Examples of Electric Power Costs in a sentence
The Transporter will, in accordance with Section 19, reconcile the Electric Power Cost Estimates with the Actual Electric Power Costs for each Shipper on an annual basis and include a balancing payment in the amount payable by the relevant Shipper in each Annual Statement.
In addition, Operator shall separately identify Actual Transmission Electric Power Costs associated with Cove Point East Buyers as set forth below in Section 27.6. The remaining Actual Transmission Electric Power Costs are attributable to General System Buyers.
PhDr. Mária Kusá, CSc ., e-mail: maria.kusa@uniba.sk https://www.portalvs.sk/regzam/detail/4009Profile subjects: Development of Slovak thought on translation Theory of literary translation doc.
Part VII.44.1 – General Terms & Conditions, Electric Power Costs Adjustment, Purpose (“Section 44.1”).
The number of permits and rights of way required for deploying different types of electronic communications networks or associated facilities and the local character of the deployment could involve applying different procedures and conditions, which can cause difficulties in the network deployment.
In particular, note that the expression t.length() in the body of the setTail method of LenList type checks correctly only because the type of parameter t was declared to be ThisType.
TCO is authorized to make annual filings to revise its EPCA rates to take into account both prospective changes in Electric Power Costs (“Current EPCA Rate”) and unrecovered Electric Power Costs from the preceding twelve-month period (“Unrecovered EPCA Surcharge”).
Operator shall determine each month the actual recovery of Transmission Electric Power Costs by multiplying, as applicable, Operator's actual demand and commodity determinants by the Current Transmission Electric Power rate(s).
Big Sandy will separately adjust the Prospective Electric Power Costs upward or downward if and to the extent that Big Sandy under-recovered or over-recovered Electric Power Costs during the prior 12 month period.
Actual Transmission Electric Power Costs - The cost incurred by Operator for transmission electric power used at Operator's Pleasant Valley compressor station located in Fairfax County, Virginia and Loudoun compressor station located in Loudoun County, Virginia.