Final Map Parcel definition

Final Map Parcel means a Parcel designated for new development, which is part of a Final Subdivision Map. Once a Parcel is classified as a Final Map Parcel it shall remain a Final Map Parcel.

Examples of Final Map Parcel in a sentence

  • The records indicated that the parcels transferred ownership from a builder/developer to a homeowner since the formation of the CFD 2006-2.A Final Map Parcel is a Single-Family Residential Parcel or Multifamily Parcel created by the recordation of a Final Map on a Large Lot Parcel.

  • At the time the Final Map, Parcel Map, Parcel Map Waiver documents, Record of Survey, Amending Map, Certificate of Correction or Corner Record is submitted for checking; the map checking fees shall be deposited with the Department of Public Works in an amount established by the Board of Supervisors by resolution.

  • The records indicated that the parcels transferred ownership from a builder/developer to a homeowner since the formation of CFD 2006–1.A Final Map Parcel is a Single-Family Residential Parcel or Multifamily Parcel created by the recordation of a Final Map on a Large Lot Parcel.

  • In addition, each such Fiscal Year, Taxable Poperty shall be further classified by the CFD Administrator as a Developed Parcel, Final Map Parcel, or Undeveloped Parcel.

  • The applicant shall have a Final Map (Parcel Map) prepared by a registered engineer (licensed prior to 01/01/1982: registration number 33,965 or lower) or licensed land surveyor delineating all parcels and easements created.

  • The property owner may initiate the alternate security provisions authorized by this This Section prior to the recordation of a Final Map, Parcel Map, Reversion to Acreage Map, Parcel Map Waiver, Lot Merger, Lot Line Adjustment or Conditional Certificate of Compliance.

  • Buxkemper, Deputy City Clerk Exhibit A – Final Map Parcel Map PR 16-0193Exhibit AFinal Map PR 16-0193 WHEN RECORDED RETURN TO:ENGINEERING DIVISIONCITY OF EL PASO DE ROBLES 1000 SPRING STREETPASO ROBLES, CA 93446FOR RECORDER USE ONLY SUBDIVISION IMPROVEMENT AGREEMENT DATE OF AGREEMENT: NAME OF SUBDIVIDER: Oriole-Paso, Inc.

  • Submit a request for monumentation inspection, and two blue line prints of the Final Map (Parcel Map) to the City Engineering Department.

Related to Final Map Parcel

  • Interior lot means a lot other than a corner lot.

  • Closing Date Mortgaged Property as defined in Section 3.1(h).

  • Interior of the dwelling unit means the inside of the dwelling unit, consisting of interior walls,

  • Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Jumbo Mortgage Loan Unless defined otherwise in the Transactions Terms Letter, a first lien Mortgage Loan (i) for which the original loan amount is greater than the applicable conventional conforming loan limits set by the Federal Housing Finance Authority in the jurisdiction where the related Mortgaged Property is located and (ii) which meets the transaction requirements set forth on Schedule 1 of the Transactions Terms Letter.

  • Water Surface Elevation (WSE means the height, in relation to NAVD 1988, of floods of various magnitudes and frequencies in the floodplains of riverine areas.

  • Condominium Project Real estate including the separate ownership in fee, or on a satisfactory leasehold estate, of a particular residential unit with an indivisible interest in the real estate designated for common ownership strictly by unit owners.

  • Subsequent Mortgage Loans means, for purposes of this Agreement, the Subsequent Mortgage Loans listed in the Subsequent Mortgage Loan Schedule attached hereto as Schedule I.

  • Subsequent Mortgage Loan A Mortgage Loan sold by the Depositor to the Trust Fund pursuant to Section 2.08, such Mortgage Loan being identified on the Mortgage Loan Schedule attached to a Subsequent Transfer Instrument.

  • Underground storage tank system means an underground storage tank and the connected underground piping, underground ancillary equipment, and containment system, if any.

  • Regulatory Flood Protection Elevation means the “Base Flood Elevation” plus the “Freeboard”. In “Special Flood Hazard Areas” where Base Flood Elevations (BFEs) have been determined, this elevation shall be the BFE plus two (2) feet of freeboard. In “Special Flood Hazard Areas” where no BFE has been established, this elevation shall be at least two (2) feet above the highest adjacent grade.

  • Additional Mortgaged Property shall have the meaning provided in Section 8.11(a).

  • Underground storage tank or “UST” means any one or combination of tanks (including underground pipes connected thereto) that is used to contain an accumulation of regulated substances, and the volume of which (including the volume of underground pipes connected thereto) is 10 percent or more beneath the surface of the ground. This term does not include any:

  • Substitute Property shall have the meaning set forth in Section 2.6 hereof.

  • Condominium Property means the lands, leaseholds, and personal property that are subjected to condominium ownership, whether or not contiguous, and all improvements thereon and all easements and rights appurtenant thereto intended for use in connection with the condominium.

  • Pool 1 Mortgage Loans Any Mortgage Loan in Pool 1.

  • Park Monaco Mortgage Loans The Mortgage Loans identified as such on the Mortgage Loan Schedule for which Park Monaco is the applicable Seller.

  • Parcel means an identifiable unit of land that is treated as separate for valuation or zoning purposes.

  • Class P Mortgage Loan Any of the Class I-P, Class II-P or Class III-P Mortgage Loans.

  • Base Flood Elevation (BFE means a determination of the water surface elevations of the base flood as published in the Flood Insurance Study. When the BFE has not been provided in a “Special Flood Hazard Area”, it may be obtained from engineering studies available from a Federal, State, or other source using FEMA approved engineering methodologies. This elevation, when combined with the “Freeboard”, establishes the “Regulatory Flood Protection Elevation”.

  • Underground facility means any item which shall be buried or placed below ground for use in connection with the storage or conveyance of water, sewage, electronic, telephone or telegraphic communications, electric energy, oil, gas or other substances, and shall include, but not be limited to pipes, sewers, conduits, cables, valves, lines, wires, manholes, attachments and those portions of poles and their attachments below ground.

  • Plant Site (Works, Factory) means the local integration of one or more plants, with any intermediate administrative levels, which are under one operational control, and includes common infrastructure, such as:

  • Flood Elevation Study means an examination, evaluation and determination of flood hazards and, if appropriate, corresponding water surface elevations, or an examination, evaluation and determination of mudslide (i.e., mudflow) or flood-related erosion hazards.

  • apartment building means a residential use building, or the residential use portion of a mixed-use building, other than a townhouse or stacked townhouse containing four or more dwelling units each of which shall have access to above grade common halls, stairs, elevators, and yards;

  • Public building means any structure, including exte- rior parts of the building, such as a porch, exterior platform or steps providing means of ingress or egress, used in whole or in part as a place of resort, assemblage, lodging, trade, traffic, occupancy, or use by the public or by 3 or more tenants.

  • Aboveground storage tank shall have the meaning ascribed to such term in Section 6901 et seq., as amended, of RCRA, or any applicable state or local statute, law, ordinance, code, rule, regulation, order ruling, or decree governing aboveground storage tanks.