Estimated assessment definition

Estimated assessment means, with respect to each property to be assessed in connection with a local improvement, the total assessment that, at the time of giving notice of the assessment and the right to object or remonstrate, the local government estimates will be levied against the property following completion of the local improvement. The estimate shall be based on the local government’s estimate at that time of the actual costs of the local improvement and the proposed formula for apportioning the actual costs to the property.
Estimated assessment means an estimated assessment made by the Authority under Article 26 of this Proclamation;

Examples of Estimated assessment in a sentence

  • Table 2: Estimated assessment times for safety cases and notificationsA Design Notification must be provided to the CER at least 6 months before a Production Safety Case is submitted, unless otherwise agreed by the CER, but it is recognised that for most Design Notifications the timescale for submission prior to a Production Safety Case will be significantly greater than this.The assessment of an application for an AoC does not have an associated statutory time limit.

  • Costs of assessment (€)*Number of beneficiaries Total benefits (€)Admin costs/benefits(%)20154,9411,935100,42710,29410,236,5870.9820164,9982,002101,58511,36211,659,5330.8720174,2121,50885,61011,92212,254,7640.7020186,2411,885126,85012,46012,915,2770.98Source: Moj Termin.Note: *Estimated assessment cost assumes full cost coverage with charging MKD 1,250 per assessment.

  • This history explains the development of an elaborate procedural and accountability paperwork system of MDTs and IEPs. In the districts interviewed: • Estimated assessment costs for the Multidisciplinary Team (MDT) averaged about $1500 per student, but could range from $300 to $2400 per student assessment.

  • Estimated assessment is completed by the RRCO as follows: The tax officer shall issue a demand notice as per for CIT, BIT units and for PIT taxpayers, showing the full tax liability, any tax payments made and the balance payable.

  • Estimated assessment shall be based on one or more of the following: • Tax returns filed for the last three years.• Import and export figures available with the Department.• Information from third parties such as customers.• Taxes paid by other similar units.• Taxes paid on an estimated basis in the previous year plus an appropriate increase.• Any other information available on the taxpayer.

  • Bids were received for decorative street lights for the following locations: 1st Street NW (4th Avenue to 1st Drive NW); 4th Avenue NE (9th Street to 10th Street NE); and 10th Street NE; and 2nd Avenue to 4th Avenue NE).Bids are as follows: Contractor Amount Fox Electric $53,825.00 Estimated assessment is $13.35 per linear foot.

  • LANDSCAPE MAINTENANCE DISTRICT FEES(CFD-2) 18 Lots(anticipated maintenance cost) @ $31.46 per Lot $566.28 F7Lots(Incidental expenses:legal fees, per Lot publications,mailings,engineering, ($1,500 ,aassessment district proceedings @ $0.00 min) $1 500.00 Xxx Sum Landscape area Field Inspection Fee-Parks @ $305.00 LS $305.00 Total $2 371.28 $2 371.28 $41.46 Estimated assessment per Lot(information only) 7.

  • Estimated assessment shall be based on one or more of the following:▪ Tax returns filed for the last three years.▪ Import and export figures available with the Department.▪ Information from third parties such as customers.▪ Taxes paid by other similar units.▪ Taxes paid on an estimated basis in the previous year plus an appropriate increase.▪ Any other information available on the taxpayer.

  • The following assumptions should be built into the FY11 budget plans at this time:  Estimated assessment cost of 1.25% of projected FY11 salaries Account code used for budgeting the expected assessment is 820200 – Enterprise Assessment-Final Budget Only.

  • Estimated assessment rate for bituminous is $151 and for concrete is$228.

Related to Estimated assessment

  • Cost Estimate means the detailed projected expenditure, including material costs and overhead, equipment costs and overhead, labor costs and overhead, and all taxes associated with each major material and service component, required for a line extension. It shall also separately identify any incremental costs associated with providing premium services. The Company may, for the purpose of standardization, establish standard construction cost estimates, for basic or premium service plans, which shall not exceed, in any event, the average cost of constructing such line extensions in the area involved, in which case the term “cost estimate” as used in this section will be understood to mean the standard estimate thus established.

  • Phase I assessment as described in, and meeting the criteria of, (i) Chapter 5 of the FNMA Multifamily Guide or any successor provisions covering the same subject matter in the case of a Specially Serviced Mortgage Loan as to which the related Mortgaged Property is multifamily property or (ii) the American Society for Testing and Materials in the case of Specially Serviced Mortgage Loan as to which the related Mortgaged Property is not multifamily property.

  • Needs assessment means a study or statistical analysis that examines the need for ground ambulance service within a service area or proposed service area that takes into account the current or proposed service area’s medical, fire, and police services.

  • Assessment area means an area, or, if more than one area is designated, the

  • Estimate means to be based on technical evaluation of the sources contributing to the discharge including, but not limited to, pump capabilities, water meters, and batch discharge volumes.

  • Assessment Report : means the assessment report referred to in Articles 32(2) and 33(3) of Regulation (EC) No 834/2007 drawn up by an independent third party fulfilling the requirements of ISO Standard 17011 or by a relevant competent authority, which includes information on document reviews, including the descriptions referred to in Articles 4(3)(b) and 11(3)(b) of this Regulation, on office audits, including critical locations and on risk-oriented witness audits conducted in representative third countries.

  • conformity assessment means the process demonstrating whether the requirements of this Regulation relating to a device have been fulfilled;

  • Preliminary assessment means the first phase in the process of identifying areas of concern and determining whether contaminants are or were present at a site or have migrated or are migrating from a site, and shall include the initial search for and evaluation of, existing site specific operational and environmental information, both current and historic, to determine if further investigation concerning the documented, alleged, suspected or latent discharge of any contaminant is required. The evaluation of historic information shall be conducted from 1932 to the present, except that the department may require the search for and evaluation of additional information relating to ownership and use of the site prior to 1932 if such information is available through diligent inquiry of the public records.

  • Environmental Assessment means an assessment of the presence, storage or release of any hazardous or toxic substance, pollutant or contaminant with respect to the collateral securing a Shared-Loss Loan that has been fully or partially charged off.

  • self-assessment means an assessment made by a taxpayer or his representative under section 28;

  • conformity assessment body means a body that performs conformity assessment activities including calibration, testing, certification and inspection;

  • Estimated Closing Statement has the meaning set forth in Section 2.4(a).

  • Estimated Project Cost means Benchmark cost of MNRE which is Rs 8.00 Crore/MWp as per MNRE letter no. 03/20/2014-15/GCRT/11.12.14 at the time of Bid Due date.

  • Environmental Impact Assessment means a systematic examination conducted to determine whether or not a programme, activity or project will have any adverse impacts on the environment;

  • Comprehensive assessment means the gathering of relevant social, psychological, medical and level of care information by the case manager and is used as a basis for the development of the consumer service plan.

  • Estimated Costs means costs estimated by the Authority as likely to be:

  • Risk assessment means a programme to determine any risk associated with any hazard at a construction site , in order to identify the steps needed to be taken to remove, reduce or control such hazard;

  • Impact Assessment has the meaning given to it in Clause 22.1.3 (Variation Procedure);

  • Phase I means the first part of the tuition incentive assistance program defined as the academic period of 80 semester or 120 term credits, or less, leading to an associate degree or certificate.

  • Phase I Environmental Assessment A “Phase I assessment” as described in, and meeting the criteria of, the ASTM, plus a radon and asbestos inspection.

  • Captured assessed value means the amount in any 1 year by which the current assessed value of the development area, including the assessed value of property for which specific local taxes are paid in lieu of property taxes as determined in subdivision (w), exceeds the initial assessed value. The state tax commission shall prescribe the method for calculating captured assessed value.

  • Estimated Value means the value of the Contract estimated under these Contract and Procurement Regulations.

  • Site Assessment means a Site Assessment as defined in Paragraph 10(c).

  • Environmental impact statement means a detailed written statement as required by section 102(2)(C) of the Act.

  • Acoustic Assessment Report means the report, prepared in accordance with Publication NPC-233 and Appendix A of the Basic Comprehensive User Guide,by HGC Engineering and dated August 22, 2008 submitted in support of the application, that documents all sources of noise emissions and Noise Control Measures present at the Facility and includes all up-dated Acoustic Assessment Reports as required by the Documentation Requirements conditions of this Certificate to demonstrate continued compliance with the Performance Limits following the implementation of any Modification.

  • State Estimator means a computer model that computes the state (voltage magnitudes and angles) of the Transmission System using the network model and real-time measurements. Line flows, transformer flows, and injections at the busses are calculated from the known state and the transmission line parameters. The State Estimator has the capability to detect and identify bad measurements.