Exim BankContract Duration: 40 MonthsExpected Completion Date: August 201861Main Project Components: The Civil Works of the Hydropower Pro- ject Part mainly consists of Embankment Dam, Spillway, Powerhouse and Switchyard.
Regarding to Hydrological study of FS, the key feature of hydrology of O Kra Nahk is following:▪ River Source : Oukrapak River and Outasao River▪ Total Catchment Area : 60.75 sq.km▪ Target Service Area : 1,100 hectares▪ Annual Mean Rainfall : 1,442 mm/yr▪ Annual Mean Runoff : 0.77 cms = 26.2 mcm/yr▪ Dam Height : 4.65 m – Crest El. 10.65 m▪ Normal Storage Capacity : 3.78 mcm @ El. 9.6 m▪ Design Flood Discharge : 80.6 cms @ 50 yr R.I.
Dam Height: 10 ft; to date, the dam has been constructed to a height of 5 ft.