Frequency Band Plan definition

Frequency Band Plan means the Frequency Band Plan of Namibia published under General Notice No. 424 of 28 October 2016;
Frequency Band Plan means a table setting out the allocations of various frequency bands for use by one or more radio communication services under specified conditions;
Frequency Band Plan means the manifestations of the actions of the Authority to exercise control over and manage the radio frequency spectrum in accordance with accepted international standards and subject to the provisions of the Act:

Examples of Frequency Band Plan in a sentence

  • Multipoint Distribution System Frequency Band Plan 2000 The Multipoint Distribution System Frequency Band Plan 2000 is revoked.

  • The Frequency Band Plan for Namibia sets out what radio services can use which frequencies as well as the pre-conditions of use as applicable.

  • The spectrum band 3600 MHz to 3800 MHz allocated to fixed/wirelesss broadband access services in terms of Regulations Setting out the Frequency Band Plan for Namibia has limited vacant spectrumavailable.

  • The spectrum 885-890 MHz and 930-935 MHz forms part of the 900 MHz allocated to MOBILE, on a primary basis, except aeronautical mobile services as set out in the Frequency Band Plan of Namibia published in Government Gazette No. 6160, General Notice No. 424 dated 28 October 2016.

  • The Authority is required to consult on a draft version of a Frequency Band Plan.

  • This Frequency Band Plan does not apply to spectrum that has been designated to be allocated by issuing spectrum licences.Note On 7 October 2000, the Minister for Communications, Information Technology and the Arts designated the frequency band 2110–2170 MHz in parts of Australia as part of the spectrum to be allocated by issuing spectrum licences.

  • The said frequency band plan is also aligned with the SADC Radio Frequency Band Plan 2020 to ensure regional harmonisation in the use of radio frequency spectrum.

  • The Licensee shall comply in its use of the frequencies specified on the spectrum licence certificate to ITU regulations and recommendations and the Frequency Band Plan for Namibia as published in the Government Gazette from time to time.The Licensee must prevent harmful interference with other licensees in the same or adjacent spectrum bands.

  • An abbreviated Table of the expected timeline for the establishment of the RQZ is shown below: AMWRQZ The Radiocommunications Act 1992, which provides the legislative backbone for the Mid West RQZ, can only be amended or overturned though a motion to the full Parliament of the Australian Government.A frequency band plan, such as Mid-West Radio Quiet Zone Frequency Band Plan 2011, is a legislative instrument under the Radiocommunications Act 1992.

  • The Authority has published the National Frequency Band Plan aligned to the outcome of the ITU WRC-19 in Government Gazette No. 7617, General Notice No. 448 on 31 August 2021.


More Definitions of Frequency Band Plan

Frequency Band Plan means a frequency band plan developed under Section 93.
Frequency Band Plan means a plan prepared under section 32;
Frequency Band Plan means the table setting out the allocations of various frequency bands for use by one or more radio communications service under specified conditions, as publishedfrom time to time in the Government Gazette in terms of section 29 of the Telecommunications Act;
Frequency Band Plan means a table setting out the allocations of various
Frequency Band Plan means the Frequency Band Plan of Namibia published under General Notice No. 424 of 28 October 2016 or amended/replaced from time to time;

Related to Frequency Band Plan

  • frequency ride through as used herein shall mean the ability of a Small Generating Facility to stay connected to and synchronized with the system or equipment of the Transmission Owner and any Affected Systems during system disturbances within a range of under-frequency and over- frequency conditions, in accordance with Good Utility Practice and consistent with any standards and guidelines that are applied to other generating facilities in the Balancing Authority Area on a comparable basis. The term “voltage ride through” as used herein shall mean the ability of a Small Generating Facility to stay connected to and synchronized with the system or equipment of the Transmission Owner and any Affected Systems during system disturbances within a range of under-voltage and over-voltage conditions, in accordance with Good Utility Practice and consistent with any standards and guidelines that are applied to other generating facilities in the Balancing Authority Area on a comparable basis.

  • Semi-annual (2/Year) sampling frequency means the sampling shall be done during the months of June and December, unless specifically identified otherwise.

  • Semi-annual (2/Year) sampling frequency means the sampling shall be done during the months of June and December, unless specifically identified otherwise.

  • Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.

  • Lowest Achievable Emission Rate (LAER) means, for any source, the more stringent rate of emissions based on the following:

  • Modular building manufacturer means a person or corporation who owns or operates a

  • Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.

  • Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.

  • Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.

  • Non-Administrator Ambulatory Surgical Facility means an Ambulatory Surgical Facility which does not meet the definition of an Administrator Ambulatory Surgical Facility.

  • Method Detection Limit (MDL means the minimum concentration of a substance (analyte) that can be measured and reported with 99 percent confidence that the analyte concentration is greater than zero and is determined from analysis of a sample in a given matrix containing the analyte.

  • Planned External Financed Generation Capacity Resource means a Planned External Generation Capacity Resource that, prior to August 7, 2015, has an effective agreement that is the equivalent of an Interconnection Service Agreement, has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close, and has secured at least 50 percent of the MWs of firm transmission service required to qualify such resource under the deliverability requirements of the Reliability Assurance Agreement.

  • Statewide popular election means a general election in which votes are cast for

  • Application Programming Interface or “API” means the application programming interface materials and related documentation containing all data and information to allow skilled Software developers to create Software interfaces that interface or interact with other specified Software.

  • Statewide special election means a special election called by the governor or the

  • Variable-aperture beam-limiting device means a beam-limiting device which has capacity for stepless adjustment of the x-ray field size at a given SID.

  • Disabled parking license plate means a license plate that displays the international symbol of access

  • Basic Comprehensive User Guide means the Ministry document titled Basic Comprehensive Certificates of Approval (Air) User Guide” dated April 2004 as amended.

  • Stinger-steered automobile or watercraft transporter means an automobile or watercraft transporter

  • Net metering period means the 12-month period following the date of final interconnection of the

  • Minimum Generation Emergency means an Emergency declared by the Office of the Interconnection in which the Office of the Interconnection anticipates requesting one or more generating resources to operate at or below Normal Minimum Generation, in order to manage, alleviate, or end the Emergency.

  • System for Award Management (SAM means the primary Government repository for prospective Federal awardee and Federal awardee information and the centralized Government system for certain contracting, grants, and other assistance-related processes. It includes—

  • Useful beam means the radiation emanating from the tube housing port or the radiation head and passing through the aperture of the beam-limiting device when the exposure controls are in a mode to cause the system to produce radiation.

  • System for Award Management (XXX) means the Federal repository into which an Entity must enter the information required under the Transparency Act, which may be found at xxxx://xxx.xxx.gov.

  • Maximum Generation Emergency Alert means an alert issued by the Office of the Interconnection to notify PJM Members, Transmission Owners, resource owners and operators, customers, and regulators that a Maximum Generation Emergency may be declared, for any Operating Day in either, as applicable, the Day-ahead Energy Market or the Real-time Energy Market, for all or any part of such Operating Day.

  • Hard cider means the same as that term is defined in 26 U.S.C. Sec. 5041.