Geological and Geophysical Survey definition

Geological and Geophysical Survey means a survey carried out in the search for Petroleum using either of these methods: seismic, gravity, magnetic, electrical, electromagnetic, geochemical, Well logging and any other methods approved by the Ministry;

Examples of Geological and Geophysical Survey in a sentence

  • Extensive work by Western Mining Corporation between 1934 to 1937 with Aerial Geological and Geophysical Survey of Northern Australia (AGGNSA) between 1937 to 1940.

  • Geological and Geophysical Survey (G&G Survey) serves as a collective term for surveys that collect data on the geology of the seafloor and landforms below the seafloor.

  • Where the Geological and Geophysical Survey identifies a prospect, the Authorised Person shall seek the approval of the Ministry for the name of the prospect.

  • The Chinese people in the Netherlands originate from different countries, such as: the Peoples Republic of China, Hong Kong, Taiwan, Indonesia, Surinam, Viet- nam and Singapore.

  • To achieve this, the HV busbars at EHV to HV substations will be controlled by means of Automatic Voltage Control (AVC) relays controlling the tap-changers of the transformers feeding that busbar.

  • Secure VoIP provides talker-to-listener security and session-unique security levels.

  • The lease is less clear about the requirements that BOEM intends to apply to North Atlantic right whales for HRGS and Geotechnical activities prior to the approval of the Site Assessment Plan.For example, the lease addresses HRGS and Geotechnical Sampling together in Section 4.3 – Geological and Geophysical Survey Requirements – but does not specifically reference any separate standards that would apply to the North Atlantic right whale.

  • According to mapping completed by the State of Alaska’s Division of Geological and Geophysical Survey, the entire City is underlain by discontinuous permafrost (Figure 5-5).

  • Minister of Natural Resources and the Environment [Mr. Persaud]: The Guyana Geology and Mines Commission has received thirty two (32) applications in 2010 for Prospecting Permit Medium Scale in the New River Triangle area but none was granted.One permission for Geological and Geophysical Survey (PGGS) was issued to Muri Brasil Ventures Inc.

  • The Governing Bodies receive information relating to the quantification of the main risks to which the Group is exposed and the capital resources available to cover them, as well as information relating to compliance with the established Risk Appetite limits and other specific risk policies.

Related to Geological and Geophysical Survey

  • Engineering means the application of scientific knowledge for the design, control, or use of building structures, equipment, or apparatus.

  • Surveys has the meaning set forth in Section 4(o) above.

  • Geotechnical engineer means a professional engineer registered with the Association of Professional Engineers, Geologists, and Geophysicists of the Northwest Territories and whose principal field of specialization is the design and construction of earthworks in a permafrost environment;

  • Reservoir means a porous and permeable underground formation containing a natural accumulation of producible oil or gas that is confined by impermeable rock or water barriers and is individual and separate from other reservoirs.

  • Systems Engineering means preparing specifications, identifying and resolving interface problems, developing test requirements, evaluating test data, and supervising design.

  • Environmental Consultant has the meaning set forth in Section 5.17(a).

  • Subsurface tracer study means the release of a substance tagged with radioactive material for the purpose of tracing the movement or position of the tagged substance in the well-bore or adjacent formation.

  • Soil means all unconsolidated mineral and organic material of any origin.

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.

  • Archaeological site means a geographic locality in Washington, including but not limited to, submerged and submersible lands and the bed of the sea within the state's jurisdiction, that contains archaeological objects.

  • Studies means activities needed to prepare project implementation, such as preparatory, mapping, feasibility, evaluation, testing and validation studies, including in the form of software, and any other technical support measure, including prior action to define and develop a project and decide on its financing, such as reconnaissance of the sites concerned and preparation of the financial package;

  • Structural Engineer means the Engineer appointed or to be appointed from time to time by Promoter for the preparation of the structural design and drawings of the buildings .

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Environmental Management Framework and “EMF” mean the framework of the Borrower for the management of social and environmental aspects of the Project dated April 24, 2007 and disclosed to the public on even date therewith, as may be amended from time to time with the prior approval of the Bank.

  • Survey means a survey of the Property prepared by a surveyor licensed in the State and satisfactory to Lender and the company or companies issuing the Title Insurance Policy, and containing a certification of such surveyor satisfactory to Lender.

  • Engineering Reports has the meaning assigned such term in Section 2.07(c)(i).

  • Regulatory Floodway means the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height.

  • Environmental Reports means each and every “Phase I Environmental Site Assessment” (and, if applicable, “Phase II Environment Site Assessment”) as referred to in the ASTM Standards on Environmental Site Assessments for Commercial Real Estate, E 1527-2000 and an asbestos survey, with respect to each Mortgaged Property, prepared by one or more Environmental Auditors and delivered to Lender and any amendments or supplements thereto delivered to Lender.

  • Architect/Engineer (A/E means a person registered as an architect pursuant to Tex. Occ. Code Ann., Ch. 1051, as a landscape architect pursuant to Tex. Occ. Code Ann., Ch. 1052, a person licensed as a professional engineer pursuant Tex. Occ. Code Ann., Ch. 1001, and/or a firm employed by Owner or Design-Build Contractor to provide professional architectural or engineering services and to exercise overall responsibility for the design of a Project or a significant portion thereof, and to perform the contract administration responsibilities set forth in the Contract.

  • The Works/Project means the works to be executed or done under this contract.

  • Environmental Site Assessment means a Phase I environmental report meeting the requirements of the American Society for Testing and Materials, and, if in accordance with customary industry standards a reasonable lender would require it, a Phase II environmental report, each prepared by a licensed third party professional experienced in environmental matters.

  • Phase I Environmental Site Assessment means a Phase I environmental property assessment of the Assets that satisfies the basic assessment requirements set forth under the current ASTM International Standard Practice for Environmental Site Assessments (Designation E1527-13) or any other visual site assessment or review of records, reports or documents.

  • Surface mining means mining by removing the overburden lying above the natural deposits and excavating directly from the natural deposits exposed, or by excavating directly from deposits lying exposed in their natural state and shall include dredge operations conducted in or on natural waterways or artificially created waterways within the state.

  • Environmental Review means the Federal

  • Surface waters means all waters of the state as defined in G.S. 143-212 except underground waters