Equipment Under Test definition

Equipment Under Test or “EUT” means the equipment being tested.

Examples of Equipment Under Test in a sentence

  • Equipment Under Test (EUT) Information3.1 General Information 3.2 General LTE SAR Test and Reporting Considerations 4.

  • The test results presented in this report relate only to the product tested.In this report, the sample tested will be referred to as Equipment Under Test (EUT).

  • Clause Reviewed by: Wii ChangReport Producer: Natasha Hsieh1 General Description1.1 Product Feature of Equipment Under Test Remark: The above EUT's information was declared by manufacturer.

  • The OVO and OVI units submitted for testing were divided into five units, referred to as Equipment Under Test (EUT’s), during test performance.

  • Equipment meets the specific requirements if the TEC (Total Energy Consumption) of the EUT (Equipment Under Test) is equal to or less than the AEA (Annual Energy Allowance) of the EUT.The AEA (Annual Energy Allowance) for a specific EUT is determined by summing the relevant allowances specified in Tables 2 and 3 for base and additional functionalities (see section 8.1).The TEC (Total Energy Consumption) of the EUT (Equipment Under Test) is calculated with the following procedure.

  • This section provides a description of the Equipment Under Test (EUT), configurations, operating conditions, and performance acceptance criteria.

  • Also referred to as Module Integrator.• OPN = Orderable Part Number – the part number used when customers place component orders.• DUT/EUT = Device Under Test / Equipment Under Test – the device/equipment being tested.• SAR = Specific Absorption Rate.

  • The test record, data evaluation & Equipment Under Test (EUT) configurations represented herein are true and accurate accounts of the measurements of the sample’s EMC characteristics under the conditions specified in this report.

  • This high power unit is especially suited for rapidly making tests in the shielded room.When used with the Type 6220-1A (or 6220-2) Audio Isolation Transformer, the combination enables the injection of sine wave audio voltages into active power lines supplying power to an Equipment Under Test (EUT).

  • DECLARATION OF CONFORMITY The Equipment Under Test (EUT) was found to MEET the requirements as described within the specification of Title 47 CFR FCC, Part 90, Subpart J, and Part 2.1053 Radiated Spurious Emissions for a low-power non-broadcast transmitter.

Related to Equipment Under Test

  • S&P CDO Monitor Test A test that will be satisfied on any date of determination (following receipt, at any time on or after the S&P CDO Monitor Election Date, by the Issuer and the Collateral Administrator of the Class Break-even Default Rates for each S&P CDO Monitor input file (in accordance with the definition of “Class Break-even Default Rate”)) if, after giving effect to a proposed sale or purchase of an additional Collateral Obligation, the Class Default Differential of the Highest Ranking Class of the Proposed Portfolio is positive. The S&P CDO Monitor Test will be considered to be improved if the Class Default Differential of the Proposed Portfolio that is not positive is greater than the corresponding Class Default Differential of the Current Portfolio.

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • Data Processing Equipment means any equipment, computer hardware, or computer software (and the lease or licensing agreements related thereto) other than Personal Computers, owned or leased by the Failed Bank at Bank Closing, which is, was, or could have been used by the Failed Bank in connection with data processing activities.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Cannabis testing facility means an entity registered by

  • Automatic tabulating equipment means apparatus that automatically examines

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Critical Test Concentration or "(CTC)" means the specified effluent dilution at which the Permittee is to conduct a single-concentration Aquatic Toxicity Test.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Structural component means a component that supports non-variable forces or weights (dead loads) and variable forces or weights (live loads).

  • All-terrain type II vehicle means the same as that term is defined in Section 41-22-2.

  • Structural components means liners, leachate collection systems, final covers, run-on/run-off systems, and any other component used in the construction and operation of the MSWLF that is necessary for protection of human health and the environment.

  • Original component manufacturer means an organization that designs and/or engineers a part and is entitled to any intellectual property rights to that part.

  • Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.

  • Marijuana testing facility means an entity licensed to analyze and certify the safety and potency of marijuana.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Combustion turbine means an enclosed fossil or other fuel-fired device that is comprised of a compressor, a combustor, and a turbine, and in which the flue gas resulting from the combustion of fuel in the combustor passes through the turbine, rotating the turbine.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • All-terrain type I vehicle means the same as that term is defined in Section 41-22-2.

  • Wind Turbine means a mechanical/electrical system that converts the kinetic energy of blowing wind into mechanical or electric power.

  • Collateral Quality Test means a test that is satisfied if, as of any date of determination, in the aggregate, the Collateral Loans owned (or in relation to a proposed acquisition of a Collateral Loan, both owned and proposed to be owned) by the Borrower satisfy each of the tests set forth below, calculated in each case in accordance with Section 1.3: