Final design phase definition

Final design phase means the time during which design is completed, permits and other permissions are secured so that the project, or staged elements of the project consistent with the project management plan, can proceed to implementation. Final design phase also includes development of a final cost estimate, plans, specifications and a bid package.
Final design phase. An amendment for the final design tasks will be submitted concurrent with the completion of the NEPA/CEQA approvals, as appropriate. THE PANOCHE ROAD BRIDGE OVER TRES PINOS CREEK – BR. NO. 43C-0027 CONTRACTOR shall provide additional services relating to project management services, preparation of plans and specifications, and estimates (bid documents) in accordance with Caltrans Design Standards and Specifications, environmental services to obtain environmental clearance for both the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA), and obtaining all necessary permits from the Local, State and Federal regulatory agencies for the replacement and construction of the new Panoche Road Bridge No. 43C-0025 at the Tres Pinos Creek Crossing, more particularly described as follows:

Examples of Final design phase in a sentence

  • Following the risk assessment, if done for the preliminary design and subsequent final design phase, the Submitter's Final design phase and the risk assessment of the preliminary design, the level of understanding of the alternative and/or equivalency has increased.

  • This was at a distance of approximately 3 to 4 km from the Umgeni River Mouth.

  • The Consultant will review the City’s 90% review comments for incorporation into the Final design phase.

  • Alderman Bill Van Buskirk announced the Police Pension Board Meeting would be meeting on December 7 at 8:00 am in the Police Squad Room.

  • Final design phase shall include preparation of complete detailed plans and specifications, preparation of a traffic control plan in detail appropriate to the complexity of the project, location of existing utilities and underground facilities according to records (as can be determined without digging), preparation of a detailed opinion of probable costand time required to complete construction and providing input to the City as to forms for proposals, construction contracts and bond forms.

  • The Final design phase for this project will include final drawings, specifications and final bid documents.

  • Preliminary design calculation at 90 percent and Final design phase, and • Final Design Notebooks to CITY (2 copies).

  • Make any necessary changes to bring into compliance with USDA regulations. After USDA acceptance, prepare preliminary design phase documents. Furnish three copies to Town within 120 days for review along with an opinion of probable construction cost. Final design phase – prepare final drawings, specifications indicating the scope, extent, and character of work to be performed and furnished by Contractor.

  • Final design phase will not commence until all decisions are final and COP approves the Preliminary Design Letter Report.

  • Once the contract is placed and process agreed, variations will be accepted if duly justified technically via the Deviation Request process.The contract is divided into two phases; final design and manufacturing.- Final design phase: The contract starts with a Kick off Meeting shortly after contract signature, with some preliminary documentation presented, to start the Final Design phase.

Related to Final design phase

  • Design Phase means the period during which the Transporter shall prepare a draft project proposal for publication in accordance with section 4.3;

  • Development Phase means the period before a vehicle type is type approved.

  • Design storm means a hypothetical discrete rainstorm characterized by a specific duration, temporal distribution, rainfall intensity, return frequency, and total depth of rainfall.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Design flow means the average annual flow or average daily flow specified in an approved facilities plan or approved plans and specifications, the flow specified in a WPDES permit, or the flow required to meet performance standards.

  • Maximum medical improvement means a point in time when any medically

  • Mechanical Completion means that (a) all components and systems of the Project have been properly constructed, installed and functionally tested according to EPC Contract requirements in a safe and prudent manner that does not void any equipment or system warranties or violate any permits, approvals or Laws; (b) the Project is ready for testing and commissioning, as applicable; (c) Seller has provided written acceptance to the EPC Contractor of mechanical completion as that term is specifically defined in the EPC Contract.

  • piece-work means any system by which earnings are calculated upon the quantity or output of work performed;

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Tenant Improvements Defined in Exhibit B, if any.

  • Design-build means a project delivery method in which the detailed design and subsequent construction is provided through a single contract with a Design-Build firm; a team, partnership, or legal entity that includes design professionals and a builder. The Design-Build Project delivery shall be implemented in accordance with Tex. Gov’t Code § 2166.2531.2

  • Tenant Improvement Work means the construction of the Tenant Improvements, together with any related work (including demolition) that is necessary to construct the Tenant Improvements.

  • drainage work means any watercourse and includes any land which is expected to provide flood storage capacity for any watercourse and any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage or flood defence;

  • Design-Build Agreement means the design and construction agreement between Project Co and the Design-Builder, a certified copy of which has been delivered by Project Co to the Authority, as amended, supplemented or replaced from time to time in accordance with this Agreement;

  • design pressure means the maximum pressure that a pressure vessel or plant is designed to withstand safety when operating normally;

  • industrial design means features of shape, configuration, pattern or ornament applied to an article by any industrial process or means, being features which in the finished article appeal to and are judged by the eye, but does not include—

  • tidal work means so much of any work authorised by this Order as is on, under or over tidal waters or tidal lands below the level of high water;

  • Study Completion means the database for the Study has been locked and all Essential Documents have been provided to the Sponsor, including a copy of the letter from the Reviewing HREC acknowledging receipt of the final report and/or closure letter from the Principal Investigator.

  • Site Improvements means any construction work on, or improvement to, streets, roads, parking facilities, sidewalks, drainage structures and utilities.

  • Design-build team means an entity that consists of:

  • Minimum Improvements means the acquisition of land and construction of a 152-unit market rate residential apartment building, construction of a stormwater pond and related improvements. The Minimum Improvements are more fully depicted in Exhibit B, which is attached hereto and incorporated herein.

  • Maximum design heat input means the ability of a unit to combust a stated maximum amount of fuel per hour on a steady state basis, as determined by the physical design and physical characteristics of the unit.

  • Design Development Documents means the Drawings, Specifications and other documents prepared by the Trade Contractor that establish and describe the size and character of the Trade Contractor Work as to architectural, civil, structural, mechanical and electrical systems, graphics and signage, and other elements, and which include typical construction details, equipment layouts and specifications that identify major materials and systems.

  • Design-Builder means the Person selected pursuant to the RFP that enters into the Contract with the Department to design and construct the Project (also referred to as the “Design-Build Team”).

  • The Works/Project means the works to be executed or done under this contract.

  • Remedial Design or “RD” shall mean those activities to be undertaken by SDs to develop final plans and specifications for the RA as stated in the SOW.