Consent Decree means this Consent Decree and all appendices attached hereto. In the event of conflict between this Consent Decree and any appendix, this Consent Decree shall control.
Construction Completion Certificate means a certificate of the I-Bank to the effect that the construction of the Project is complete.
Minimum Extended Summer Resource Requirement means, for Delivery Years through May 31, 2017, the minimum amount of capacity that PJM will seek to procure from Extended Summer Demand Resources and Annual Resources for the PJM Region and for each Locational Deliverability Area for which the Office of the Interconnection is required under Tariff, Attachment DD, section 5.10(a) to establish a separate VRR Curve for such Delivery Year. For the PJM Region, the Minimum Extended Summer Resource Requirement shall be equal to the RTO Reliability Requirement minus [the Limited Demand Resource Reliability Target for the PJM Region in Unforced Capacity]. For an LDA, the Minimum Extended Summer Resource Requirement shall be equal to the LDA Reliability Requirement minus [the LDA CETL] minus [the Limited Demand Resource Reliability Target for such LDA in Unforced Capacity]. The LDA CETL may be adjusted pro rata for the amount of load served under the FRR Alternative.
Progress Assessment Report (PAR means the monthly compliance report to Owner verifying compliance with the HUB subcontracting plan (HSP).
SWS wage assessment agreement means the document in the form required by the Department of Education, Employment and Workplace Relations that records the employee’s productive capacity and agreed wage rate
Special Conditions means Special Conditions of Contract, which override the General Conditions, also referred to as SCC.
Construction sign means a sign which identifies the architect, engineers, contractors and other individuals or firms involved with the construction of a building, or announces the character of the building or enterprise, which is erected during the building construction period.
Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.
Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.
Ground sign means a sign directly supported by the ground without the aid of any other building or structure, which sign includes the names of owner(s) and/or tenant(s) and address and/or advertises goods, products, services or events that are sold, offered, or provided on the premises on which the sign is located and does not include any other sign defined in this By-law;
Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.
Construction Completion means physical construction of a cleanup action component is complete.
Water Surface Elevation (WSE means the height, in relation to NAVD 1988, of floods of various magnitudes and frequencies in the floodplains of riverine areas.
Special Condition means a condition of a Transporter's Licence or Shipper's Licence other than a Standard Condition;
Final completion and acceptance means the stage in the progress of the work as determined by the Contracting Officer and confirmed in writing to the Contractor, at which all work required under the contract has been completed in a satisfactory manner, subject to the discovery of defects after final completion, and except for items specifically excluded in the notice of final acceptance.
Water surface elevation means the height, in relation to the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, where specified, of floods of various magnitudes and frequencies in the floodplains of riverine areas.
Contract Amendment means a written document signed by the Procurement Officer that is issued for the purpose of making changes in the Contract.
Construction Completion Date means the Completion Date of the Construction as specified in the Statutory Declaration of Completion for the Project;
Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;
Acoustic Assessment Report means the report, prepared in accordance with Publication NPC-233 and Appendix A of the Basic Comprehensive User Guide,by HGC Engineering and dated August 22, 2008 submitted in support of the application, that documents all sources of noise emissions and Noise Control Measures present at the Facility and includes all up-dated Acoustic Assessment Reports as required by the Documentation Requirements conditions of this Certificate to demonstrate continued compliance with the Performance Limits following the implementation of any Modification.
Multiple project assurance contract means a contract between an institution and the federal
Informed Financial Consent means the medical provider advises you of any out-of-pocket costs before your admission. This is called Informed Financial Consent.
Site Plan means a document or map that may be required by a county during a preliminary review preceding the issuance of a building permit to demonstrate that an owner's or developer's proposed development activity meets a land use requirement.
General Condition means these General Terms and Conditions of Contract.
Construction and demolition waste means the waste building materials, packaging, and rubble resulting from construction, remodeling, repair, and demolition operations on pavements, houses, commercial buildings and other structures.
Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;